Skip to main content

Trigger slot

Suitable EnviromentSaaS
Private Deployment

Requirements​

ONES
v3.10.20+

Overview​

We have provided slots for the trigger event to edit the data or cancel the action which is triggered in the system.

The slots currently supported are as follows:

Slots​

ones:global:trigger​

Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.

Usage​

modules:
- id: ones-global-trigger-QIOs
title: trigger
moduleType: ones:global:trigger
entry: modules/ones-global-trigger-QIOs/index.html
preload: true
manual: true
actions:
- action:pre:ones:task:fields:update

Supported config options:

  • manual(required)

    This option must be set to true.

  • actions(required)

    • type: Array<string>

    Configure the trigger event this module needs to be handle.

    warning

    When the plugin is activated, you must use the useVariablesInfo or useAction method in accessible context data below to get the next or cancel function and call it, otherwise the system action (Action) will be permanently in the pending state.

  • preload

    This option is recommended to be set to true.

  • enableDelayDestroy

    This option is recommended to be set to true.

Available Hook API​

useVariablesInfo​

  • ONES Requirement: v3.13.43+

Similarities and differences with useAction.

  • Return data directly, no longer need to get it by way of callback pairs.
  • No parameters, return value is inferred by paradigm.
  • The next and cancel methods of this method do not bind to the plugin destruction operation, but let the plugin control the module destruction timing by calling the lifecycle.destroy method.
  • A new actionType return is added to determine what Action triggered the current plugin module.
import { lifecycle } from '@ones-op/bridge'
import { useVariablesInfo } from '@ones-op/store'

function TriggerPlugin() {
const [visible, setVisible] = useState(true)

const moduleData = useVariablesInfo<'ones:global:trigger'>()

const { sessionID, next, cancel, data: payload, actionType } = moduleData

const handleOk = useCallback(() => {
setVisible(false)
next?.(payload)
lifecycle.destroy()
}, [next, payload])

const handleCancel = useCallback(() => {
cancel?.()
toast.warning('cancel')
setVisible(false)
lifecycle.destroy()
}, [cancel])

return (
<Modal visible={visible} title="Confirm Data" onOk={handleOk} onCancel={handleCancel}>
<p>sessionID: {sessionID}</p>
<p>data: </p>
<p>{JSON.stringify(payload?.data)}</p>
</Modal>
)
}

useAction (Deprecated)​

Show More
import { useAction } from '@ones-op/store'

function TriggerPlugin() {
const [visible, setVisible] = useState(false)
const [sessionID, setSessionID] = useState('')
const [payload, setPayload] = useState<Record<string, any>>()
const onOkRef = useRef<Function>()
const onCancelRef = useRef<Function>()

useAction('action:pre:ones:task:fields:update', ({ sessionID, next, data, cancel }) => {
console.log('task fields update data: ', data)
setSessionID(sessionID)
setPayload(data)
onOkRef.current = next
onCancelRef.current = cancel
setVisible(true)
})

const handleOk = useCallback(() => {
setVisible(false)
onOkRef.current?.(payload)
}, [payload])

const handleCancel = useCallback(() => {
setVisible(false)
toast.warning('cancel')
setTimeout(() => {
onCancelRef.current?.()
}, 1100)
}, [])

return (
<Modal visible={visible} title="Confirm Data" onOk={handleOk} onCancel={handleCancel}>
<p>sessionID: {sessionID}</p>
<p>data: </p>
<p>{JSON.stringify(payload?.data)}</p>
</Modal>
)
}

FAQ​

How does the open platform handles the conflict when multiple modules use the same action?

The open platform will activate the modules serially with the order in the plugin management page, every module will get the original data from the action, after all, modules are handled, the result is merged by the function merge from the lodash and return to the system.

We strongly do not recommend that you use the same action for multiple modules or plugins at the same time, because of the reason described above, and you cannot delete specific data in a plugin, and modifying attributes of the data ​​will also be limited by the order of plugins (For the same attribute in the data, the former is overridden by the latter).