Skip to main content

Runtime Environment

This section will introduce the runtime environment of the plugin in the ONES system. You can read this section to know the actual runtime environment of the plugin so that you can know the boundaries of how the plugin is written.

Backend​

ONES Open Platform Node.js HOST provides a sandbox environment for plugin backends based on VM2, where plugin lifecycle methods and any ability methods are called up and executed by the HOST after receiving messages from the Open Platform.

caution

We strongly discourage you from using in-memory operations (global variables, etc.). The Open Platform provides a backend plugin system based on method-level calls (class FaaS mode), and the Open Platform internal scheduling may perform restarts and other operations on the plugin, so memory operations are very unreliable.

Node.js Host provides a relatively loose sandbox environment, and does not restrict the use of Node.js native modules much, but supports plugins in full with builtin: ['*'].

caution

The native modules that the plugin can get are still a subset of those provided by Node.js, because VM2 will automatically get rid of unsafe modules or methods, such as the process.exit method.

We configured the TypeScript template with ESM writing in the plugin template, but this does not mean that the final runtime environment of the plugin supports ESM.

The plugin backend builder will Tree Shaking and package your code and the code from the ESM library referenced by import into the /backend/dist directory to eliminate any ESM syntax from your code. Thus.

caution

For pure ESM exported libraries, require references are not supported.

caution

For libraries exported by default ESM (package.json main field entry file is in ESM format), require references are also not supported for now.