Skip to main content

Changelog

All notable changes to this package will be documented in this file.

1.4.0 (2024-02-04)​

Features​

  • cli-plugin:

    • 🌟 Support for debugging and installing plugins in the developer environment.

1.3.0 (2023-12-13)​

Features​

  • cli-plugin:

    • 🌟 Added op.config.mjs configuration file for custom configuration of code scanning and compatibility validation.
    • 🌟 Added support for scanning ONES API during plugin packaging.
  • cli-tools:

    • 🌟 Added opt check command for validating the compatibility of plugin OPK packages.

1.2.29 (2023-10-13)​

Features​

  • cli-plugin:
    • 🌟 new command npx op scan to scan the interface URLs used in the plugin project

1.2.24 (2023-06-27)​

Features​

  • cli-plugin:
    • 🌟 new available version hint
    • 🌟 new command npx op upgrade to upgrade cli
    • 🌟 add options to update plugin version when execute npx op packup

1.2.22 (2023-05-24)​

Features​

  • cli-plugin:

    • 🔥 slots support lifecycle and virtual routing
    • 🌟 install corresponding dependencies on demand for adding capabilities
    • 🌟 update min_system_version automatically for adding capabilities
  • cli-plugin-template: 🌟 simplify backend template dependencies

1.2.16 (2023-02-18)​

Bug Fixes​

  • cli-plugin: 🐞 fix the issue that slot about:blank packup does not support config title icon

1.2.14 (2023-02-08)​

Features​

  • cli-ability-template: 🌟 add ability testcase-report-custom-component

Bug Fixes​

  • cli-ability-template: 🐞 fix the issue that the ability cannot be added to the integration code repository (the ability is bound to the slot and version)

1.2.13 (2023-01-29)​

Bug Fixes​

  • cli-plugin:
    • 🐞 update info when add sub-module
    • 🐞 compatible with no workspaces for old cli

1.2.12 (2023-01-11)​

Features​

  • cli-plugin: 🌟 support plugin config schema
  • cli-plugin-template: 🌟 add config file upgrade.yaml

1.2.9 (2022-12-30)​

Features​

  • cli-ability-template: 🌟 add ability template custom-code-repository and slot-template

1.2.8 (2022-12-06)​

Features​

  • cli-ability-template: 🌟 add sidebar menu template

Bug Fixes​

  • cli-plugin: 🐞 correct dev server listen address

1.2.7 (2022-11-29)​

Features​

  • cli-plugin: 🌟 support layout-custom-quick-action
  • cli-ability-template:
    • 🌟 support layout-custom-quick-action
    • 🌟 support third import

1.2.5 (2022-11-08)​

Bug Fixes​

  • cli-plugin: 🐞 fix the path style issue between POSIX and WINDOWS

1.2.3 (2022-10-28)​

Features​

  • cli-ability-template: 🌟 add ability template custom-permission and item-handler

1.2.0 (2022-10-10)​

Features​

  • cli-plugin: 🌟 match dependencies by major version

1.1.1 (2022-09-27)​

Features​

  • cli-plugin:
    • 🌟 support org level plugin
  • cli-ability-template: 🌟 add ability template timer-task

1.0.0 (2022-09-19)​

Features​

  • cli-plugin:
    • 🌟 output sourcemap for debugging plugin backend
    • 🌟 support auto-complete prompt for add command
    • 🌟 support provide output filename for packup plugin
    • 🌟 support specify log level for webpack during debugging plugin
  • cli-ability-template: 🌟 provide random UUID during ability addition