Skip to main content

Global upload modal slot

Suitable EnviromentSaaS
Private Deployment

Requirements​

ONES
v3.6.0+

Overview​

We provide some slots for the global popup scene to use.

The slots currently supported are as follows:

Slots​

ones:global:modal:upload​

description: This is a global modal module, which will be shown before uploading a file.

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

caution

In the rich text editor (such as description), the slot will not be activated if the image is inserted by copying and pasting.

ones:global:modal​

ONES Requirement: v3.11.40+

description: Global popup window module, used for global popup window interaction or logic layer carrier that does not require an interface.

Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.

caution

Currently, only the Custom Layout Shortcut scenario is supported.

Usage​

modules:
- id: ones-global-modal-upload-rd74
title: upload
moduleType: ones:global:modal:upload
preload: true
manual: true
entry: modules/ones-global-modal-upload-rd74/index.html

Supported config options:

  • preload

    This option is recommended to be set to true.

  • manual(required)

    This option must be set to true.

  • icon

    Works for ones:global:modal.

  • event

    • type: "modal:ok"|"modal:cancel"

    Works for ones:global:modal:upload.

    modal:ok means the user can continue to upload the file. modal:cancel means the user can't upload the file.

    caution

    This option will be deprecated in the future.