Skip to main content

Plugin Policy

Overview​

The plugin policy refers to the way the plugin is sold and distributed in the ONES system, currently supporting two policy: simple and standard.

policyDescription
SimpleAfter the plugin is installed, all users in the system are authorized by default, no manual authorization by the administrator is required, users can use the features provided by the plugin
StandardAfter the plugin is installed, users need manual authorization by the administrator to use the features provided by the plugin

Specifying the policy​

Developers need to specify the policy when creating a plugin.

tip

After the plugin is installed on the ONES system, its policy is determined and cannot be changed during the subsequent plugin upgrade process.

Managing Plugin Authorization​

After the plugin is installed on the ONES system, administrators can manage plugin authorization in the "Configuration" - "Team setting" - "Manage subscriptions" - "Authorization management" page. If it is a multi-team version of the ONES system, then go to "Configuration" - "Organization setting" - "Manage subscription" - "Authorization management" to manage the plugin authorization.