Skip to main content

Upgrade

Overview​

The plugin supports uninstall-free upgrades, and upgrading the plugin in this way preserves the data of the old plugin.

Upgrade​

Step 1: Modify the plugin.yaml file​

To upgrade a plugin, you need to modify the configuration file config/plugin.yaml of the plugin. The modified plugin.yaml file must meet the following two points:

  • The value of the app_id field in the new plugin and the old plugin must remain the same
  • The version field of the new version of the plugin must be higher than the old version of the plugin

Example configuration:

# Old version
service:
app_id: O2MgOGxE
version: 1.0.0
...
# New version
service:
app_id: O2MgOGxE
version: 1.0.1
...

Step 2: write the upgrade.yaml file​

When the plugin upgrades, it replaces the files in the workspace directory according to the rules in /config/upgrade.yaml. If /config/upgrade.yaml does not exist, it will cause the plugin upgrade to fail.

upgrade.yaml must be written in accordance with yaml syntax, and the content rules are as follows:

  • rule

    File replacement rules. Available values are as follows:

    RulesDescription
    save_newWhen a new file conflicts with an old one, keep the new file.
    save_oldWhen a new file conflicts with an old one, keep the old file.
  • exclude

    Exclusion list, supports regular expression matching files, the hit files do not apply rule rules.

Sample configuration: This configuration means that when the files in the workspace directory of the old and new plugin conflict, the files in the new plugin will be kept. The files matched by exclude, except a.txt and files in the temp directory

config/upgrade.yaml
workspace:
rule: save_new
exclude:
- a.txt
- temp/*

Constraints​

service.config​

  • The declaration of service.config is not allowed to be modified when the plugin is upgraded, even if it is modified, it will not take effect.
  • Adding and deleting service.config is allowed when the plugin is upgraded.

abilities.config​

  • The mapping of abilities.id to abilities.version:abilities.type is not allowed to be changed when the plugin is upgraded.
  • When the plugin is upgraded, abilities.config only supports modifying the show and value fields.