Skip to main content

System preference settings

Suitable EnviromentSaaS
Private Deployment

Requirements​

ONES
v3.6.0+

Overview​

We have provided slots for "Organization settings" - "System preference settings" to customize the page module for the application.

The slots currently supported are as follows:

Slots​

ones:settings:organization:appearance:new​

Module path: Organization settings / System preference settings / new module

Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.

ones:settings:organization:appearance:sidebar​

Module path: Organization settings / System preference settings / Sidebar color

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:settings:organization:appearance:favicon​

Module path: Organization settings / System preference settings / Browser favicon

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:settings:organization:appearance:email​

Module path: Organization settings / System preference settings / Email settings

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:settings:organization:appearance:message​

Module path: Organization settings / System preference settings / Mobile number and SMS settings

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

Usage​

modules:
- id: ones-settings-organization-appearance-sidebar-L67m
title: Sidebar color
moduleType: ones:settings:organization:appearance:sidebar
entry: modules/ones-settings-organization-appearance-sidebar-L67m/index.html

Supported config options: