ONES Pipeline
| Suitable Enviroment | SaaS |
| Private Deployment |
Requirements
| ONES |
|---|
| v3.6.0+ |
Overview
We have provided slots for "ONES Pipeline" to customize the page module for the application.
The slots currently supported are as follows:
Slots
ones:pipeline:new
Module path: ONES Pipeline / new module
Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.
ones:pipeline:index
Module path: ONES Pipeline / Pipeline
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
Usage
modules:
- id: ones-pipeline-index-CF4J
title: Pipeline
moduleType: ones:pipeline:index
entry: modules/ones-pipeline-index-CF4J/index.html
Supported config options: