Skip to main content

Send external notifications

Suitable EnviromentPrivate Deployment

Requirements​

ONES
v3.6.0+

Overview​

The plugin has the ability to send message notifications to users. The supported notification channels include WeCom, DingTalk, Youdu, Lark and email.

tip

If you need to send a notification to a third-party system, you need to access the corresponding** Three-Party System ** To send notifications normally.

Usage​

Step 1: Installation dependency​

Enter the /backend directory of the plugin project, and execute the following command for dependent installation:

npm i @ones-op/node-ability

Step 2: Send notification​

Use the Notify method to send a notification to the user.

Example: use the ONES API registration the ability registration API, and pass in the user uuid when calling the interface, and send a test email to the specified user.

import { Notify, NotifyWay } from '@ones-op/node-ability'

export async function sendEmail(request: PluginRequest): Promise<PluginResponse> {
const { user_uuid } = request?.body as any
if (!user_uuid) {
return {
body: {
error: 'Missing parameters user_uuid',
},
}
}
const NotifyRes = await Notify({
Title: 'Test',
ToUsers: [user_uuid],
NotifyWay: NotifyWay.Email,
MessageBody: [
{
Body: 'Email sending test',
Url: 'https://ones.com/',
},
],
Ext: 'ext string',
})
return {
body: {
NotifyRes: NotifyRes,
data: 'success',
},
}
}

Param

ParamTypeDescriptionRequiredDefault
Titlestringinformation titleY-
ToUsersstring[]Array of users to receive notificationsY-
NotifyWayNotifyWayNotification type, optional values:
- Email: NotifyWay.Email
- Lark: NotifyWay.Lark
- YouDu: NotifyWay.YouDu
- WeCom: NotifyWay.WeChat
- DingTalk: NotifyWay.DingDing
Y-
MessageBodyIMessageBody[]Array of message bodies, each message body contains:
- Body: notification content
- url:notification jump link
Y-
ExtstringMessageType, supports:
When NotifyWay Field is NotifyWay.YouDu, optional values are:
- text: Text
- exlink: External link
N-

Return

ParameterTypeDescriptionRequiredDefault
ErrorErrorMessageContains the following fields:
- Code: Fixed value: 11046
- Msg: Fixed value: NotifyEventFailure 11046
- Err: Error message
N-

The effect of sending mail is as shown in the figure: