Skip to main content

Product settings

Suitable EnviromentSaaS
Private Deployment

Requirements​

ONES
v3.6.0+

Overview​

We have provided slots for "Product Management" - "Product component" - "Product settings" to customize the page module for the application.

The slots currently supported are as follows:

Slots​

ones:product:settings:new​

Module path: Product Management / Product component / Product settings / new module

Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.

ones:product:settings:config​

Module path: Product Management / Product component / Product settings / Product configuration

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:product:settings:info​

Module path: Product Management / Product component / Product settings / Basic info

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:product:settings:component​

Module path: Product Management / Product component / Product settings / Component settings

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:product:settings:more​

Module path: Product Management / Product component / Product settings / More

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

Usage​

modules:
- id: ones-product-settings-info-m7iL
title: Basic info
moduleType: ones:product:settings:info
entry: modules/ones-product-settings-info-m7iL/index.html

Supported config options:

Available Hook API​

import { useProductInfo } from '@ones-op/store'

const productInfo = useProductInfo()