@ones-op/store
We provide a set of plugin front-end data acquisition library that can help you get ONES standard data in the plugin. In order to ensure the readability of the data, objects and array data will use Proxy. You cannot and should not modify the data obtained from the standard.
Requirements
| ONES | @ones-op/store |
|---|---|
v3.6.25+ | v0.1.0+ |
Installation
Install the package in the plugin /web directory using the following command:
- npm
- Yarn
- pnpm
npm install @ones-op/store
yarn add @ones-op/store
pnpm add @ones-op/store
Usage
import { useTeamInfo } from '@ones-op/store'
function App() {
const teamInfo = useTeamInfo()
return <div>{teamInfo?.uuid ?? 'unknown'}</div>
}
Index
| API | Description |
|---|---|
| useTeamInfo | Get current team information |
| useOrganizationInfo | Get the current organization information |
| useProductInfo | Get current product information |
| useDashboardInfo | Get current dashboard information |
| useFilterInfo | Get information about the currently accessed filter view |
| usePipelineInfo | Get current pipeline information |
| usePluginInfo | Get current plugin information |
| useProgramInfo | Get the current program information |
| useProjectInfo | Get current project information |
| useProjectRoleInfo | Get the information of the selected project role in the current project member component |
| useTestCaseLibraryInfo | Get the information of the currently access testcase library |
| useTestCaseListInfo | Get the information of the currently access testcase library list |
| useTestPlanInfo | Get the current test plan information |
| useUserInfo | Get the current user information |
| useAction | Action interception method in the system |
| useProgressJobInfo | Get the information of the current task in details of the progress manager task |
| useDocumentInfo | Get the data of the custom macro in the wiki editor |
| useTaskInfo | Get current task information |
| useCodeRepository | Get the code repository info that the current user selected |
| useTestReportComponentInfo | In the plugin custom test report component, get the data of the current component and the method of operating the data |
| useWikiSpaceInfo | Get the current space information |
| useWikiPageInfo | Get the current page information息 |
| useVariablesInfo | Get the non-standard temporary data passed by the current slot据 |
| useModuleInstanceInfo | Get information about the current plugin module instance息 |
| useDashboardCardInfo | In the custom dashboard card, get the context data of the current card |
| useDashboardCardConfigInfo | In the setting pop-up window of the custom dashboard card, get the context data of the current card's config |
| useWikiShareInfo | Get information about the currently visited share page group |
| useWikiTemplatePageInfo | Get information about the template of the currently visited page |
| useCustomEditorInfo | Get the required context information for the custom editor |
Hooks
The exported standard React Hooks usage API, the specific parameters are shown in the following:
useTeamInfo
Get current team information.
Returns
| Description | Type |
|---|---|
| Current team information | TeamInfoType |
Types
interface TeamInfoType {
uuid: string // Current team UUID
name: string // Current team name
}
useOrganizationInfo
Get the current organization information.
Returns
| Description | Type |
|---|---|
| Current organization information | OrganizationInfoType |
Types
interface OrganizationInfoType {
uuid: string // Current organization UUID
name: string // Current organization name
}
useProductInfo
Get current product information.
Returns
| Description | Type |
|---|---|
| Current product information | ProductInfoType |
Types
interface ProductInfoType {
uuid: string // Current product UUID
name: string // Current product name
}
useDashboardInfo
Get current dashboard information.
- Added in:
v0.3.0+ - ONES Requirement:
v3.10.26+
Returns
| Description | Type |
|---|---|
| Current dashboard information | DashboardInfoType |
Types
interface DashboardInfoType {
uuid: string // Current dashboard UUID
name: string // Current dashboard name
}
useFilterInfo
Get information about the currently accessed filter view.
- Added in:
v0.3.0+ - ONES Requirement:
v3.10.26+
Returns
| Description | Type |
|---|---|
| The currently accessed filter view information | FilterInfoType |
Types
interface FilterInfoType {
uuid: string // The currently accessed filter view UUID
name: string // The currently accessed filter view name
}
usePipelineInfo
Get current pipeline information.
- Added in:
v0.3.0+ - ONES Requirement:
v3.10.26+
Returns
| Description | Type |
|---|---|
| Current pipeline information | PipelineInfoType |
Types
interface PipelineInfoType {
uuid: string // Current pipeline information UUID
name: string // Current pipeline information name
}
usePluginInfo
Get current plugin information.
- Added in:
v0.3.0+ - ONES Requirement:
v3.10.26+
Returns
| Description | Type |
|---|---|
| Current plugin information | PluginInfoType |
Types
interface PluginInfoType {
appID: string // Current plugin ID
name: string // Current plugin name
description: string // Current plugin description
version: string // Current plugin version
/**
* Plugin status
* 1:Enabled
* 2:Disabled
*/
status: 1 | 2
instanceID: string // Current plugin instance ID
}
useProgramInfo
Get the current program information.
- Added in:
v0.3.0+ - ONES Requirement:
v3.10.26+
Returns
| Description | Type |
|---|---|
| Current program information | ProgramInfoType |
Types
interface ProgramInfoType {
uuid: string // Current program UUID
name: string // Current program name
}
useProjectInfo
Get current project information.
- Added in:
v0.3.0+ - ONES Requirement:
v3.10.26+
Returns
| Description | Type |
|---|---|
| Current project information | ProjectInfoType |
Types
interface ProjectInfoType {
uuid: string // Current project information UUID
name: string // Current project information name
}
useProjectRoleInfo
Get the information of the selected project role in the current project member component.
- Added in:
v0.3.0+ - ONES Requirement:
v3.10.26+
Returns
| Description | Type |
|---|---|
| The selected project role information | ProjectRoleInfoType |
Types
interface ProjectRoleInfoType {
uuid: string // The selected project project-role UUID
name: string // The selected project project-role name
}
useTestCaseLibraryInfo
Get the information of the currently access testcase library.
- Added in:
v0.3.0+ - ONES Requirement:
v3.10.26+
Returns
| Description | Type |
|---|---|
| Information of the currently access testcase library | testCaseLibraryInfoType |
Types
interface TestCaseLibraryInfoType {
uuid: string // UUID of the currently access testcase library
name: string // Name of the currently access testcase library
}
useTestCaseListInfo
Get the information of the currently access testcase library list.
- Added in:
v0.3.0+ - ONES Requirement:
v3.10.26+
Returns
| Description | Type |
|---|---|
| Information of the currently access testcase library list | TestCaseListInfoType |
When the total number of test cases exceeds 10000, a prompt button Select all test cases will appear after the checkbox.
Types
interface TestCaseListInfoType {
selectedUUIDs: Array<string> // The current selected testcase information
isFullSelected?: boolean // Whether the number of test cases exceeds 10000 and full selected
fullSelectedParams?: { [key: string]: any } // Search parameters and identifiers when the total number of test cases exceeds `10000` and full selected
}
useTestPlanInfo
Get the current test plan information.
- Added in:
v0.3.0+ - ONES Requirement:
v3.10.26+
Returns
| Description | Type |
|---|---|
| Current test plan information | TestPlanInfoType |
Types
interface TestPlanInfoType {
uuid: string // Current test plan UUID
name: string // Current test plan name
}
useUserInfo
Get the current user information.
- Added in:
v0.3.0+ - ONES Requirement:
v3.10.26+
Returns
| Description | Type |
|---|---|
| Current user information | UserInfoType |
Types
interface UserInfoType {
uuid: string // Current user UUID
name: string // Current user name
}
useAction
By calling this hook method, some action in the system can be intercepted. For details about usage and configuration, see Trigger Slot。
- Added in:
v0.3.0+ - ONES Requirement:
v3.10.26+ - Deprecated
If you are writing a new plugin, it is recommended that you use the useVariablesInfo hook to get the data, the useAction hook will be deprecated in the future.
Params
| Params | Description | Type | Required | Default |
|---|---|---|---|---|
| type | Trigger type | ActionEnum | Y | |
| handler | Operation interception processing method | (payload: ActionPayload) => void | Y |
Types
function useAction(type: ActionEnum, handler: (payload: ActionPayload) => void): void
interface ActionPayload<T = unknown> {
/** Session id,the `pre` and `post` values are the same for each action of the same category */
sessionID: string
/** Operating data */
data: T
/** Go ahead and destroy the plugin! */
next: (data: T) => void
/** Cancel the current action and destroy the plugin! */
cancel: (message?: string) => void
}
The type used in useAction must be consistent with the actions declaration in the corresponding module of plugin.yaml, otherwise the plugin cannot be called up or the Action is permanently stuck in pending state.
When the next or cancel method is called, the plugin will be destroyed. At this time, you will not be able to perform some DOM operations, such as the prompt of toast.
If you have a page prompt, you should call the next or cancel method after the prompt is completed.
useProgressJobInfo
Get the information of the current task in details of the progress manager task.
- Added in:
v0.3.1+ - ONES Requirement:
v3.11.0+
Returns
| Description | Type |
|---|---|
| Current task details | ProgressJobInfoStateType |
Types
enum ProgressJobType {
PluginDataSync = 'plugin_data_sync',
}
enum ProgressJobStatus {
DONE = 'done',
FAIL = 'fail',
}
interface ProgressJobInfoStateType {
appID: string // Current plugin appID
moduleID: string // The slot module ID of the current task binding
jobType: ProgressJobType // Current job type
jobStatus: ProgressJobStatus // Current job status
successfulCount: number // Number of tasks successfully executed
unprocessedCount: number // Number of tasks in execution
unsuccessfulCount: number // Number of task execution failures
// Ability payload parameter passed in when using Done
payload: {
data: string
filePath: string
}
}
useDocumentInfo
Get the data of the custom macro in the wiki editor.
- Added in:
v0.4.0+ - ONES Requirement:
v3.11.30+
Returns
| Description | Type |
|---|---|
| The data and the operation for the macro | PluginState |
Types
interface PluginState<DocumentCustomData, Toolbar> {
// Whether it is triggered by the user, if the document is refreshed, it will become `false`.
isTriggerByUser: boolean | undefined
// Whether the user is in the edit interface
editable: boolean | undefined
toolbarState: ToolbarState<Toolbar> | undefined
saveData: (
data: DocumentCustomData,
config: {
exportSpec: ExportSpec[]
},
) => void
// Open or close the toolbar slot
goToState: (state: ToolbarState<Toolbar>) => void
// Delete the current custom macro
destroy: () => void
data: DocumentCustomData | undefined
id: string
exportSpec: ExportSpec[] | undefined
// Upload the resource to the wiki server, because when exporting to word or PDF, and the data needs to be rendered as an image, the image must be uploaded to the wiki server first.
uploadResource:
| ((
file: File,
onProgress: (error: Error | null, percentage: number) => void,
) => Promise<string>)
| undefined
// Get the URL of the wiki resource which is used to get the resource from the wiki server.
getApiService: () => Promise<string | undefined>
// The plugin runtime status, for example, if the plugin data is not expected, the developers can show the public error templates.
status: EmbedPluginRuntimeStatus | undefined
setStatus: (status: EmbedPluginRuntimeStatus) => void
}
interface ExportText {
type: 'text'
data: string
}
interface ExportLink {
type: 'link'
data: {
url: string
title: string
}
}
interface ExportImage {
type: 'image'
// The name of the image in the wiki server
data: string
}
type ExportSpec = ExportImage | ExportLink | ExportText
enum EmbedPluginRuntimeStatus {
/**
* The plugin works fine
*/
VALID = 'VALID',
/**
* The data of the plugin is invalid
*/
DATA_INVALID = 'DATA_INVALID',
/**
* The plugin resource load error
*/
PLUGIN_RESOURCE_INVALID = 'PLUGIN_RESOURCE_INVALID',
}
type BuiltInToolbarStep = 'init'
// Initialization state, all toolbars are closed by default
interface BuiltInToolbarState<T> {
builtIn: true
value: BuiltInToolbarStep
/**
* When the developer opens another slot in the macro(for example, open edit interface), this param can carry the custom data.
* Because the slot is closed and destroyed, the state of the slot will be cleaned, you can save it to the render slot.
*/
customData?: T
}
// Open the toolbar defined by the developer
interface CustomToolbarState<T> {
builtIn: false
value: {
// The moduleID of the toolbar
id: string
title: string
}
customData?: T
}
type ToolbarState<T> = BuiltInToolbarState<T> | CustomToolbarState<T>
useTaskInfo
Get current task information.
- Added in:
v0.5.0+ - ONES Requirement:
v3.11.40+
Returns
| Description | Type |
|---|---|
| Current task information | TaskInfoType |
Types
interface TaskInfoType {
uuid: string // Current task UUID
}
useCodeRepository
Get the code repository info that the current user selected.
- Added in:
v0.6.0+ - ONES Requirement:
v3.13.9+
Returns
| Description | Type |
|---|---|
| The code repository info that the current user selected | CodeRepositoryInfo |
Types
CodeRepositoryInfo.uuidis consistent with thetoolUUIDof the ability's functionaddRepoCommits.
interface CodeRepositoryInfo {
uuid: string
// Back to the preview modal.
previous: () => void
}
useTestReportComponentInfo
In the plugin custom test report component, get the data of the current component and the method of operating the data.
- Added in:
v0.7.0+ - ONES Requirement:
v3.13.22+
Returns
| Description | Type |
|---|---|
| Data of the current component and the operations on the data | TestcaseReportComponentInfo |
Types
interface ExportTitle {
// export title
type: 'title'
content: string
}
interface ExportText {
// export plain text
type: 'text'
content: string
}
interface ExportLink {
// export link
type: 'link'
content: string
url: string
}
interface ExportImage {
// export picture
type: 'image'
url: string
}
interface ExportCustomContent {
// Export custom content
type: 'custom'
content: string // html text
}
type ExportItem = ExportTitle | ExportText | ExportLink | ExportImage | ExportCustomContent
interface TestcaseReportComponentInfo<T extends Record<string, any> = {}> {
isReportMode: boolean // Are you on the report page, if not, you're on re report template page
isViewMode: boolean // Are you in viewing mode, if not, you're in editing mode
contentUUID: string // If you are currently on the report page, it indicates the report ID; if you are on the report template page, it indicates the report template ID
componentSetting: T // Component configuration information
componentUUID: string // the ID of the component
updateComponentSettingConfig: (newConfig: Partial<T>) => void // The method to update the setting of the component
updateComponentExportContent: (exportItems: ExportItem[]) => void // The method to update the export content of the component
addOnSubmitSettingListener: (next: () => void) => () => void // The method to listen the event of submitting the setting popup, and the return value is the method to cancel listening
}
useWikiSpaceInfo
Get the current space information.
- Added in:
v0.8.0+ - ONES Requirement:
v3.13.24+
Returns
| Description | Type |
|---|---|
| Current space information | WikiSpaceInfoType |
Types
interface WikiSpaceInfoType {
uuid: string // Current space UUID
name: string // Current space name
}
useWikiPageInfo
Get the current page information.
- Added in:
v0.11.0+ - ONES Requirement:
v3.14.0+
Returns
| Description | Type |
|---|---|
| Current page information | WikiPageInfoType |
Types
interface WikiPageInfoType {
uuid: string // Current page UUID
name: string // Current page name
}
useVariablesInfo
Get the non-standard temporary data passed by the current slot. You can get the type inference of the data passed by the current slot by specifying the paradigm.
- Added in:
v0.9.0+
Returns
| Description | Type |
|---|---|
| Data passed by the current slot | VariablesMap[T] |
Types
function useVariablesInfo<T extends keyof VariablesMap>(): VariablesMap[T]
type VariablesMap = TriggerActionMap & {
// Unified Trigger type
'ones:global:trigger': Action<Record<PropertyKey, any>> & {
actionType: keyof ActionType
}
// ......
}
type TriggerActionMap = {
[T in keyof ActionType]: ActionType[T] & { actionType: T }
}
useModuleInstanceInfo
Get information about the current plugin module instance.
- Added in:
v0.9.0+ - ONES Requirement:
v3.13.43+ - Module restrictions:
'ones:global:modal'
Currently only available for some modules that require manual activation mode settings.
The same plugin module with manual activation mode will not be activated again while it is already activated, but will be updated with the number of times the module will be activated again.
In some special scenarios, you can listen for changes in this data and re-run the mount operation on the component.
Returns
| Description | Type |
|---|---|
| Current plugin instance information | ModuleInstanceInfo |
Types
interface ModuleInstanceInfo {
invokeAgainCount: number
}
useDashboardCardInfo
In the custom dashboard card, get the context data of the current card.
Requirements
- Added in:
v0.10.0+ - ONES Requirement:
v3.13.43+
Returns
| Description | Type |
|---|---|
| the context data of the current card | DashboardCardInfo<T> |
Types
interface DashboardCardInfo<T extends any> {
cardUUID: string // card UUID
dashboardUUID: string // dashboard UUID
projectUUID?: string // if the dashboard is under the project overview, there will be a project UUID
componentUUID?: string | undefined // if the dashboard is under the project overview, there will be a component UUID
mode: 'normal' | 'edit' | 'play' // the mode of the card
cardData: T // The data of the current card, returned by the backend of the plugin
}
function useDashboardCardInfo<T extends any>(): DashboardCardInfo<T>
useDashboardCardConfigInfo
In the setting pop-up window of the custom dashboard card, get the context data of the current card's config.
Requirements
- Added in:
v0.10.0+ - ONES Requirement:
v3.13.43+
Returns
| Description | Type |
|---|---|
| the context data of the current card's config | DashboardCardConfigInfo<T> |
Types
interface DashboardCardConfigInfo<T extends any> {
dashboardUUID: string // dashboard UUID
projectUUID?: string // if the dashboard is under the project overview, there will be a project UUID
componentUUID?: string // if the dashboard is under the project overview, there will be a component UUID
cardUUID?: string // Card UUID, if it is a pop-up window when creating a new card, the card UUID is undefined
cardConfig?: T // The custom configuration of the card, if it is a pop-up window when creating a new card, the card configuration is undefined
}
function useDashboardCardConfigInfo<T extends any>(): DashboardCardConfigInfo<T>
useWikiShareInfo
Get information about the currently visited share page group.
Requirements
- Added in:
v0.12.0+ - ONES Required:
v3.16.18+
Returns
| Description | Type |
|---|---|
| Information about the currently visited sharing page group | WikiShareInfo |
Types
interface WikiShareInfo {
uuid: string
}
useWikiTemplatePageInfo
Get information about the template of the currently visited page.
Requirements
- Added in:
v0.12.0+ - ONES Required:
v3.16.18+
Returns
| Description | Type |
|---|---|
| Information about the current page template | WikiTemplatePageInfo |
Types
interface WikiTemplatePageInfo {
uuid: string // The UUID of the current page template.
}
useCustomEditorInfo
Get the required context information for the custom editor.
Requirements
- Added in:
vP2060-package+ - ONES Required:
v6.0.0+
Returns
| Description | Type |
|---|---|
| Custom Editor Required Context Information | CustomEditorInfo |
Types
interface CustomEditorInfo {
/** Current page source */
scene?: PageScene
/** current page info */
page?: {
uuid: string
}
/** current team share info */
share?: {
uuid?: string
}
/** current space info */
space?: {
uuid?: string
}
/**
* scene: view only
*
* Presentation mode
*/
presentation?: boolean
/**
* scene: edit only
*
* Publish page, according to the current scene to call the corresponding publishing interface, and automatically jump to the page after the success of the
*/
publish?: () => Promise<void>
/**
* scene: edit only
*
* Publish the page and cancel the publish operation.
*/
cancel?: () => void
}
enum PageScene {
Space,
SpaceHistory,
SpaceEdit,
Share,
ShareHistory,
ShareEdit,
Draft,
DraftEdit,
PageDraft,
PageDraftEdit,
ConflictDraftEdit,
Recycle,
Template,
TemplateEdit,
GlobalTemplate,
GlobalTemplateEdit,
Archived,
Project,
}