Email interception
Require
| ONES |
|---|
| v3.16.37+ |
Overview
The plug-in has the ability to modify the content of system emails, which can be divided into three steps: intercepting emails, rendering emails, and sending emails. In email interception, an email message can actually be regarded as an html. In the ability, an html is split into the following parts:
- wrap: body html, the master of the email, declares the layout positions of the following modules
- header: the header area of the email, generally used to place logos
- body: the main body area of the email, used to display the specific content of the email
- best: tribute message
- support: used to display contact information
- footer: used to display some additional information that needs to be displayed
- copyright: display company information, filing information, etc.
Each module is composed of an html and a set of variables. There may be variable declarations in the html. The specific format is {{.variable name}}, so only the combination of the two is a complete html. The combination The process is also
It's called "rendering".
use
Step 1: Add email interception capabilities through the op tool
Check and add email-intercept@1.0.0
The OP tool will ask whether to use the default value. Just select Yes. The OP tool will add the following content to the plug-in.
Add a new file email-intercept.ts in the plug-in backend
import { Email } from '@ones-op/node-email'
import type { PluginRequest, PluginResponse } from '@ones-op/node-types'
export async function receiveEmail(request: PluginRequest): Promise<PluginResponse> {
const bb = request.body as any
const { mail_context, mail_sections } = bb
const { org_uuid, title, to, label } = mail_context
const { header, support, footer, copyright, body, best, wrap } = mail_sections
const contentList: string[] = [
header.content,
support.content,
footer.content,
copyright.content,
body.content,
best.content,
]
const paramList: Record<string, any>[] = [
header.params,
support.params,
footer.params,
copyright.params,
body.params,
best.params,
]
const textList: string[] = await Email.ParseTemplate(contentList, paramList)
const warpParams: Record<string, any> = wrap.params
warpParams['header'] = textList[0]
warpParams['support'] = textList[1]
warpParams['footer'] = textList[2]
warpParams['copyright'] = textList[3]
warpParams['body'] = textList[4]
warpParams['best'] = textList[5]
const warpText: string[] = [wrap.content]
const warpParam: Record<string, any>[] = [warpParams]
const warpTextList = await Email.ParseTemplate(warpText, warpParam)
await Email.SendEmail(org_uuid, warpTextList[0], title, to)
return {
body: {
res: 'hello world',
requestBody: 'asasas',
},
}
}
- body parameters
| Parameters | Type | Description |
|---|---|---|
| mail_context | object | Email context information, including organization, email title, recipients |
| mail_sections | object | mail content |
| label | string | Corresponding interception scenario context |
| org_uuid | string | The organization to which the plug-in belongs |
| title | string | Email title |
| to | string[] | recipient email list |
| body | object | The body area of the email, used to display the specific content of the email |
| header | object | Email header information, usually displaying logo |
| support | object | used to display contact information |
| best | object | tribute message |
| footer | object | used to display some additional information that needs to be displayed |
| copyright | object | Display company information, filing information, etc. |
| content | string | HTML corresponding to the module |
| params | Record<string, any> | The mapping corresponding to the variables in the template, key is the variable name, and value is the variable value |
Add relevant paragraphs to the abilities field in config/plugin.yaml in the plugin root directory:
abilities:
- id: VBJN_y9T
name: Email interception
version: 1.0.0
abilityType: email-intercept
function:
receiveEmail: receiveEmail
config:
- key: labels
value: -task.batch_merge
fieldType: array
show: false
In the configuration file, the method corresponding to "receiveEmail" is the method for receiving email content, and "labels" is the email context that the plug-in wants to intercept. The above content shows that the email with the system context of "task.batch_merge" will be intercepted and the email will be intercepted. The content is sent to the "receiveEmail" method. The sample code does not make secondary modifications to the email content; Directly render the complete HTML of the email through the rendering SDK, and call the email sending SDK to send the email.
Step 2: Modify the capability configuration according to your own needs, plug-in method
html template
Each business scenario has its own html template, but there will be common parts. For example, the html of wrap in each scenario is the same. In most cases, only the html of the body part is different. This will be explained below.
Public part template
- support: is empty
- best: empty
- body: Each context has a different template.
- wrap: wrap template
- header: header template
- footer: footer template
- copyright: copy template
The scene and html corresponding to each label
Message notifications in work items and sub-work items
The label of all interception scenarios is "task.batch_merge", and the corresponding template for the body is body template