ONES Wiki
Requirements
| ONES |
|---|
| v3.6.0+ |
Overview
We have provided slots for "ONES Wiki" to customize the page module for the application.
The slots currently supported are as follows:
Slots
ones:wiki:new
Module path: ONES Wiki / new module
Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.
ones:wiki:group
ONES Requirement: v3.11.15+
Module path: ONES Wiki / Spaces
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:wiki:share
Module path: ONES Wiki / Shared with me
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
Usage
modules:
- id: ones-wiki-group-YjhC
title: Spaces
moduleType: ones:wiki:group
entry: modules/ones-wiki-group-YjhC/index.html
Supported config options: