Product settings
| Suitable Enviroment | SaaS |
| Private Deployment |
Requirements
| ONES |
|---|
| v3.6.0+ |
Overview
We have provided slots for "Product Management" - "Product component" - "Product settings" to customize the page module for the application.
The slots currently supported are as follows:
- ones:product:settings:new
- ones:product:settings:config
- ones:product:settings:info
- ones:product:settings:component
- ones:product:settings:more
Slots
ones:product:settings:new
Module path: Product Management / Product component / Product settings / new module
Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.
ones:product:settings:config
Module path: Product Management / Product component / Product settings / Product configuration
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:product:settings:info
Module path: Product Management / Product component / Product settings / Basic info
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:product:settings:component
Module path: Product Management / Product component / Product settings / Component settings
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:product:settings:more
Module path: Product Management / Product component / Product settings / More
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
Usage
modules:
- id: ones-product-settings-info-m7iL
title: Basic info
moduleType: ones:product:settings:info
entry: modules/ones-product-settings-info-m7iL/index.html
Supported config options:
Available Hook API
import { useProductInfo } from '@ones-op/store'
const productInfo = useProductInfo()