ONES Resource
| Suitable Enviroment | SaaS |
| Private Deployment |
Requirements
| ONES |
|---|
| v3.6.0+ |
Overview
We have provided slots for "ONES Resource" to customize the page module for the application.
The slots currently supported are as follows:
Slots
ones:manhour:new
Module path: ONES Resource / new module
Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.
ones:manhour:calendar
ONES Requirement: v3.11.15+
Module path: ONES Resource / Worklog calendar
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:manhour:report
Module path: ONES Resource / Worklog report
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:manhour:log
Module path: ONES Resource / Worklog
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
Usage
modules:
- id: ones-manhour-calendar-E542
title: Worklog calendar
moduleType: ones:manhour:calendar
entry: modules/ones-manhour-calendar-E542/index.html
Supported config options: