System sider slot
| Suitable Enviroment | SaaS |
| Private Deployment |
Requirements
| ONES |
|---|
| v3.6.11+ |
Overview
We have provided slots for the sider menu in the system to hide it.
The slots currently supported are as follows:
Slots
ones:layout:sider
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
Usage
modules:
- id: ones-layout-sider-MTKc
title: sider
moduleType: ones:layout:sider
caution
This slot doesn't support overwriting the system sider menu by the entry.
Supported config options: