Skip to main content

Debugging

Overview​

This section describes how to breakpoint debugging of backend code when running the plugin locally. Since the backend code of a plugin is not a separate project, but a piece of code running in a sandbox, breakpoint debugging is done a little differently than in a regular Node.js project.

note

For more information on how the plugin works, please consult: Runtime Environment.

Requirements​

@ones/node-host@ones/cli-plugin
v0.1.15+v1.9.1+

Usage​

We provide the Npm Script configuration in the plugin template, which includes the debug command that you can run with the debugging tool for breakpoint debugging.

note

We add the inspect parameter to the Node.js HOST application when it runs, and the host and port use the default provided by Node.js: 127.0.0.1:9229. Common debugging tools usually include this default address, and in most cases you don't need to do any additional configuration.

caution

The Node.js Host has a time limit for connecting to the open platform, which is usually exceeded when you do a breakpoint debug.
So when you breakpoint, you may need to re-run the run command to get the plugin up and running.

Step 1: Add debugger code​

Unlike the regular Node.js breakpoint debugging approach, plugin backend breakpoint debugging requires you to write a minimum of one line of debugger code in order for the debugging tool to locate and open your backend code memory file. You can only add breakpoints to this read-only memory file for debugging.

In general, we recommend that you add debugger to the first line of the function body you need to debug to make it easier to add breakpoints before the function is executed.

Step 2: Select the tool to connect to the debugging service​

Visual Studio Code​

Visual Studio Code provides the Debug npm Script feature, which can run your Npm Script in debug mode and take over the debugging features of the program.

Start​

Way 1: Open the package.json file in the root directory and debug the debug command.

Way 2: Create a new Javascript debugging terminal and run the debug command.

Debug preview​

Request your method, and seeing this interface means that the debugging has been successfully enabled. The system will first stop at the position where you wrote the debugger, and then you can add breakpoints or the next step like formal debugging.

Chromium​

After manually running the npx op invoke run command to get the local plugin up and running, you can, in Chromium-based browsers (e.g. Edge, Chrome, etc.) Open about://inspect to see the devices that can be connected.

After selecting inspect, the browser will open a DevTools with your current plugin backend debugging service connected to it. at this point, you just need to make an interface call to get the program into the function where you added the debugger code, and DevTools will enter the breakpoint and open your plugin backend code memory file where you can add additional breakpoints for debugging.