Plugin management
| Suitable Enviroment | SaaS |
| Private Deployment |
Requirements
| ONES |
|---|
| v3.6.0+ |
Overview
We have provided slots for "plugin detail" to customize the page module for the application.
There are two entries for "Plugin management" in ONES.
- Organization settings / Plugin management / select the plugin's type / click the "detail" button on the right of the installed plugin
- Configuration / Plugin management / select the plugin's type / click the "detail" button on the right of the installed plugin
The slots currently supported are as follows:
Slots
settings
Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.
Usage
modules:
- id: settings-I1fA
title: settings
moduleType: settings
entry: modules/settings-I1fA/index.html