Skip to main content

Synchronize with third-party system

Suitable EnviromentPrivate Deployment

Requirements​

ONES
v3.6.0+

Overview​

This ability allows plugin to integrate a third-party system (including Google, Ding Talk, or other third-party systems). Plugin developers can implement one or more of the following functions according to their own needs:

  1. Third party login:Users can login to ONES by logging in to a third-party system.
  2. Message push:Message notifications for ONES can be sent to third-party systems.
  3. Organizational directories synchronization:Synchronize the department information and personnel information of the third-party system to ONES.
  • Third party login

Under the original login page, there is a new login way. Click this icon to log in to ONES through a third-party system.

  • Message push

After installing the plugin that implements this ability, you can choose whether or not to push the message to the third-party system under each notification mode.

Take `Issue Notification' as an example, add the name of the plugin in the notification option, and select it to notify the third-party system

  • Organizational personnel synchronization

In Configuration -> User management -> member , you can see the users synchronized to ONES by the third-party system and indicate the plugins from which it synchronizes.

Usage​

Add this ability through the OP tool, then implement the corresponding method of each ability point, finally install and enable plugin, and integrate the third-party system in ONES.

Step 1: Add ability through the OP tool:​

Use the Command Line to enter the OP command in the plugin root directory to add ability (this directive requires OP tool version 1.0 or above)

npx op add ability

Select and add account@1.1.0

What are the differences between different versions of Account capabilities?

The 1.1.0 version of the Account ability supports the independent use of message push functionality. Developers can customize the destination of message notifications by configuring the receiverType (instead of sending them to the mapped users in the synchronized third-party organizatiion directory of this plugin).

Developers can decide which version of Account capabilities to use based on their own needs and the ONES system version that the plug-in works with.

The OP tool add the following to the plugin

  • Add related paragraphs to the abilities field in {{plugin root directory}}/config/plugin.yaml.
config/plugin.yaml
    service:
...
...
abilities:
- id: ...
name: account
version: 1.1.0
abilityType: account
function:
sendMessage: SendMessage
createLoginUrl: CreateLoginUrl # create redirect login URL
doExchangeUser: DoExchangeUser # obtain login user information
doPullData: DoPullData # synchronize third-party system user data
config:
# whether the login function is realized
- key: canLogin
value: true
show: false
# whether the synchronization function is realized
- key: canSync
value: true
show: false
# whether the function of sending messages is realized
- key: canMessage
value: true
show: false
# the logo address of the third party login, which is the name of the file, which is required to be placed in the root directory of the front-end resource, web/dist/
- key: logo
value: logo.svg
show: false
# third party login name
- key: title
value: title
show: false
# third party description
- key: desc
value: desc
show: false
# third party description
- key: detailTip
value: detailTip
show: false
# third party configuration reminder
- key: configTip
value: configTip
show: false
# Define the relationship between the recipient and the third-party user ID
- key: receiverType
value: thirdPartID
show: false

Description of receiverType in capability configuration:

  1. receiverType is an enumeration type, only userUUID, thirdPartID.
  2. When the receiverType is userUUID, it means that when the plug-in implements the message notification capability, the receiver of the message can have no binding relationship with the third-party system. In the SendMessage function, to_users is the userUUID list of the ONES system.
  3. When the receiverType is thirdPartID, it means that when the plug-in implements the message notification capability, the receiver of the message needs to have a binding relationship with the third-party system. In the SendMessage function, to_users is the third-party user ID list defined by the plug-in. .
  • The OP tool adds files to the plugin in backend/src/account.ts

Step 2: Realizing the correspondence method of each ability point​

Implement third-party login​

To implement the third-party login ONES feature, you only need to implement the CreateLoginUrl method.If you want to synchronize the user information (including name, email, etc.) of the third-party system to ONES and automatically create an ONES account, you also need to complete the DoExchangeUser method.

CreateLoginUrl needs to return the url called when the third-party system logs in. The request of this method contains the URL redirected to ONES, which can be stitched into the respUrl to be returned by plugin developers.

//Fill in the url with the url that is called when the third party system logs in
export async function CreateLoginUrl(request: PluginRequest): Promise<PluginResponse> {
//After calling the third party login, the returned information will be redirected to that address, and sometimes it is necessary to use this address to concatenate the respUrl
//@ts-ignore
const redirectUrl: string = request?.body.redirect_url
const response: CreateLoginUrlResponse = {
url: '',
}
return CreateLoginUrlRespData(200, '200', '', '', '', response)
}

In the DoExchangeUser method, the plugin developer needs to return the user's information data so that the user's account is created and the information is synchronized in ONES. In the request of this method, there is key code information, through which plugin developers can go to a third-party system to obtain user information, and then return user information in the DoExchangeUser method.

export async function DoExchangeUser(request: PluginRequest): Promise<PluginResponse> {
let code1 = ''
if (typeof request?.body == 'object' && !Array.isArray(request?.body)) {
const authInfo = request.body.auth_info
const obj = JSON.parse(authInfo)
//Get the code after login, and use the code to go to the third party system to obtain user information.
code1 = obj.code
}
//The format of the returned information resp
const resp: DoExchangeUserResponse = {
third_party_id: '',
name: '',
title: '',
avatar: '',
email: '',
phone: '',
}
//Get user information and combine data into resp by calling third-party API
return DoExchangeUserRespData(200, '', '', '', '', resp)
}

Achieve organizational personnel synchronization​

To achieve the function of synchronizing third-party organizational personnel to ONES, you only need to implement the DoPullData method. Plugin developers need to return the information of third-party departments and personnel in this method, so as to synchronize departments and personnel in ONES.

Plugin developers need to go to the third-party system to obtain department information and personnel information, and then reconstruct the data into the return structure specified in the DoPullData method.

export async function DoPullData(request: PluginRequest): Promise<PluginResponse> {
const resp: DoPullDataResponse = {
departments: [],
users: [],
}

// Suppose there is only one root department, the department information must have a root department, and the root department id is "- 1"
const rootDepartment = {
third_party_id: '-1',
name: 'ONES',
parent_id: '',
next_id: '',
}

const departments: DepartmentInfo[] = []
departments[0] = rootDepartment

const userInfos: UserInfo[] = []
userInfos.push({
third_party_id: '1',
name: 'test',
email: 'test@qq.com',
title: 'Position',
department_ids: ['-1'],
company: 'ONES',
})

resp.departments = departments
resp.users = userInfos

return DoPullDataRespData(200, '', '', '', '', resp)
}

Implement message push​

To implement message push to a third-party system, plugin developers need to implement their own sending logic in the SendMessage method. Every time ONES needs to send a message to a third-party system, the SendMessage method will be called, and the exact content of the message will be placed in the request of the SendMessage method.

export async function SendMessage(request: PluginRequest): Promise<PluginResponse> {
Logger.info('SendMessage Request:', request?.body)
Logger.info('[Plugin] SendMessage ======= success')
//Implement the logic of sending to a third-party system
return sendMessageRespData(200, '', '', '', '')
}

Step 3: Do the following in ONES to interface with third-party systems.​

Install and enable plugin that implement this ability in Configuration -> Plugin management -> Org structure syn, login and notification.

Then click "Add integrations" in Configuration -> User management -> Integration, and select the plugin to add.

After the addition is successful, you can enable the required function points.

Examples​

Q&A​

** If I want to use the message sending capability of the account capability, but I don't want to implement the login capability of the plugin to synchronize with the departmental information, how can I do it? **

  1. After adding the three parties to "Account Integration", edit the basic information, and select the account binding method to automatically bind the same system account as "Mailbox".
  2. The plug-in needs to realize the ability of user synchronization, the email parameter in the user must be returned, the system will bind the system user with the three-party user according to the email.
  3. After completing the above actions, the system will synchronize the user information every 10 minutes to bind the user information.
  4. When an event in the system triggers a message notification, and the notifier has to do user information binding, the message will be pushed to the plug-in send message function, the plug-in then forward the message.