Test plan settings
| Suitable Enviroment | SaaS |
| Private Deployment |
Requirements
| ONES |
|---|
| v3.6.0+ |
Overview
We have provided slots for "ONES TestCase" - "Test plans" - "Test plan settings" to customize the page module for the application.
The slots currently supported are as follows:
- ones:testcase:plan:settings:new
- ones:testcase:plan:settings:info
- ones:testcase:plan:settings:perform
- ones:testcase:plan:settings:permission
- ones:testcase:plan:settings:more
Slots
ones:testcase:plan:settings:new
Module path: ONES TestCase / Test plans / Test plan settings / new module
Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.
ones:testcase:plan:settings:info
Module path: ONES TestCase / Test plans / Test plan settings / Test plan info
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:testcase:plan:settings:perform
Module path: ONES TestCase / Test plans / Test plan settings / Execution configuration
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:testcase:plan:settings:permission
Module path: ONES TestCase / Test plans / Test plan settings / Permission
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:testcase:plan:settings:more
Module path: ONES TestCase / Test plans / Test plan settings / More
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
Usage
modules:
- id: ones-testcase-plan-settings-info-c6mm
title: Info
moduleType: ones:testcase:plan:settings:info
entry: modules/ones-testcase-plan-settings-info-c6mm/index.html
Supported config options:
Available Hook API
import { useTestPlanInfo } from '@ones-op/store'
const testPlanInfo = useTestPlanInfo()