Skip to main content

Error code slot

Suitable EnviromentSaaS
Private Deployment

Requirements​

ONES
v3.6.0+

Overview​

This is a global error code module, used to intercept specified error codes to show customized information.

caution

This slot will be deprecated in the future, use the plugin's standard error handling.

The slots currently supported are as follows:

Slots​

ones:global:error:code​

Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.

Usage​

modules:
- id: ones-global-error-code-Q2fV
title: 'error code'
moduleType: ones:global:error:code
errorMessage:
ConstraintViolation.BetaRelatedFieldNotDeletable: This attribute cannot be deleted
ConstraintViolation.BetaRelatedFieldNotEditable: This attribute cannot be edited

Supported config options:

  • errorMessage(required)

    • type: Array

    Configure the error text corresponding to the error code.