Skip to main content

Internationalization

Requirements​

ONES
v3.6.0+

Overview​

Plugins provide the ability to configure internationalized content, which allows your plugin to perceive the locale of ONES and demonstrate your plugin internationalization requirements according to the locale.

Take the details page of the plugin as an example, when the language of the ONES system is Chinese, as shown in the following figure:

When the ONES system is in English, as shown in the following figure:

In summary, it can be seen that after the use of multilingualism. The content of the plugin can be switched with the language switch of ONES.

Usage​

Use of multiple languages in plugin configuration​

Step 1: Multilingual declaration​

You need to create a new en.yaml and zh.yaml files in the workspace folder under the root directory of the plugin project, and configure the language as follows:

Chinese configuration

/workspace/language/zh.yaml
PluginName: 多语言
PluginDescription: 这是一个支持中英文两种语言的插件

English configuration

/workspace/language/en.yaml
PluginName: Multil-Language-Plugin
PluginDescription: The plugin is used to test Mult-Language abilities

Step 2: Using key values to occupy placeholder​

Then we use {{.key}} to occupy places in the configuration file where we need to use multiple languages. For example, implement multiple languages in: plugin.yaml file.

config/plugin.yaml
service:
name: '{{.PluginName}}'
description: '{{.PluginDescription}}'

This completes the multilingual configuration in the plugin configuration file.

Use multiple languages in the plugin backend​

Step 1: Multilingual declaration​

Add zh.yaml and en.yaml files under /workspace/language.

/workspace/language/zh.yaml
PluginName: 多能力插件Demo
PluginDescription: Node.js 插件的 demo, 提供了所有能力和工具标准使用方式
/workspace/language/en.yaml
PluginName: Multilability plugin Demo
PluginDescription: The demo of Node.js, providing all the ability and standard usage of tools

Step 2: Installation dependency​

Go to the /backend directory of the plugin project, and execute the following command for dependent installation:

npm install @ones-op/node-ability

Step 3: Usage​

import { Language } from '@ones-op/node-ability'

export async function multiple_language(request: PluginRequest): Promise<PluginResponse> {
const { body, headers } = request
const userUUID = headers['Ones-User-Id']
const teamUUID = 'xxx'
// get user language
const language = await Language.getLanguage(userUUID, teamUUID)
// gets the value of the multilingual key corresponding to the language
const description = await Language.getLanguageString(language, 'PluginDescription')

return {
body: {
res: {
description,
},
requestBody: body,
},
}
}
tip

This ability obtains the language information set by the user last time. If it is directly responding to the front-end request, it is recommended to directly use the user language information in the front-end request.

Use multiple languages in the plugin frontend​

In the plugin, you can use window to access the global variables that we injected in the plugin execution environment.

Step 1: Learn about currently supported language identifiers​

Identificationlanguage
zh-CN简体中文
en英语

Step 2: Multilingual declaration​

language.tsx
const zhHans = {
toast: '吐司',
modal: '对话框',
text: '你好',
pwdErr: '请再次输入密码!',
userNameErr: '用户名错误!',
ok: '确定',
cancel: '取消',
}

const en: typeof zhHans = {
toast: 'toast',
modal: 'Dialog',
text: 'hello',
pwdErr: 'please input password again',
userNameErr: 'usename error!',
ok: 'ok',
cancel: 'cancel',
}

const resourceMap: { [_: string]: typeof zhHans } = {
'zh-CN': zhHans,
'en': en,
}

Step 3: Usage​

index.tsx
const locale = (window as any).__ones_op_locale__?.locale || 'en'

const langResource = resourceMap[locale]

FAQ​

When the same account selects different languages in different browsers, there is a mismatch when using the ability to obtain user language information​

The same user is allowed to select different languages in different browsers, but only the language information that the user selected last time can be obtained when acquiring the user language through the ability. Therefore, for the interface directly requested by the front end, the language information carried in the request is directly used.