Intercept issue field modifications
| Suitable Enviroment | SaaS |
| Private Deployment |
Requirements
| ONES |
|---|
| v3.7.54+ |
Overview
When you want to do some processing and validation when issue field change, you can use the TaskEventHandle ability to achieve the requirement. This ability can pre-process, verify and post-proces the event when the system generates a issue update event. When the plugin that uses this ability is installed, the issue update event will be pre-process by the plugin before processing, and the plugin can ignore, reject, and modify this event according to requirements; after the event processing is completed, The plugin will receive a notification, and some post-process can be done at this time.
Applicable scene
- A certain field or state of a issue has restrictions when changing, for example, it is not allowed to change the title of a issue of a requirement type.
- Post operations are performed after issue field changes are complete. For example, after updating the person in charge of the issue of the requirement type, send an email to the corresponding person.
Scope of application
-
Covered
Including changes in issue field, script-field, and status;
Including the UI operation and the events generated by directly calling the interface;
-
Not covered
Operations that do not directly change attributes/states, such as commenting and uploading files, are not included;
Changes in calculated field such as number of stops, intervals, etc. are not included;
Changes triggered by post-actions are not included;
Does not include the processing of man-hour (man-hour are a separate
itemtype, and the corresponding similar abilitiy will be added in the follow-up ability);Does not include state changes triggered by functions that modify state abnormally;
Trigger
- Issue details page for field or status modification
- Modify field field in batches
- Batch change issue type
Performance
Using the issue processor ability configuration does not allow modification of the person in charge of the requirement, and an error is reported when modifying the person in charge of the requirement
Usage
When ONES enables the plugin that uses the TaskEventHandle ability, the execution flow of issue field and state change events is shown in the following figure:
Step 1: Add configuration
Use npx op add ability to add task-event-handler ability. After adding, the backend/src/task-event-handler.ts file will be added, and the following configurations will be added to the configuration file.
Developers only need to pay attention to two configurations of issue type and issue field. Multiple configurations of issue type and issue field are supported. Between multiple configurations Delimited by "," .
Example configuration: Indicates issue type that focus on requirement and defect , issue field that focus on Due date and assign change event.
abilities:
- id: _ZcH89U9
name: TaskEventHandler
version: 1.0.0
abilityType: TaskEventHandler
function:
taskPreActionFunc: taskPreAction
taskActionDoneFunc: taskActionDone
config:
- key: issueTypeScope
value: 'Requirement,Bug'
fieldType: Input
label: IssueType
show: true
- key: field
value: 'Assignee,Due date,'
fieldType: Input
label: IssueField
show: true
Step 2: Add pre-processing
The backend/src/task-event-handler.ts file will automatically generate the taskPreAction function, which is a pre-processing function. This function will be called before the event takes effect, and different strategies will be adopted according to the returned content。
-
Return
The structure of the content returned by the
taskPreActionfunction is as follows, and different strategies are adopted according to the values of theis_follow,is_rejectandtask_eventsfields:- Ignore: Set the returned
is_follow = false, indicating that the plugin does not do additional processing, and the update event is executed according to the normal process. - Reject: Set the returned
is_follow = true && is_reject = true, which means that the update event will not be executed and will end directly. - Accept: Set the returned
is_follow = true && is_reject = false, which means accepting the event, but not modifying the update content, and only notifying the plugin after the event is completed. - Modification: Set the returned
is_follow = true && is_reject = falseand add field modification by returning thetask_eventsobject to indicate acceptance of this event, modify the update content this time and notify the plugin after the event is completed.
- Ignore: Set the returned
Even if there is no need to add new modifications in the plugin logic, the data in the original task_events field needs to be returned, otherwise the change event may fail
type taskPreResponse = {
statusCode: number
body: {
code: number
body: {
is_follow: boolean
is_reject: boolean
reject_reason: string
task_events: any
other_data: string
}
}
}
| Param | Type | Required | Description |
|---|---|---|---|
| is_follow | string | Y | Express concern |
| is_reject | string | Y | Whether to refuse |
| reject_reason | string | N | Reject reason |
| task_events | []TaskEvent | Y | Changed data (plugins can add changed field values) |
| other_data | interface | N | Other data (this data will be passed to the taskActionDone method) |
-
Params
Include the following content in the request body of the function input parameter:
Param Type Required Description user_uuid string Y User's uuidlang string Y Current user language task_events []TaskEvent Y Changed data TaskEvent
Param Type Required Description task_fields []TaskEventField Y Change field list task_uuid string Y The uuidof the issueaction string Y update: general fieldtransit: status change (with step field)change_issue_type: issue type changepublish_version: version releaseadd: create a new issueissue_type_scope_uuid string Y Issue type UUIDunder the project to which it belongsissue_type_scope_name string Y The name of the issue type under the project issue_type_scope_name_map map[string]string Y The name of issue_type_scopein each language versionTaskEventField
Param Type Required Description field_uuid string N The uuidof the fieldfield_type string N Field type field_name string N The keyfor the field namefield_name_map map[string]string N The name of each language version of the field, such as:
en: 'Assignee/Owner'
origin: '{{field.assign}}'
zh: '负责人'field_value_type string N Field value type:
0 - any
1 - int
2 - string
3 - []stringvalue interface N Field value -
Example
After modifying the field or state of a issue, the title of the issue will be modified synchronously.
backend/src/task-event-handler.tsexport async function taskPreAction(request: PluginRequest): Promise<PluginResponse> {
const body = request?.body as any
const userUUID = body.user_uuid
const lang = body.lang
const events = body.task_events
const action = events[0].action
Logger.info('nEvents', events)
Logger.info('userID:', userUUID)
Logger.info('lang', lang)
Logger.info('action', action)
// Add field modification
const aField = {
field_name: 'Title',
value: 'test title',
}
events[0].task_fields.push(aField)
return {
statusCode: 200,
body: {
code: 200,
body: {
is_follow: true,
is_reject: false,
reject_reason: '',
task_events: events,
other_data: 'other data',
},
},
}
} -
Special note:If you want the page to pop a custom
warning toast,you can set it in the following ways
export async function taskPreAction(request: PluginRequest): Promise<PluginResponse> {
return {
body: {
code: 400,
reason: 'Test warning error',
type: 'warning',
model: 'plugin.xxx',
},
}
}
Step 3: Add post-processing
The taskActionDone function is automatically generated in the backend/src/task-event-handler.ts file. This function is post-processing and will be called first after the event takes effect.
-
Params
Param Type Required Description user_uuid string Y User uuidlang string Y Current user language task_events []TaskEvent Y Changed data other_data interface N Other data (this data will come from the taskPreActionmethod) -
Example
backend/src/task-event-handler.tsexport async function taskActionDone(request: PluginRequest): Promise<PluginResponse> {
var body = request?.body as any
var events = body.task_events
var otherData = body.other_data
var userUUID = body.user_uuid
var lang = body.lang
var action = events[0].action
Logger.info('ans event', events)
Logger.info('ans other_data', otherData)
Logger.info('ans userID:', userUUID)
Logger.info('ans lang', lang)
Logger.info('ans action', action)
return {
statusCode: 200,
body: {
code: 200,
},
}
}
NOTICE
- When
TaskEvent.actionistransit,publish_version, the plugin is not allowed to modify the state. - The processing logic of
taskPreActionis earlier than the required verification of the step field. If the plugin changes the value of the required item of the step field to an empty value, an error will be reported. - When
TaskEvent.actionischange_issue_type, the plugin is not allowed to modify the issue type and parent issue. TaskEventdoes not support the deletion of a field change.