Item mutation
| Suitable Enviroment | SaaS |
| Private Deployment |
Requirements
| ONES |
|---|
| v3.6.0+ |
Overview
Many data in the ONES support GraphQL operations. We can regard each GraphQL Mutation as an event, and use the Mutation event interception ability to intercept these events and perform some additional Check or operate to expand new business logic. The ability will provide interception support for certain event types in advance, and the plugin can intercept the corresponding GraphQL Mutation event by specifying the event type.
The event types that currently support interception are: checkManhour (man-hour verification)
Usage
checkManhour
Using the ability to intercept the checkManhour event type, you can perform some verification logic on the man-hour operation. If the verification fails, the modification operation will report an error. Only after passing the verification can the operation be completed normally.
The following are the steps to add pre-verification for Add man-hour and Update man-hour. During the development process, developers can write business code according to actual needs, such as verifying that the added and updated man-hour must be integers, modifying the value range, and other scenarios.
Step 1: Add ability
Use npx op add ability to add item-mutation ability.
Example configuration:
abilities:
- id: Ksmnf_Mc
name: Item mutation
version: 1.0.0
abilityType: item-mutation
function:
checkManhour: CheckManhourOp # checkManhour is the event type, CheckManhourOp is the processing function
config:
- key: prefix # interception position, prefix means pre-operation
value: check # Indicates that the check operation is to be performed
fieldType: Input
- key: operating # operating indicates interception events
value: addManhour,updateManhour # Indicates that the two events addManhour and updateManhour are to be intercepted
fieldType: Input
Step 2: Write the handler function
Write the processing function CheckManhourOp in the backend/src/item-mutation.ts of the plugin project, which will be called when the event intercepted in the configuration occurs. The event type of checkManhour will judge whether the inspection of this event is successful or not according to whether the returned status code is 200.
The CheckManhourOp function template looks like this:
interface CheckManhourOpRequest {
Selections: {
args: {
start_time: number
type: string
}
}[]
}
// The man-hour verification logic can obtain the relevant information of this request from Selections
export async function CheckManhourOp(request: any) {
const body = request.body || {}
const { Selections } = body as CheckManhourOpRequest
Logger.info(JSON.stringify(Selections))
return {
body: {
code: 200,
ResponseModel: 'Plugin.RegistrableDays',
Reason: 'Success',
Type: null,
Body: null,
},
}
}