Modify script properties
| Suitable Enviroment | Private Deployment |
Require
| ONES |
|---|
| v3.16.18+ |
Overview
After we create the script attribute, we can make secondary modifications to the script attribute. Currently, the name of the script attribute can be modified.
Capability range
Products, work items, single selection, multiple selection, floating point script attributes under the project
use
Add the capability through the OP tool, modify the configuration related to the capability, and complete the business logic in the update script attribute method. The relevant steps are as follows.
Step 1: Add and use capabilities through OP tools
Use the command line to enter the OP command in the plug-in root directory to add capabilities (this command requires OP tool version 1.0 and above)
npx op add ability
Check and add update-script-field@1.0.0
The OP tool will ask whether to use the default value. Just select Yes. The OP tool will add the following content to the plug-in.
Add a new file update-script-field.ts in the plugin backend
import type {
Relation,
UpdateFieldGroupRequest,
UpdateScriptFieldRequest,
} from '@ones-op/node-ability'
import { Field, FieldTypeEnum, PoolEnum, AbilityError } from '@ones-op/node-ability'
import { Logger } from '@ones-op/node-logger'
import type { PluginRequest, PluginResponse } from '@ones-op/node-types'
export async function updateFieldName(request: PluginRequest): Promise<PluginResponse> {
const u: UpdateScriptFieldRequest = {
Pool: PoolEnum.Product,
FieldUUID: 'fieldUUID',
TeamUUID: 'teamUUID',
Name: 'newFieldName',
}
try {
const resp = await Field.UpdateScriptField(u)
} catch (e) {
if (e instanceof AbilityError) {
Logger.error('err', e)
}
}
return {
body: {
res: 'hello world',
},
}
}
Field.UpdateScriptFieldRequest parameter introduction
| Parameters | Type | Description |
|---|---|---|
| Pool | string | The context to which the script attribute belongs, including products, projects, and work items |
| FieldUUID | string | Script attribute UUID |
| TeamUUID | string | UUID of the team to which the attribute belongs,only takes effect when the plug-in is at the organization level |
| Name | string | The new name of the script property |