ONES TestCase
Requirements
| ONES |
|---|
| v3.6.0+ |
Overview
We have provided slots for "ONES TestCase" to customize the page module for the application.
The slots currently supported are as follows:
- ones:testcase:new
- ones:testcase:overview
- ones:testcase:library
- ones:testcase:plan
- ones:testcase:report
Slots
ones:testcase:new
Module path: ONES TestCase / new module
Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.
ones:testcase:overview
ONES Requirement: v3.11.15+
Module path: ONES TestCase / Overview
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:testcase:library
Module path: ONES TestCase / Test case library
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:testcase:plan
Module path: ONES TestCase / Test plans
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:testcase:report
Module path: ONES TestCase / Test reports
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
Usage
modules:
- id: ones-testcase-overview-rsuI
title: Overview
moduleType: ones:testcase:overview
entry: modules/ones-testcase-overview-rsuI/index.html
Supported config options: