Skip to main content

Customize the selectable range of issue member field

Suitable EnviromentSaaS
Private Deployment

Requirements​

ONES
v3.13.35+

Overview​

As a plugin developer, I want to be able to customize user rules so that searching or modifying user in work items associated with a project must fall within the scope of the plugin's custom user rules. When using this ability, the content that users can customize includes:

  1. In the global configuration item "Optional Range of Work Item Member Attributes", add custom rule options.
  2. For project-managed work items, the user search function is controlled by the "Optional Range of Work Item Member Attributes".
  • Including: search for person in charge, search for solvers, search for followers, search for custom single-choice members, search for custom multi-choice members.
  1. For project-managed work items, the user modification function is controlled by "Optional Range of Work Item Member Attributes".
  • Including: modifying the person in charge, modifying the solver, modifying followers, modifying custom single-selection members, modifying custom multi-selection members, modifying attributes in batches, and adding work items.

Performance​

When the plug-in of this capability is enabled, a custom rule option is added in the global configuration item "Optional Range of Work Item Member Attributes".

When "Custom Rule Options" is selected, the member search function in the project management work item is controlled by the optional range.

When "Customize Rule Options" is selected, the function of modifying members in work items of project management is controlled by the optional scope.

When the plug-in for this capability is deactivated, the previously added custom rule option will disappear in the global configuration item "Optional Range of Work Item Member Attributes".

Usage​

Add Ability​

Execute npx op add ability , select user-list-filter@1.0.0 to add an ability

  • config/plugin.yaml has follow information:
service:
app_id: Wr1aVwZS
...
modules:[]
abilities:
- id: saxkWEsg
name: Plugin Members
version: 1.0.0
abilityType: UserListFilter
scope: org
desc: plugin members which can filter all ones users.
function:
UserListFilterCallback: userListFilterTest
forOnesFunc: null
forPluginFunc: null
config:
- key: user_list_name
value: custom members
fieldType: Input
show: false
  • backend/src/user_list_filter.ts has follow information:
import { Logger } from '@ones-op/node-logger'
import type { PluginRequest, PluginResponse } from '@ones-op/node-types'

export const userListFilterTest = async (request: PluginRequest): Promise<PluginResponse> => {
Logger.info('[userListFilterTest] enter')
const body = request?.body as any
let users = body['users']
//Logger.info("[userListFilterTest] users:", users.length)

if (users == undefined) {
Logger.info('[userListFilterTest] has no users')
} else if (users.length == 0) {
Logger.info('[userListFilterTest] users has no item')
} else {
Logger.info('[userListFilterTest] users[0]:', users[0])
}
//Init information
let data_result = new Array()

/**[start] custom user filter rules**/

/**[end] custom user filter rules**/

return {
body: {
code: 200,
body: {
state: 0,
message: 'success',
data: data_result,
},
},
}
}

Custom Filter Rules​

In userListFilterTest function, add custom rule logic based on user information to filter out users who meet the rules.

User​

parameter namevalue typeRangesexampleillustration
uuidstringlen=8NbDQH9A9user uuid
companystringlen<=128onesCompany Name
emailstringlen<=128Tom@ones.comuser email
inviter_uuidstringlen=84i4S57VGInviter uuid
namestringlen<=64Tom01user name
phonestringlen<=3215522778899phone
statusstringlen<=81user status, 1:normal 2.deleted
team_uuidstringlen=89xHa5f8Vteam uuid
titlestringlen<=64manageruser position

Example​

Add custom rules based on user email information. For example, to filter all users whose email suffix is "@ones.com".

import { Logger } from '@ones-op/node-logger'
import type { PluginRequest, PluginResponse } from '@ones-op/node-types'

export const userListFilterTest = async (request: PluginRequest): Promise<PluginResponse> => {
Logger.info('[userListFilterTest] enter')
const body = request?.body as any
let users = body['users']
//Logger.info("[userListFilterTest] users:", users.length)

if (users == undefined) {
Logger.info('[userListFilterTest] has no users')
} else if (users.length == 0) {
Logger.info('[userListFilterTest] users has no item')
} else {
Logger.info('[userListFilterTest] users[0]:', users[0])
}
//Init information
let data_result = new Array()

/**[start] custom user filter rules**/
if (users) {
let reqSuffix = /@ones.com$/
for (let idx in users) {
if (reqSuffix.test(users[idx]['email'])) {
data_result.push(users[idx]['uuid'] as string)
}
}
}
/**[end] custom user filter rules**/

return {
body: {
code: 200,
body: {
state: 0,
message: 'success',
data: data_result,
},
},
}
}

Q&A​

How can the custom user list name be multilingual?

refer to Plug-in multilingual support

service:
app_id: Wr1aVwZS
...
abilities:
- id: saxkWEsg
name: Plugin Members
version: 1.0.0
abilityType: UserListFilter
scope: org
desc: plugin members which can filter all ones users.
function:
UserListFilterCallback: userListFilterTest
forOnesFunc: null
forPluginFunc: null
config:
- key: user_list_name
value: {{.UserListName}}
fieldType: Input
show: false

How to update custom user list option name?

refer to upgrade the plug-in

  • Modify abilities.config.value first
  • Modify the workspace /lanuage/xx.yaml multilingual translation copy
  • Upgrade the plugin