My work
| Suitable Enviroment | SaaS |
| Private Deployment |
Requirements
| ONES |
|---|
| v3.6.0+ |
Overview
We have provided slots for "My work" to customize the page module for the application.
The slots currently supported are as follows:
- ones:workspace:new
- ones:workspace:index
- ones:workspace:dashboard
- ones:workspace:filter
- ones:workspace:manhour
Slots
ones:workspace:new
Module path: My work / new module
Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.
ones:workspace:overview
Module path: My work / Overview
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:workspace:dashboard
Module path: My work / Dashboards
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:workspace:filter
Module path: My work / Filters
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:workspace:manhour
Module path: My work / Worklog
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
Usage
modules:
- id: ones-workspace-overview-NP56
title: Overview
moduleType: ones:workspace:overview
entry: modules/ones-workspace-overview-NP56/index.html
Supported config options: