@ones-op/sdk
We provide a series of utility methods to help you access the ONES system context in your plugins.
Installation
Install this package in the /web directory of your plugin with the following command:
- npm
- Yarn
- pnpm
npm install @ones-op/sdk
yarn add @ones-op/sdk
pnpm add @ones-op/sdk
APIs
useProps
Get the slot Props passed down from the ONES standard product.
Requirements
| ONES | @ones-op/bridge |
|---|---|
v6.0.32+ | v0.1.0+ |
Params
| Params | Description | Type | Required |
|---|---|---|---|
| moduleType | the module type of the slot or entity | string | Y |
| name | the name of the sub-slot of the entity | string | N |
import { useProps } from '@ones-op/sdk'
const App = () => {
const props = useProps('ones:global:banner')
return <div>{props.title}</div>
}
If your slot is a sub-slot in the entity, you can pass the name of the sub-slot in the second parameter.
import { useProps } from '@ones-op/sdk'
const App = () => {
const props = useProps('ones:testcase:report:component:new', 'Card')
return <div>{props.componentUUID}</div>
}
useGlobalAction
Hijack the operation of the standard product in the ones:global:actions slot.
Requirements
| ONES | @ones-op/bridge |
|---|---|
v6.0.32+ | v0.1.0+ |
Params
| Params | Description | Type | Required |
|---|---|---|---|
| actionName | the name of the action to hijack | string | Y |
| middleware | the middleware function to operate hijacking | function | Y |
import { useGlobalAction } from '@ones-op/sdk'
const App = () => {
useGlobalAction('uploadFile', async uploadFile(next, ...params) {
doSomethingBeforeTheAction(...params)
const result = await next(...params)
doSomethingAfterTheAction(result)
})
return null
}