Skip to main content

Test plan settings

Suitable EnviromentSaaS
Private Deployment

Requirements​

ONES
v3.6.0+

Overview​

We have provided slots for "ONES TestCase" - "Test plans" - "Test plan settings" to customize the page module for the application.

The slots currently supported are as follows:

Slots​

ones:testcase:plan:settings:new​

Module path: ONES TestCase / Test plans / Test plan settings / new module

Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.

ones:testcase:plan:settings:info​

Module path: ONES TestCase / Test plans / Test plan settings / Test plan info

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:testcase:plan:settings:perform​

Module path: ONES TestCase / Test plans / Test plan settings / Execution configuration

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:testcase:plan:settings:permission​

Module path: ONES TestCase / Test plans / Test plan settings / Permission

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:testcase:plan:settings:more​

Module path: ONES TestCase / Test plans / Test plan settings / More

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

Usage​

modules:
- id: ones-testcase-plan-settings-info-c6mm
title: Info
moduleType: ones:testcase:plan:settings:info
entry: modules/ones-testcase-plan-settings-info-c6mm/index.html

Supported config options:

Available Hook API​

import { useTestPlanInfo } from '@ones-op/store'

const testPlanInfo = useTestPlanInfo()