Skip to main content

Third import

Suitable EnviromentSaaS
Private Deployment

Requirements​

ONES@ones-op/node-third-import
v3.11.39+v0.1.2+

Overview​

Sometimes we need to import third data into ONES in batches. Due to the need to connect with different third parties, plugins are generally used to realize data conversion and import. The third import ability defines a set of data import specifications and processes, which simplifies the process of plugin importing data to ONES, and only needs to implement data conversion according to the specifications to complete the import.

Usage​

Implementation principle​

The entire data import process is started by the plugin calling startImport, and then ONES starts to call the plugin method for different data types to obtain data. Each data type will be called multiple times until the plugin returns an empty array. When the import of all data types is complete or an error occurs during the import process, the plugin will be notified of the result of this import.

Step 1: Installation dependency​

Enter the /backend directory of the plugin project, and execute the following command for dependent installation:

npm i @ones-op/node-third-import

Step 2: Add configuration​

Use npx op add ability to add third-import@1.0.0 type ability. Generate the backend/src/third-import.ts file and add ability configuration in the plugin configuration file.

Example configuration:

config/plugin.yaml
abilities:
- id: 5I-CjPX_
name: third-party import
version: 1.0.0
abilityType: ThirdImport
function:
importFunc: importFunc
notifyFunc: notifyFunc

In config of abilities, plug-in developers can manually add custom notification message content (if no configured message is added, default message is used).

custom notification​

ONES Requirement: v3.14.0+

ParamTypeDescriptionRequired
msgTitleNoticestringTitle of notificationN
msgFailedContentstringMessage content when import failsN
msgSuccessContentstringMessage content when import succeedsN
msgThirdTitleFailedstringWhen an import fails,the third-party notification has this titleN
msgThirdTitleDonestringwhen an import success,the third-party notification has this titleN

Example configuration:

config/plugin.yaml
abilities:
- id: 5I-CjPX_
name: third-party import
version: 1.0.0
abilityType: ThirdImport
function:
importFunc: importFunc
notifyFunc: notifyFunc
config:
- key: msgTitleNotice
value: 'This is a title'
fieldType: Input
- key: msgFailedContent
value: 'This is the content for the import failure'
fieldType: Input
- key: msgSuccessContent
value: 'This is the content of the successfully imported'
fieldType: Input
- key: msgThirdTitleFailed
value: 'When an import fails,the third-party notification has this title'
fieldType: Input
- key: msgThirdTitleDone
value: 'when an import success,the third-party notification has this title'
fieldType: Input

Step 3: Start importing​

Call the startImport method to start importing third data.

Entry:

ParameterTypeDescriptionRequiredDefault Value
userUUIDstringuser uuidY-
abilityIdstringability id in plugin ability configurationY-
passwordstringImport user's default password when logging in for the first time (the default password needs to be alphanumeric)Y-
serverIdstringIf you import the same batch of data, you need to ensure the same server_idY-
teamUUIDstringThe unique ID of the teamY-

Example:

import { startImport } from '@ones-op/node-third-import'

await startImport(user_uuid, abilityId, password, server_id, teamUUID)

Step 4: Implement the import function​

When the plugin calls startImport to start the import, the system will automatically start the import process. After the import process starts, importFunc will be called multiple times to obtain the imported data. Each time the function is called, importFunc will be passed in to indicate the data type imported by this call, and the plugin can return the corresponding data according to this field. When there is no data of this type to be imported, an empty array [] can be returned, and the next data type will be imported until all types are imported.

tip

The definitions of all imported data types can be found in @ones-op/node-third-import content.

Entry:

ParameterTypeDescription
import_typestringThe data type of this import
pre_dataanythe last data imported last time for this type

Example:

import type { ThirdUser } from '@ones-op/node-third-import'

export async function importFunc(request: PluginRequest): Promise<PluginResponse> {
const { import_type } = request?.body as any
const data: any[] = []

if (import_type === 'ThirdUser') {
const user: ThirdUser = {
resource_id: 'xxxx',
name: 'hosea',
email: 'xiaoming@ones.com',
phone: '18888888888',
title: 'xxx',
company: 'ONES',
status: 10,
create_time: 1665310367819,
modify_time: 1665310367819,
}

data.push(user)
}

return {
body: {
code: 200,
body: data,
},
}
}

Step 5: Implement the notification function​

The notifyFunc function will be automatically generated in backend/src/third-import.ts. After the import process is completed, this function will be called and the result of this data import will be returned. According to whether the import is successful, the corresponding content will be returned in body in the input parameter of the function.

  • Imported successfully

    ParamTypeDescription
    is_successboolWhether it is successful
  • import failed

    parameterTypeDescription
    process_namestringIndicates the failed link
    error_msgstringerror message

Example:

export async function notifyFunc(request: PluginRequest): Promise<PluginResponse> {
Logger.info('receive notify', JSON.stringify(request?.body))

return {
body: {
code: 200,
body: {},
},
}
}