Customize the selectable range of issue member field
| Suitable Enviroment | SaaS |
| Private Deployment |
Requirements
| ONES |
|---|
| v3.13.35+ |
Overview
As a plugin developer, I want to be able to customize user rules so that searching or modifying user in work items associated with a project must fall within the scope of the plugin's custom user rules. When using this ability, the content that users can customize includes:
- In the global configuration item "Optional Range of Work Item Member Attributes", add custom rule options.
- For project-managed work items, the user search function is controlled by the "Optional Range of Work Item Member Attributes".
- Including: search for person in charge, search for solvers, search for followers, search for custom single-choice members, search for custom multi-choice members.
- For project-managed work items, the user modification function is controlled by "Optional Range of Work Item Member Attributes".
- Including: modifying the person in charge, modifying the solver, modifying followers, modifying custom single-selection members, modifying custom multi-selection members, modifying attributes in batches, and adding work items.
Performance
When the plug-in of this capability is enabled, a custom rule option is added in the global configuration item "Optional Range of Work Item Member Attributes".
When "Custom Rule Options" is selected, the member search function in the project management work item is controlled by the optional range.
When "Customize Rule Options" is selected, the function of modifying members in work items of project management is controlled by the optional scope.
When the plug-in for this capability is deactivated, the previously added custom rule option will disappear in the global configuration item "Optional Range of Work Item Member Attributes".
Usage
Add Ability
Execute npx op add ability , select user-list-filter@1.0.0 to add an ability
config/plugin.yamlhas follow information:
service:
app_id: Wr1aVwZS
...
modules:[]
abilities:
- id: saxkWEsg
name: Plugin Members
version: 1.0.0
abilityType: UserListFilter
scope: org
desc: plugin members which can filter all ones users.
function:
UserListFilterCallback: userListFilterTest
forOnesFunc: null
forPluginFunc: null
config:
- key: user_list_name
value: custom members
fieldType: Input
show: false
backend/src/user_list_filter.tshas follow information:
import { Logger } from '@ones-op/node-logger'
import type { PluginRequest, PluginResponse } from '@ones-op/node-types'
export const userListFilterTest = async (request: PluginRequest): Promise<PluginResponse> => {
Logger.info('[userListFilterTest] enter')
const body = request?.body as any
let users = body['users']
//Logger.info("[userListFilterTest] users:", users.length)
if (users == undefined) {
Logger.info('[userListFilterTest] has no users')
} else if (users.length == 0) {
Logger.info('[userListFilterTest] users has no item')
} else {
Logger.info('[userListFilterTest] users[0]:', users[0])
}
//Init information
let data_result = new Array()
/**[start] custom user filter rules**/
/**[end] custom user filter rules**/
return {
body: {
code: 200,
body: {
state: 0,
message: 'success',
data: data_result,
},
},
}
}
Custom Filter Rules
In userListFilterTest function, add custom rule logic based on user information to filter out users who meet the rules.
User
| parameter name | value type | Ranges | example | illustration |
|---|---|---|---|---|
| uuid | string | len=8 | NbDQH9A9 | user uuid |
| company | string | len<=128 | ones | Company Name |
| string | len<=128 | Tom@ones.com | user email | |
| inviter_uuid | string | len=8 | 4i4S57VG | Inviter uuid |
| name | string | len<=64 | Tom01 | user name |
| phone | string | len<=32 | 15522778899 | phone |
| status | string | len<=8 | 1 | user status, 1:normal 2.deleted |
| team_uuid | string | len=8 | 9xHa5f8V | team uuid |
| title | string | len<=64 | manager | user position |
Example
Add custom rules based on user email information. For example, to filter all users whose email suffix is "@ones.com".
import { Logger } from '@ones-op/node-logger'
import type { PluginRequest, PluginResponse } from '@ones-op/node-types'
export const userListFilterTest = async (request: PluginRequest): Promise<PluginResponse> => {
Logger.info('[userListFilterTest] enter')
const body = request?.body as any
let users = body['users']
//Logger.info("[userListFilterTest] users:", users.length)
if (users == undefined) {
Logger.info('[userListFilterTest] has no users')
} else if (users.length == 0) {
Logger.info('[userListFilterTest] users has no item')
} else {
Logger.info('[userListFilterTest] users[0]:', users[0])
}
//Init information
let data_result = new Array()
/**[start] custom user filter rules**/
if (users) {
let reqSuffix = /@ones.com$/
for (let idx in users) {
if (reqSuffix.test(users[idx]['email'])) {
data_result.push(users[idx]['uuid'] as string)
}
}
}
/**[end] custom user filter rules**/
return {
body: {
code: 200,
body: {
state: 0,
message: 'success',
data: data_result,
},
},
}
}
Q&A
How can the custom user list name be multilingual?
refer to Plug-in multilingual support
service:
app_id: Wr1aVwZS
...
abilities:
- id: saxkWEsg
name: Plugin Members
version: 1.0.0
abilityType: UserListFilter
scope: org
desc: plugin members which can filter all ones users.
function:
UserListFilterCallback: userListFilterTest
forOnesFunc: null
forPluginFunc: null
config:
- key: user_list_name
value: {{.UserListName}}
fieldType: Input
show: false
How to update custom user list option name?
refer to upgrade the plug-in
- Modify
abilities.config.valuefirst - Modify the workspace
/lanuage/xx.yamlmultilingual translation copy - Upgrade the plugin