Skip to main content

Front End

Suitable EnviromentSaaS
Private Deployment

Requirements​

ONES
v6.0.32+

Overview​

Progress Middleware is used to help you hijack certain operations (Actions) on the ONES system.

The slots currently supported are as follows:

Slots​

ones:global:actions​

Number limit: Declare a maximum of 1 slots in each plugin, and up to 100 slots in the system.

Usage​

Decalre the module​

modules:
- id: ones-global-actions-ds8y
title: global-action
moduleType: ones:global:actions
entry: modules/ones-global-actions-evcP/index.html
enableMemoryRouter: true

implement the module​

For detailed usage, please refer to here

import { useGlobalAction } from '@ones-op/sdk'

function App() {
// Hijack the file upload behavior in the ONES system.
useGlobalAction('uploadFile', (next, tokenOptions, requestOptions) => {
doSomethingBeforeAction() // do something before calling the original Action, that is, before calling file upload in ONES standard products.
await next(tokenOptions, requestOptions) // calling the original Action, that is, before calling file upload in ONES standard products.
doSomethingAfterAction() // do something after calling the original Action, that is, before calling file upload in ONES standard products.
})

return null
}

ReactDOM.render(<App />, document.getElementById('root'))

FAQ​

  • When an Action is hijacked by multiple plugins, what is the order of execution for the Action?

    • The order of execution of multiple hijacking functions refers to the onion ring model of koa. When a plugin hijacks an Action, it should not sense the existence of other plugins. You only need to deal with parameters before calling next, and deal with return values after calling the Action. In principle, you need to ensure that your hijacking logic will not be affected by the order of Action execution.
    • If your hijacking logic must be strongly related to the order of Action execution, then you can declare the priority in the third parameter of useGlobalAction. The plugin with a higher priority will handle the parameters first and return values last. The default priority is 0, the larger the number, the higher the priority.
    useGlobalAction('uploadFile', (next, tokenOptions, requestOptions) => {
    doSomethingBeforeAction() // Handle parameters first
    await next(tokenOptions, requestOptions) // Call the original Action
    doSomethingAfterAction() // Handle return values last
    }, Number.MAX_SAFE_INTEGER)