Skip to main content

Top banner slot

Suitable EnviromentSaaS
Private Deployment

Requirements​

ONES
v3.6.0+

Overview​

The module is at the top of the system and is used to display the global announcement information.

The slots currently supported are as follows:

Slots​

ones:global:banner​

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

Usage​

modules:
- id: ones-global-banner-evcP
title: banner
moduleType: ones:global:banner
entry: modules/ones-global-banner-evcP/index.html