Skip to main content

Custom permission

Suitable EnviromentSaaS
Private Deployment

Requirements​

ONES
v3.10.14+

Overview​

Sometimes the content customized by the plugin also needs to control access permissions, and only relying on the existing permission verification of ONES cannot satisfy the permission control of the customized content of the plugin. Therefore, we provide the custom permission ability, which can be used to restrict access to the custom content of the plugin. For example: when the front end of the plugin needs to implement "level" pages, and different users (groups) have different access scopes, this ability can be used for permission control.

note

The permission added with this ability only take effect within the plugin, that is, it can only control the access rights of the content added by the plugin.

Performance​

After using the ability to add permissions, there are related permission configurations on the permission configuration page of the plugin details.

Usage​

The custom permission ability supports the use of custom permission points in three ways: customized standard permission configuration, custom permission API and custom permission point ability. Currently, custom permission points can only be used with front-end slots. For specific usage methods, please refer to: permission

caution

Only the permission points added through the ability can be customized by the plugin to verify the logic of the permission, and the others use the original permission verification logic of ONES.

Custom standard permission configuration​

Add a custom array of standard permission point configuration items in the plugin's configuration file

Param:

ParamDescriptionTypeRequiredDefault
namepermission namestringY-
fieldpermission unique identifierstringY-
descpermission descriptionstringN-

Example:

config/plugin.yaml
service:
permission:
- name: My custom read permission
field: my-custom-read-permission-key
desc: This is an example of custom read permission

Custom Permission API - BackEnd​

Provides non-declarative permission point definition and configuration methods, these APIs can be used in the plugin backend to manage custom permissions.

note

In the examples, the addition interface is added through the ONES API registration ability for debugging

Add permission point​

Param:

ParamDescriptionTypeRequired
pathRouting, fixed value: AddPermissionInfostringY
headersRequest header, fixed value: { "AbilityName": ["AddPermissionInfo"] }anyY
methodRequest method, fixed value:POSTstringY
bodyThe request body contains permission point information.anyY

body

ParamDescriptionTypeRequired
permission_namepermission point namestringY
permission_fieldpermission unique identifierstringY
permission_descpermission point descriptionstringY

Return: Contents in response.body['data']

  • Normal

    ParamDescriptionTypeNote
    instance_uuidplugin instance idstring
    permission_namepermission point namestring
    permission_descpermission point descriptionstring
    permission_fieldpermission unique identifierstring
    permission_idpermission point idstring
    check_modecheck typestring
    ability_idability idstring
  • Error

    Return when the added permission point already exists: permission_field of plugin already exists

Example:

export async function addPermission(request: PluginRequest): Promise<PluginResponse> {
const response = await fetchONES({
path: `AddPermissionInfo`,
headers: {
AbilityName: ['AddPermissionInfo'],
},
method: 'POST',
body: {
permission_name: 'api_add_permission', // permission point name
permission_field: 'api_add_permission123', // permission unique identifier
permission_desc: 'test',
},
})
const body = response?.body as any
const data = JSON.parse(body.toString())['data']
Logger.info(data)
return {
body: {
data: data,
},
}
}

Get permission point​

Param:

ParamDescriptionTypeRequired
pathRouting, fixed value: PermissionInfoListstringY
headersRequest header, fixed value: { "AbilityName":["PermissionInfoList"] }anyY
methodRequest method, fixed value:POSTstringY
teamUUIDteam idstringY

Return: Contents in response.body['data'], contains an array of permission point information, and each permission point contains the following content

permission​
ParamDescriptionType
instance_uuidplugin instance idstring
permission_namepermission point namestring
permission_descpermission point descriptionstring
permission_fieldpermission unique identifierstring
permission_idpermission point idstring
check_modecheck typestring
rule_infoinformation about configured rulesrule[]
rule​
ParamDescriptionType
idpermission rule idstring
permission_idpermission point idstring
context_typecontext typestring
context_param_1context param 1string
context_param_2context param 2string
user_domain_typeuser domain typestring
user_domain_paramuser domain paramstring
positionlocationstring

Example:

export async function listPermission(request: PluginRequest): Promise<PluginResponse> {
const { team_uuid } = request.body as any
const response = await fetchONES({
path: `PermissionInfoList`,
headers: {
AbilityName: ['PermissionInfoList'],
},
method: 'POST',
body: {},
teamUUID: team_uuid,
})
const body = response?.body as any
const data = JSON.parse(body.toString())['data']
Logger.info(data)
return {
body: {
data: data,
},
}
}

Delete permission point​

Param:

ParamDescriptionTypeRequired
pathRouting, fixed value: DeletePermissionInfostringY
headersRequest header, fixed value: { "AbilityName": ["DeletePermissionInfo"] }anyY
methodRequest method, fixed value:POSTstringY
bodyRequest body, including permission unique identifieranyY

body

ParamDescriptionTypeRequired
permission_fieldpermission unique identifierstringY

Example:

export async function deletePermission(request: PluginRequest): Promise<PluginResponse> {
const response = await fetchONES({
path: `DeletePermissionInfo`,
headers: {
AbilityName: ['DeletePermissionInfo'],
},
method: 'POST',
body: {
permission_field: 'api_add_permission123',
},
})
const body = response?.body as any
const data = JSON.parse(body.toString())['data']
Logger.info(data)
return {
body: {
data: data,
},
}
}

Add permission rule​

Param:

ParamDescriptionTypeRequired
pathRouting, fixed value: AddPermissionRulestringY
headersRequest header, fixed value: { "AbilityName": ["AddPermissionRule"] }anyY
methodRequest method, fixed value:POSTstringY
bodyRequest body, including permission point rule informationanyY
teamUUIDteam idstringY

body

ParamDescriptionTypeRequired
permission_idpermission point idstringY
user_domain_typeUser domain type, optional values:
Everyone-everyone
User-single_user
Department-department
User group-group
Team Owner - team_owner
stringY
user_domain_paramThe unique identifier of the user domain, for example, when the user domain is single_user, the value of this parameter indicates user_uuidstringY

Return: Contents in response.body['data']

  • Normal

Contains information about adding permission rules this time

ParamDescriptionType
org_uuidorganization uuidstring
team_uuidteam uuidstring
idpermission rule idstring
deleteddelete or notBool
permission_idpermission point idstring
context_typecontext typestring
context_param_1context param 1string
context_param_2context param 2string
user_domain_typeuser domain typestring
user_domain_paramuser domain paramstring
positionlocationstring
  • Error

When the user domain type of the added permission point rule is wrong, return: <UserDomainNotExist> UserDomainNotExist

Example:

export async function addRule(request: PluginRequest): Promise<PluginResponse> {
const { user_uuid, permission_id, team_uuid } = request.body as any
const response = await fetchONES({
path: `AddPermissionRule`,
headers: {
AbilityName: ['AddPermissionRule'],
},
method: 'POST',
body: {
permission_id: permission_id, // The unique id of permission, returned when add_permission_info
user_domain_type: 'single_user', // User domain type, existing: everyone, single_user, department, group, team_owner
user_domain_param: user_uuid, // The unique identifier of the user domain, for example, when user_domain_type is single_user, user_domain_param is the identifier of user_uuid
teamUUID: team_uuid,
},
teamUUID: team_uuid,
})
const body = response?.body as any
const data = JSON.parse(body.toString())['data']
Logger.info(data)
return {
body: {
data: data,
},
}
}

Delete permission rule​

Param:

ParamDescriptionTypeRequired
pathRouting, fixed value: DeletePermissionRulestringY
headersRequest header, fixed value: { "AbilityName": ["DeletePermissionRule"] }anyY
methodRequest method, fixed value:POSTstringY
bodyRequest body, including the unique identifier of the permission ruleanyY

body

ParamDescriptionTypeRequired
idpermission rule idstringY

Example:

export async function deleteR(request: PluginRequest): Promise<PluginResponse> {
const { rule_id, user_uuid } = request.body as any
const response = await fetchONES({
path: `DeletePermissionRule`,
headers: {
AbilityName: ['DeletePermissionRule'],
},
method: 'POST',
body: {
id: rule_id, // The unique id of permission_rule will be returned when add_permission_rule
},
})
const body = response?.body as any
const data = JSON.parse(body.toString())['data']
Logger.info(data)
return {
body: {
data: data,
},
}
}

Check permission point​

Param:

ParamDescriptionTypeRequired
pathRouting, fixed value: CheckPermissionRulestringY
headersRequest header, fixed value: { "AbilityName": ["CheckPermissionRule"] }anyY
methodRequest method, fixed value:POSTstringY
bodyRequest body, containing information about inspectionanyY
teamUUIDteam idstringY

body

ParamDescriptionTypeRequired
permission_fieldpermission unique identifierstringY
user_uuidUser's uuidstringY

Return: Contents in response.body['data']

ParamDescriptionType
is_permissionIs there permissionbool

Example:

export async function checkPermission(request: PluginRequest): Promise<PluginResponse> {
const { user_uuid, permission_field, team_uuid } = request.body as any
const response = await fetchONES({
path: `CheckPermissionRule`,
headers: {
AbilityName: ['CheckPermissionRule'],
},
method: 'POST',
body: {
permission_field: permission_field,
user_uuid: user_uuid,
teamUUID: team_uuid,
},
teamUUID: team_uuid,
})
const body = response?.body as any
const data = JSON.parse(body.toString())['data']
Logger.info(data)
return {
body: {
data: data,
},
}
}

Batch permission point check​

Param:

ParamDescriptionTypeRequired
pathRouting, fixed value: BatchCheckPermissionstringY
headersRequest header, fixed value: { "AbilityName": ["BatchCheckPermission"] }anyY
methodRequest method, fixed value:POSTstringY
bodyRequest body, including all verification informationanyY

body

ParamDescriptionTypeRequired
organization_uuidorganization uuidstringY
permission_fieldunique ID of the permissionstringY
team_uuidteam uuidstringY
instance_idplugin instance idstringY
user_uuidUser's uuidstringY

Return: Contents in response.body['data']

ParamDescriptionType
is_permissionThe result of each permission checkbool[]

Example:

export async function checkBatch(request: PluginRequest): Promise<PluginResponse> {
const { user_uuid, permission_field, user_uuid2 } = request.body as any
const response = await fetchONES({
path: `BatchCheckPermission`,
headers: {
AbilityName: ['BatchCheckPermission'],
},
method: 'POST',
body: {
permission_rules: [
{
organization_uuid: global.onesEnv.organizationUUID,
permission_field: permission_field,
team_uuid: global.onesEnv.teamUUID,
instance_id: global.onesEnv.instanceId,
user_uuid: user_uuid,
},
{
organization_uuid: global.onesEnv.organizationUUID,
permission_field: permission_field,
team_uuid: global.onesEnv.teamUUID,
instance_id: global.onesEnv.instanceId,
user_uuid: user_uuid2,
},
],
},
})
const body = response?.body as any
const data = JSON.parse(body.toString())['data']
Logger.info(data)
return {
body: {
data: data,
},
}
}

Custom Permission Point API - Front End​

Get permission points info​

Get a list of custom permission points and their rules

URL​

https://your-host-name/project/api/project/team/:team_uuid/plugin/permissioninfo/list

HTTP Method​

POST

Transfer method​

json

List of request parameters​
ParamRequiredTypeDescription
instance_uuidYstringplugin_instance_id
team_uuidYstringteamuuid
organization_uuidServe Mode No Requiredstringorganizationuuid
Returns a list of parameters​
ParamTypeDescription
datapermission[]Array of custom permission points
Example of request​
curl --location 'https://your-host-name/project/api/project/team/:team_uuid/plugin/permissioninfo/list' \
--header 'Ones-User-Id: N5tnQP1D' \
--header 'Content-Type: application/json;charset=utf-8' \
--header 'Ones-Auth-Token: 9iiqA0As7UldZ61aOSpzaMAQclSRWXCAGOwNK2D3yolDYodoJGr764bpOVm2QVLp' \
--header 'Ones-Plugin-Id: built_in_apis' \
--data '{
"instance_uuid": "994af1e3".
"team_uuid": "E1r1oDP1".
"organization_uuid": "9qcEhFjy"
}'
Return Example​
{
"data": [
{
"instance_uuid": "994af1e3".
"permission_name": "Permission".
"permission_field": "my_permission".
"permission_id": "1646758032098463744".
"permission_desc": "Custom permission".
"check_mode": "standard".
"rule_info": [
{
"id": "1646758267080151040".
"permission": "1646758032098463744".
"context_type": "plugin".
"context_param_1": "994af1e3".
"context_param_2": "".
"user_domain_type": "single_user".
"user_domain_param": "N5tnQP1D".
"position": 1
}
]
}
]
}

Check permission point​

Checks if a user has permission for a custom permission point

URL​

https://your-host-name/project/api/project/team/:team_uuid/plugin/permissionrule/check

HTTP Method​

POST

Transfer method​

json

List of request param​
ParamRequiredTypeDescription
instance_idYstringplugin_instance_id
team_uuidYstringteamuuid
organization_uuidServe Mode No Requiredstringorganizationuuid
permission_fieldYstringcustom permission point configuration field
Returns a list of parameters​
ParamTypeDescription
is_permissionboolwhether to have permission
Example of request​

The value of the Ones-User-Id parameter in the request header is the user for this verification

curl --location 'http://your-host-name/project/api/project/team/E1r1oDP1/plugin/permissionrule/check' \
--header 'Ones-User-Id: 6wFTfuTt' \
--header 'Content-Type: application/json;charset=utf-8' \
--header 'Ones-Plugin-Id: built_in_apis' \
--data '{
"instance_id": "994af1e3".
"team_uuid": "E1r1oDP1".
"organization_uuid": "9qcEhFjy".
"permission_field": "table_view_permission"
}'
Return Example​
{
"data": {
"is_permission": true
}
}

Custom permission ability​

Step 1: Add configuration​

Use npx op add ability to add custom-permission@1.0.0 type ability, generate backend/src/custom-permission.ts file and generate ability configuration in the plugin configuration file.

The role of the parameters in the ability configuration:

ParamDescriptionType
namepermission point namestring
fieldpermission unique identifierstring
descpermission point descriptionstring
is_plugin_custom_checkwhether to use plugin custom permission verificationbool

Example:

abilities:
- id: WIXJvPcd
name: CustomPermission
version: 1.0.0
abilityType: CustomPermission
function:
customPermissionCheckFunc: customPermissionCheck
config:
- key: name
value: Permission
label: Permission name
show: false
- key: field
value: my_permission
label: Permission field
show: false
- key: desc
value: Custom permission
label: Permission description
show: false
- key: is_plugin_custom_check
value: false
label: Plugin custom permission verification
show: false

Step 2: Write permission verification function​

According to the function name configured in function.customPermissionCheckFunc in the ability configuration, add the corresponding permission check function in backend/src/custom-permission.ts, which will be called when using the plugin custom permission check .

Param:

ParamDescriptionType
user_uuidUser's uuidstring
permission_fieldpermission unique identifierstring
contextPermission context parametersPermissionContext
interface PermissionContext {
project_uuid?: string // ONES Projects -> project ID
filter_view_uuid?: string // My work -> Filters -> filter view ID
program_uuid?: string // ONES Program -> program ID
product_uuid?: string // Product Management -> product ID
testcase_library_uuid?: string // ONES TestCase -> Test case libarary -> test case library ID
test_plan_uuid?: string // ONES Testcase -> Test plans -> test planID
wiki_space_uuid?: string // ONES Wiki -> Spaces -> space ID
workspace_dashboard_uuid?: string // My work -> Dashboards -> dashboard ID
performance_dashboard_uuid?: string // ONES Performace -> Dashboard -> dashboard ID
}
caution

If the permission verification logic relies on permission context parameters, you also need to configure needPermissionContext as true in the module that uses the permission point. Only in this way will the permission be re-verified when there are changes in the permission context.

**Return: **Determine whether the permission check is passed by returning the value of the is_permission field in the body

**Example: **Only restrict users whose user_uuid is SFBs7BHh

import { Logger } from '@ones-op/node-logger'
import { PluginRequest, PluginResponse } from '@ones-op/node-types'

export async function customPermissionCheck(request: PluginRequest): Promise<PluginResponse> {
const body = request?.body as any
Logger.info(JSON.stringify(body, undefined, 2))
let permission = true
if (body.uuid == 'SFBs7BHh') {
permission = false
}
return {
statusCode: 200,
body: {
code: 200,
body: {
is_permission: permission,
},
},
}
}

Examples​

System side component