Sidebar menu
| Suitable Enviroment | SaaS |
| Private Deployment |
Requirements
| ONES |
|---|
| v3.6.0+ |
Overview
Sidebar menu slot is a set of slots corresponding to product lines one by one.
The slots currently supported are as follows:
- ones:workspace
- ones:project
- ones:wiki
- ones:testcase
- ones:product
- ones:desk
- ones:deskhome
- ones:manhour
- ones:performance
- ones:plan
- ones:pipeline
- ones:version
- ones:app:new
Slots
ones:workspace
Module path: My work
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:testcase
Module path: ONES TestCase
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:product
Module path: Product Management
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:desk
Module path: ONES Desk
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:deskhome
Module path: ONES DeskHome
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
This slot only can be accessed by the URL described below:
${location.protocol}://${location.host}/project/#/desk_home
ones:manhour
Module path: Worklog Management
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:performance
Module path: ONES Performance
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:plan
Module path: ONES Plan
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:pipeline
Module path: ONES Pipeline
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:version
Module path: Version Management
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:app:new
Module path: ONES sidebar menu
Number limit: Declare a maximum of 1 slots in each plugin.
-
The name of the slot can be configured through the title attribute of modules in
plugin.yaml -
The slot needs to be used with capabilities. For details, see: Sidebar Menu
-
If you want to replace the whole right zone including the topbar zone, the
plugin.yamlshould be configured as follows:modules:
- id: ones-workspace-9rMc
title: My work
moduleType: ones:app:new
entry: modules/ones-workspace-9rMc/index.htmlThis has been supported since
ONES v3.16.8+.
Usage
modules:
- id: ones-workspace-9rMc
title: My work
moduleType: ones:workspace
modules:
- id: ones-workspace-A0r3
title: Overview
entry: modules/ones-workspace-9rMc/ones-workspace-A0r3/index.html
Supported config options:
The title config cannot rename the name of the system sidebar menu, which should be configured in the page "Configuration" - "System preference settings" - "Sidebar menu".