Trigger slot
| Suitable Enviroment | SaaS |
| Private Deployment |
Requirements
| ONES |
|---|
| v3.10.20+ |
Overview
We have provided slots for the trigger event to edit the data or cancel the action which is triggered in the system.
The slots currently supported are as follows:
Slots
ones:global:trigger
Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.
Usage
modules:
- id: ones-global-trigger-QIOs
title: trigger
moduleType: ones:global:trigger
entry: modules/ones-global-trigger-QIOs/index.html
preload: true
manual: true
actions:
- action:pre:ones:task:fields:update
Supported config options:
-
This option must be set to
true. -
actions(required)
- type:
Array<string>
Configure the trigger event this module needs to be handle.
warningWhen the plugin is activated, you must use the
useVariablesInfooruseActionmethod in accessible context data below to get thenextorcancelfunction and call it, otherwise the system action (Action) will be permanently in the pending state. - type:
-
This option is recommended to be set to
true. -
This option is recommended to be set to
true.
Available Hook API
useVariablesInfo
- ONES Requirement:
v3.13.43+
Similarities and differences with useAction.
- Return data directly, no longer need to get it by way of callback pairs.
- No parameters, return value is inferred by paradigm.
- The
nextandcancelmethods of this method do not bind to the plugin destruction operation, but let the plugin control the module destruction timing by calling thelifecycle.destroymethod. - A new
actionTypereturn is added to determine what Action triggered the current plugin module.
- enableDelayDestroy: true
- enableDelayDestroy: false
import { lifecycle } from '@ones-op/bridge'
import { useVariablesInfo } from '@ones-op/store'
function TriggerPlugin() {
const [visible, setVisible] = useState(true)
const moduleData = useVariablesInfo<'ones:global:trigger'>()
const { sessionID, next, cancel, data: payload, actionType } = moduleData
const handleOk = useCallback(() => {
setVisible(false)
next?.(payload)
lifecycle.destroy()
}, [next, payload])
const handleCancel = useCallback(() => {
cancel?.()
toast.warning('cancel')
setVisible(false)
lifecycle.destroy()
}, [cancel])
return (
<Modal visible={visible} title="Confirm Data" onOk={handleOk} onCancel={handleCancel}>
<p>sessionID: {sessionID}</p>
<p>data: </p>
<p>{JSON.stringify(payload?.data)}</p>
</Modal>
)
}
When the plugin calls next or cancel, it needs to call the lifecycle.destroy method to destroy itself as soon as possible, so that the user can't reactivate the plugin when it is triggered again.
import { lifecycle } from '@ones-op/bridge'
import { useVariablesInfo } from '@ones-op/store'
function TriggerPlugin() {
const [visible, setVisible] = useState(true)
const moduleData = useVariablesInfo<'ones:global:trigger'>()
const { sessionID, next, cancel, data: payload, actionType } = moduleData
const handleOk = useCallback(() => {
setVisible(false)
next?.(payload)
lifecycle.destroy()
}, [next, payload])
const handleCancel = useCallback(() => {
setVisible(false)
toast.warning('cancel')
setTimeout(() => {
cancel?.()
lifecycle.destroy()
}, 1100)
}, [cancel])
return (
<Modal visible={visible} title="Confirm Data" onOk={handleOk} onCancel={handleCancel}>
<p>sessionID: {sessionID}</p>
<p>data: </p>
<p>{JSON.stringify(payload?.data)}</p>
</Modal>
)
}
useAction (Deprecated)
Show More
import { useAction } from '@ones-op/store'
function TriggerPlugin() {
const [visible, setVisible] = useState(false)
const [sessionID, setSessionID] = useState('')
const [payload, setPayload] = useState<Record<string, any>>()
const onOkRef = useRef<Function>()
const onCancelRef = useRef<Function>()
useAction('action:pre:ones:task:fields:update', ({ sessionID, next, data, cancel }) => {
console.log('task fields update data: ', data)
setSessionID(sessionID)
setPayload(data)
onOkRef.current = next
onCancelRef.current = cancel
setVisible(true)
})
const handleOk = useCallback(() => {
setVisible(false)
onOkRef.current?.(payload)
}, [payload])
const handleCancel = useCallback(() => {
setVisible(false)
toast.warning('cancel')
setTimeout(() => {
onCancelRef.current?.()
}, 1100)
}, [])
return (
<Modal visible={visible} title="Confirm Data" onOk={handleOk} onCancel={handleCancel}>
<p>sessionID: {sessionID}</p>
<p>data: </p>
<p>{JSON.stringify(payload?.data)}</p>
</Modal>
)
}
FAQ
How does the open platform handles the conflict when multiple modules use the same action?
The open platform will activate the modules serially with the order in the plugin management page, every module will get
the original data from the action, after all, modules are handled, the result is merged by the function merge
from the lodash and return to the system.
We strongly do not recommend that you use the same action for multiple modules or plugins at the same time, because of
the reason described above, and you cannot delete specific data in a plugin, and modifying attributes of the data will
also be limited by the order of plugins (For the same attribute in the data, the former is overridden by the latter).