Scene: field and field group of location

Scene Description​

We would like to be able to set location information in the fields of an issue, including country, province, and city. These fields should have real constraints between them. For example, when a country is selected, the options for the province should be limited to the selected country. Additionally, if a smaller region is selected first, the corresponding higher-level location information should be automatically selected. Finally, the validity of the location information should be verified when submitting the information.

Solution​

Implementation Approach:​

By adding three single-select issue script fields, the location information can be represented. These fields will be associated to form a field group and added to the issue entity.

Constraints between field hierarchy can be enforced when retrieving option values. Automatic population of higher-level location information can be achieved using the field value linkage feature. Validity verification can be implemented using field value validation functionality.

tip

The database-related APIs mentioned in the example, such as importSQL, exec, select, can be referred to in the Database capability.

Plugin Development​

Step 1: Add Fields And Field Groups​

Initialize the database in the plugin's workspace/plugin.sql file.

workspace/plugin.sql
CREATE TABLE IF NOT EXISTS `{{script_field}}`(
`id` INT(11) AUTO_INCREMENT,
`fieldUUID` varchar(128) CHARACTER SET latin1 NOT NULL COMMENT 'uuid',
`name` varchar(128) CHARACTER SET latin1 NOT NULL COMMENT 'name',
PRIMARY KEY (`id`)
) ENGINE = InnoDB DEFAULT CHARSET=latin1 COLLATE=latin1_bin;

CREATE TABLE IF NOT EXISTS `{{location}}`(
`id` INT(11) AUTO_INCREMENT,
`Country` varchar(128) CHARACTER SET latin1 NOT NULL COMMENT 'Country',
`Province` varchar(128) CHARACTER SET latin1 NOT NULL COMMENT 'Province',
`City` varchar(128) CHARACTER SET latin1 NOT NULL COMMENT 'City',
PRIMARY KEY (`id`)
) ENGINE = InnoDB DEFAULT CHARSET=latin1 COLLATE=latin1_bin;

In the Install lifecycle method of the plugin, add script fields, create a field group, and add it to the issue. Persist the obtained script field fieldUUID to the database for future use.

import { Field, PoolEnum } from '@ones-op/node-ability'
import { exec, importSQL, select } from '@ones-op/node-database'
import { Logger } from '@ones-op/node-logger'
import type { PluginRequest, PluginResponse } from '@ones-op/node-types'

export async function Install() {
await importSQL('plugin.sql')
const issueScriptField = ['Country', 'Province', 'City']
const fieldUUIDs: any[] = []
for (const fieldName of issueScriptField) {
const FieldsAddProjectRes = await Field.FieldsAdd({
Name: fieldName,
Type: 1001,
})
if (FieldsAddProjectRes.Error) {
throw new Error('Failed to create property')
}
const { UUID: fieldUUID } = FieldsAddProjectRes
fieldUUIDs.push(fieldUUID)
Logger.info('fieldUUID:', fieldUUID)

try {
const sql =
'INSERT into script_field(fieldUUID, name) values("' +
fieldUUID +
'", "' +
fieldName +
'");'
await exec('insert', sql)
} catch (error) {
Logger.error('error: ', error)
}
}
const relateionsTask: any[] = []
fieldUUIDs.forEach((fieldUUID, index) => {
const relation = {
FieldUUID: fieldUUID,
FieldParentUUID: '',
Position: index,
}
relateionsTask.push(relation)
})
const AddGroupFieldRes = await Field.AddGroupField({
ObjectType: PoolEnum.Task,
Name: 'Location',
Relations: relateionsTask,
})
Logger.info('success to create fieldGroup' + JSON.stringify(AddGroupFieldRes, undefined, 2))
try {
const sql =
"INSERT into location(Country, Province, City) values ('America', 'Washington', 'Seattle'), ('America', 'Washington', 'Olympia'), ('America', 'Hawaii', 'Hilo'), ('America', 'Hawaii', 'Kahului'), ('China', 'Guangdong', 'Dongguan'), ('China', 'Guangdong', 'Shenzhen'), ('China', 'SiChuan', 'Chengdu'), ('China', 'SiChuan', 'Leshan'), ('Japan', 'Tokyo', 'Hokkaido');"
await exec('insert', sql)
} catch (error) {
Logger.error('error: ' + error)
}
return
}

Step 2: Write The Data Source Function.​

  • Add configuration
config/plugin.yaml
apis:
- type: addition
methods:
- POST
url: /scriptFieldSearch
function: GetOptions
  • Write the handling function

Return the corresponding options based on the currently edited field. If the higher-level location information is already present, only return valid option values.

interface OptionType {
uuid: string
value: string
}
const Countries: string[] = ['America', 'China', 'Japan']
const Provinces: string[] = ['Washington', 'Hawaii', 'Guangdong', 'SiChuan', 'Tokyo']
const Cities: string[] = [
'Seattle',
'Olympia',
'Hilo',
'Kahului',
'Dongguan',
'Shenzhen',
'Chengdu',
'Leshan',
'Hokkaido',
]
const data = {
America: { Washington: { Seattle: {}, Olympia: {} }, Hawaii: { Hilo: {}, Kahului: {} } },
China: { Guangdong: { Dongguan: {}, Shenzhen: {} }, SiChuan: { Chengdu: {}, Leshan: {} } },
Japan: { Tokyo: { Hokkaido: {} } },
}

const response = (options: Array<OptionType>) => {
return {
statusCode: 200,
body: {
code: 200,
body: {
options,
},
},
}
}
export async function GetOptions(request: PluginRequest): Promise<PluginResponse> {
const body = request?.body as any
let field = await getFieldMap()
if (Array.isArray(body.uuids)) {
return response(body.uuids.map((uuid: string) => ({ uuid, value: uuid })))
} else if (Array.isArray(body.relations)) {
let location: any = { Country: null, Province: null, City: null }
let options: OptionType[] = []
body.relations.forEach((relation, index) => {
location[field.get(relation.field_uuid)] = relation.field_value
})
switch (field.get(body.field_uuid)) {
case 'Country':
return response(Countries.map((uuid) => ({ uuid, value: uuid })))
case 'Province':
if (location.Country) {
return response(data[location.Country].map((uuid) => ({ uuid, value: uuid })))
} else {
return response(Provinces.map((uuid) => ({ uuid, value: uuid })))
}
case 'City':
if (location.Province) {
return response(
data[location.Country][location.Province].map((uuid) => ({ uuid, value: uuid })),
)
} else {
return response(Cities.map((uuid) => ({ uuid, value: uuid })))
}
default:
return response([])
}
}
const entities = {
Country: Countries,
Province: Provinces,
City: Cities,
}
const uuids = entities[field.get(body.field_uuid)] || []
return response(uuids.map((uuid: string) => ({ uuid, value: uuid })))
}
async function getFieldMap(): Promise<any> {
let field = new Map()
try {
const sql = 'select * from script_field;'
const result = await select(sql)
result.forEach((f) => {
field.set(f.fieldUUID, f.name)
field.set(f.name, f.fieldUUID)
})
} catch (error) {
Logger.error('error: ' + error)
}
return field
}

Step 3: Adding Field Value Auto-filled Feature​

  • Add configuration
config/plugin.yaml
apis:
- type: addition
methods:
- POST
url: /groupFieldOnChange
function: GroupFieldOnChange
  • Write the handling function

When the edited field lacks higher-level information, retrieve the corresponding information from the database and populate it back into the interface.

interface FieldValueType {
field_uuid: string
option_uuids: string[]
}
export async function GroupFieldOnChange(request: PluginRequest): Promise<PluginResponse> {
const body = request?.body as any
const location: any = { Country: null, Province: null, City: null }
const result: FieldValueType[] = []
const field = await getFieldMap()
body.field_values.forEach((field_value: any) => {
location[field.get(field_value.field_uuid)] = field_value.option_uuids
? field_value.option_uuids[0]
: null
})
let record: any
let cityRecord: any

switch (field.get(body.change_field_uuid)) {
case 'Country':
body.field_values.forEach((field_value: any) => {
let uuids: string[] = []
if (field_value.field_uuid === body.change_field_uuid) {
uuids = field_value.option_uuids
}
result.push({
field_uuid: field_value.field_uuid,
option_uuids: uuids,
})
})
break
case 'Province':
if (location.Province) {
try {
const sql = "select * from location where Province='" + location.Province + "';"
record = await select(sql)
} catch (error) {
Logger.error('error ' + error)
}
result.push({
field_uuid: field.get('Country'),
option_uuids: [record[0]['Country']],
})
result.push({
field_uuid: field.get('Province'),
option_uuids: [record[0]['Province']],
})
result.push({
field_uuid: field.get('City'),
option_uuids: [],
})
} else {
body.field_values.forEach((field_value: any) => {
result.push({
field_uuid: field_value.field_uuid,
option_uuids:
field.get('Country') === field_value.field_uuid ? field_value.option_uuids : [],
})
})
}
break
case 'City':
if (location.City) {
try {
const sql = `select * from location where City='${location.City}';`
cityRecord = await select(sql)
} catch (error) {
Logger.error('error ' + error)
}
result.push({
field_uuid: field.get('Country'),
option_uuids: [cityRecord[0]['Country']],
})
result.push({
field_uuid: field.get('Province'),
option_uuids: [cityRecord[0]['Province']],
})
result.push({
field_uuid: field.get('City'),
option_uuids: [cityRecord[0]['City']],
})
} else {
body.field_values.forEach((field_value: any) => {
result.push(field_value)
})
}
break
}
return {
statusCode: 200,
body: {
code: 200,
body: {
field_values: result,
},
},
}
}

Step 4: Adding Field Value Validation Feature​

  • Add configuration
config/plugin.yaml
apis:
- type: addition
methods:
- POST
url: /groupFieldValidate
function: GroupFieldValidate
  • Write the handling function

Validate the hierarchical relationships of all location information based on the data in the plugin's database.

interface UpdateType {
field_uuid: string // UUID of the field
option_uuid: string // UUID of the option
option_value: string // Option value
}
export async function GroupFieldValidate(request: PluginRequest): Promise<PluginResponse> {
const body = request?.body as any
Logger.info(body)
const options: UpdateType[] = []
const field = await getFieldMap()
const location: any = { Country: null, Province: null, City: null }
body.field_groups[0].field_values.forEach((field_value: any) => {
if (field_value.option_uuids == null) {
return buildValidateFailResponse(630, 'Location information is incomplete', 'error')
}
options.push({
field_uuid: field_value.field_uuid,
option_uuid: field_value.option_uuids[0],
option_value: field_value.option_uuids[0],
})
location[field.get(field_value.field_uuid)] = field_value.option_uuids[0]
})
const subSqls: string[] = []
location.City && subSqls.push(`City='${location.City}'`)
location.Province && subSqls.push(`Province='${location.Province}'`)
location.Country && subSqls.push(`Country='${location.Country}'`)
const finalResult = {
statusCode: 200,
body: {
code: 200,
body: {
options,
},
},
}
if (subSqls.length === 0) {
return finalResult
}
try {
const sql = `select * from location where ${subSqls.join(' and ')};`
const record: any[] = await select(sql)
if (record.length === 0) {
return buildValidateFailResponse(630, 'Location information error', 'error')
}
} catch (error) {
Logger.error('error' + error)
}
return finalResult
}

function buildValidateFailResponse(code: number, reason: string, type: string): PluginResponse {
return {
statusCode: 200,
body: {
code: code,
reason: reason,
module: 'Plugin.FieldGroup',
type: type,
},
}
}