Custom permission
| Suitable Enviroment | SaaS |
| Private Deployment |
Requirements
| ONES |
|---|
| v3.10.14+ |
Overview
Sometimes the content customized by the plugin also needs to control access permissions, and only relying on the existing permission verification of ONES cannot satisfy the permission control of the customized content of the plugin. Therefore, we provide the custom permission ability, which can be used to restrict access to the custom content of the plugin. For example: when the front end of the plugin needs to implement "level" pages, and different users (groups) have different access scopes, this ability can be used for permission control.
The permission added with this ability only take effect within the plugin, that is, it can only control the access rights of the content added by the plugin.
Performance
After using the ability to add permissions, there are related permission configurations on the permission configuration page of the plugin details.
Usage
The custom permission ability supports the use of custom permission points in three ways: customized standard permission configuration, custom permission API and custom permission point ability. Currently, custom permission points can only be used with front-end slots. For specific usage methods, please refer to: permission
Only the permission points added through the ability can be customized by the plugin to verify the logic of the permission, and the others use the original permission verification logic of ONES.
Custom standard permission configuration
Add a custom array of standard permission point configuration items in the plugin's configuration file
Param:
| Param | Description | Type | Required | Default |
|---|---|---|---|---|
| name | permission name | string | Y | - |
| field | permission unique identifier | string | Y | - |
| desc | permission description | string | N | - |
Example:
service:
permission:
- name: My custom read permission
field: my-custom-read-permission-key
desc: This is an example of custom read permission
Custom Permission API - BackEnd
Provides non-declarative permission point definition and configuration methods, these APIs can be used in the plugin backend to manage custom permissions.
In the examples, the addition interface is added through the ONES API registration ability for debugging
Add permission point
Param:
| Param | Description | Type | Required |
|---|---|---|---|
| path | Routing, fixed value: AddPermissionInfo | string | Y |
| headers | Request header, fixed value: { "AbilityName": ["AddPermissionInfo"] } | any | Y |
| method | Request method, fixed value:POST | string | Y |
| body | The request body contains permission point information. | any | Y |
body
| Param | Description | Type | Required |
|---|---|---|---|
| permission_name | permission point name | string | Y |
| permission_field | permission unique identifier | string | Y |
| permission_desc | permission point description | string | Y |
Return: Contents in response.body['data']
-
Normal
Param Description Type Note instance_uuid plugin instance id string permission_name permission point name string permission_desc permission point description string permission_field permission unique identifier string permission_id permission point id string check_mode check type string ability_id ability id string -
Error
Return when the added permission point already exists: permission_field of plugin already exists
Example:
export async function addPermission(request: PluginRequest): Promise<PluginResponse> {
const response = await fetchONES({
path: `AddPermissionInfo`,
headers: {
AbilityName: ['AddPermissionInfo'],
},
method: 'POST',
body: {
permission_name: 'api_add_permission', // permission point name
permission_field: 'api_add_permission123', // permission unique identifier
permission_desc: 'test',
},
})
const body = response?.body as any
const data = JSON.parse(body.toString())['data']
Logger.info(data)
return {
body: {
data: data,
},
}
}
Get permission point
Param:
| Param | Description | Type | Required |
|---|---|---|---|
| path | Routing, fixed value: PermissionInfoList | string | Y |
| headers | Request header, fixed value: { "AbilityName":["PermissionInfoList"] } | any | Y |
| method | Request method, fixed value:POST | string | Y |
| teamUUID | team id | string | Y |
Return: Contents in response.body['data'], contains an array of permission point information, and each permission point contains the following content
permission
| Param | Description | Type |
|---|---|---|
| instance_uuid | plugin instance id | string |
| permission_name | permission point name | string |
| permission_desc | permission point description | string |
| permission_field | permission unique identifier | string |
| permission_id | permission point id | string |
| check_mode | check type | string |
| rule_info | information about configured rules | rule[] |
rule
| Param | Description | Type |
|---|---|---|
| id | permission rule id | string |
| permission_id | permission point id | string |
| context_type | context type | string |
| context_param_1 | context param 1 | string |
| context_param_2 | context param 2 | string |
| user_domain_type | user domain type | string |
| user_domain_param | user domain param | string |
| position | location | string |
Example:
export async function listPermission(request: PluginRequest): Promise<PluginResponse> {
const { team_uuid } = request.body as any
const response = await fetchONES({
path: `PermissionInfoList`,
headers: {
AbilityName: ['PermissionInfoList'],
},
method: 'POST',
body: {},
teamUUID: team_uuid,
})
const body = response?.body as any
const data = JSON.parse(body.toString())['data']
Logger.info(data)
return {
body: {
data: data,
},
}
}
Delete permission point
Param:
| Param | Description | Type | Required |
|---|---|---|---|
| path | Routing, fixed value: DeletePermissionInfo | string | Y |
| headers | Request header, fixed value: { "AbilityName": ["DeletePermissionInfo"] } | any | Y |
| method | Request method, fixed value:POST | string | Y |
| body | Request body, including permission unique identifier | any | Y |
body
| Param | Description | Type | Required |
|---|---|---|---|
| permission_field | permission unique identifier | string | Y |
Example:
export async function deletePermission(request: PluginRequest): Promise<PluginResponse> {
const response = await fetchONES({
path: `DeletePermissionInfo`,
headers: {
AbilityName: ['DeletePermissionInfo'],
},
method: 'POST',
body: {
permission_field: 'api_add_permission123',
},
})
const body = response?.body as any
const data = JSON.parse(body.toString())['data']
Logger.info(data)
return {
body: {
data: data,
},
}
}
Add permission rule
Param:
| Param | Description | Type | Required |
|---|---|---|---|
| path | Routing, fixed value: AddPermissionRule | string | Y |
| headers | Request header, fixed value: { "AbilityName": ["AddPermissionRule"] } | any | Y |
| method | Request method, fixed value:POST | string | Y |
| body | Request body, including permission point rule information | any | Y |
| teamUUID | team id | string | Y |
body
| Param | Description | Type | Required |
|---|---|---|---|
| permission_id | permission point id | string | Y |
| user_domain_type | User domain type, optional values: Everyone- everyoneUser- single_userDepartment- departmentUser group- groupTeam Owner - team_owner | string | Y |
| user_domain_param | The unique identifier of the user domain, for example, when the user domain is single_user, the value of this parameter indicates user_uuid | string | Y |
Return: Contents in response.body['data']
- Normal
Contains information about adding permission rules this time
| Param | Description | Type |
|---|---|---|
| org_uuid | organization uuid | string |
| team_uuid | team uuid | string |
| id | permission rule id | string |
| deleted | delete or not | Bool |
| permission_id | permission point id | string |
| context_type | context type | string |
| context_param_1 | context param 1 | string |
| context_param_2 | context param 2 | string |
| user_domain_type | user domain type | string |
| user_domain_param | user domain param | string |
| position | location | string |
- Error
When the user domain type of the added permission point rule is wrong, return: <UserDomainNotExist> UserDomainNotExist
Example:
export async function addRule(request: PluginRequest): Promise<PluginResponse> {
const { user_uuid, permission_id, team_uuid } = request.body as any
const response = await fetchONES({
path: `AddPermissionRule`,
headers: {
AbilityName: ['AddPermissionRule'],
},
method: 'POST',
body: {
permission_id: permission_id, // The unique id of permission, returned when add_permission_info
user_domain_type: 'single_user', // User domain type, existing: everyone, single_user, department, group, team_owner
user_domain_param: user_uuid, // The unique identifier of the user domain, for example, when user_domain_type is single_user, user_domain_param is the identifier of user_uuid
teamUUID: team_uuid,
},
teamUUID: team_uuid,
})
const body = response?.body as any
const data = JSON.parse(body.toString())['data']
Logger.info(data)
return {
body: {
data: data,
},
}
}
Delete permission rule
Param:
| Param | Description | Type | Required |
|---|---|---|---|
| path | Routing, fixed value: DeletePermissionRule | string | Y |
| headers | Request header, fixed value: { "AbilityName": ["DeletePermissionRule"] } | any | Y |
| method | Request method, fixed value:POST | string | Y |
| body | Request body, including the unique identifier of the permission rule | any | Y |
body
| Param | Description | Type | Required |
|---|---|---|---|
| id | permission rule id | string | Y |
Example:
export async function deleteR(request: PluginRequest): Promise<PluginResponse> {
const { rule_id, user_uuid } = request.body as any
const response = await fetchONES({
path: `DeletePermissionRule`,
headers: {
AbilityName: ['DeletePermissionRule'],
},
method: 'POST',
body: {
id: rule_id, // The unique id of permission_rule will be returned when add_permission_rule
},
})
const body = response?.body as any
const data = JSON.parse(body.toString())['data']
Logger.info(data)
return {
body: {
data: data,
},
}
}
Check permission point
Param:
| Param | Description | Type | Required |
|---|---|---|---|
| path | Routing, fixed value: CheckPermissionRule | string | Y |
| headers | Request header, fixed value: { "AbilityName": ["CheckPermissionRule"] } | any | Y |
| method | Request method, fixed value:POST | string | Y |
| body | Request body, containing information about inspection | any | Y |
| teamUUID | team id | string | Y |
body
| Param | Description | Type | Required |
|---|---|---|---|
| permission_field | permission unique identifier | string | Y |
| user_uuid | User's uuid | string | Y |
Return: Contents in response.body['data']
| Param | Description | Type |
|---|---|---|
| is_permission | Is there permission | bool |
Example:
export async function checkPermission(request: PluginRequest): Promise<PluginResponse> {
const { user_uuid, permission_field, team_uuid } = request.body as any
const response = await fetchONES({
path: `CheckPermissionRule`,
headers: {
AbilityName: ['CheckPermissionRule'],
},
method: 'POST',
body: {
permission_field: permission_field,
user_uuid: user_uuid,
teamUUID: team_uuid,
},
teamUUID: team_uuid,
})
const body = response?.body as any
const data = JSON.parse(body.toString())['data']
Logger.info(data)
return {
body: {
data: data,
},
}
}
Batch permission point check
Param:
| Param | Description | Type | Required |
|---|---|---|---|
| path | Routing, fixed value: BatchCheckPermission | string | Y |
| headers | Request header, fixed value: { "AbilityName": ["BatchCheckPermission"] } | any | Y |
| method | Request method, fixed value:POST | string | Y |
| body | Request body, including all verification information | any | Y |
body
| Param | Description | Type | Required |
|---|---|---|---|
| organization_uuid | organization uuid | string | Y |
| permission_field | unique ID of the permission | string | Y |
| team_uuid | team uuid | string | Y |
| instance_id | plugin instance id | string | Y |
| user_uuid | User's uuid | string | Y |
Return: Contents in response.body['data']
| Param | Description | Type |
|---|---|---|
| is_permission | The result of each permission check | bool[] |
Example:
export async function checkBatch(request: PluginRequest): Promise<PluginResponse> {
const { user_uuid, permission_field, user_uuid2 } = request.body as any
const response = await fetchONES({
path: `BatchCheckPermission`,
headers: {
AbilityName: ['BatchCheckPermission'],
},
method: 'POST',
body: {
permission_rules: [
{
organization_uuid: global.onesEnv.organizationUUID,
permission_field: permission_field,
team_uuid: global.onesEnv.teamUUID,
instance_id: global.onesEnv.instanceId,
user_uuid: user_uuid,
},
{
organization_uuid: global.onesEnv.organizationUUID,
permission_field: permission_field,
team_uuid: global.onesEnv.teamUUID,
instance_id: global.onesEnv.instanceId,
user_uuid: user_uuid2,
},
],
},
})
const body = response?.body as any
const data = JSON.parse(body.toString())['data']
Logger.info(data)
return {
body: {
data: data,
},
}
}
Custom Permission Point API - Front End
Get permission points info
Get a list of custom permission points and their rules
URL
https://your-host-name/project/api/project/team/:team_uuid/plugin/permissioninfo/list
HTTP Method
POST
Transfer method
json
List of request parameters
| Param | Required | Type | Description |
|---|---|---|---|
| instance_uuid | Y | string | plugin_instance_id |
| team_uuid | Y | string | teamuuid |
| organization_uuid | Serve Mode No Required | string | organizationuuid |
Returns a list of parameters
| Param | Type | Description |
|---|---|---|
| data | permission[] | Array of custom permission points |
Example of request
curl --location 'https://your-host-name/project/api/project/team/:team_uuid/plugin/permissioninfo/list' \
--header 'Ones-User-Id: N5tnQP1D' \
--header 'Content-Type: application/json;charset=utf-8' \
--header 'Ones-Auth-Token: 9iiqA0As7UldZ61aOSpzaMAQclSRWXCAGOwNK2D3yolDYodoJGr764bpOVm2QVLp' \
--header 'Ones-Plugin-Id: built_in_apis' \
--data '{
"instance_uuid": "994af1e3".
"team_uuid": "E1r1oDP1".
"organization_uuid": "9qcEhFjy"
}'
Return Example
{
"data": [
{
"instance_uuid": "994af1e3".
"permission_name": "Permission".
"permission_field": "my_permission".
"permission_id": "1646758032098463744".
"permission_desc": "Custom permission".
"check_mode": "standard".
"rule_info": [
{
"id": "1646758267080151040".
"permission": "1646758032098463744".
"context_type": "plugin".
"context_param_1": "994af1e3".
"context_param_2": "".
"user_domain_type": "single_user".
"user_domain_param": "N5tnQP1D".
"position": 1
}
]
}
]
}
Check permission point
Checks if a user has permission for a custom permission point
URL
https://your-host-name/project/api/project/team/:team_uuid/plugin/permissionrule/check
HTTP Method
POST
Transfer method
json
List of request param
| Param | Required | Type | Description |
|---|---|---|---|
| instance_id | Y | string | plugin_instance_id |
| team_uuid | Y | string | teamuuid |
| organization_uuid | Serve Mode No Required | string | organizationuuid |
| permission_field | Y | string | custom permission point configuration field |
Returns a list of parameters
| Param | Type | Description |
|---|---|---|
| is_permission | bool | whether to have permission |
Example of request
The value of the Ones-User-Id parameter in the request header is the user for this verification
curl --location 'http://your-host-name/project/api/project/team/E1r1oDP1/plugin/permissionrule/check' \
--header 'Ones-User-Id: 6wFTfuTt' \
--header 'Content-Type: application/json;charset=utf-8' \
--header 'Ones-Plugin-Id: built_in_apis' \
--data '{
"instance_id": "994af1e3".
"team_uuid": "E1r1oDP1".
"organization_uuid": "9qcEhFjy".
"permission_field": "table_view_permission"
}'
Return Example
{
"data": {
"is_permission": true
}
}
Custom permission ability
Step 1: Add configuration
Use npx op add ability to add custom-permission@1.0.0 type ability, generate backend/src/custom-permission.ts file and generate ability configuration in the plugin configuration file.
The role of the parameters in the ability configuration:
| Param | Description | Type |
|---|---|---|
| name | permission point name | string |
| field | permission unique identifier | string |
| desc | permission point description | string |
| is_plugin_custom_check | whether to use plugin custom permission verification | bool |
Example:
abilities:
- id: WIXJvPcd
name: CustomPermission
version: 1.0.0
abilityType: CustomPermission
function:
customPermissionCheckFunc: customPermissionCheck
config:
- key: name
value: Permission
label: Permission name
show: false
- key: field
value: my_permission
label: Permission field
show: false
- key: desc
value: Custom permission
label: Permission description
show: false
- key: is_plugin_custom_check
value: false
label: Plugin custom permission verification
show: false
Step 2: Write permission verification function
According to the function name configured in function.customPermissionCheckFunc in the ability configuration, add the corresponding permission check function in backend/src/custom-permission.ts, which will be called when using the plugin custom permission check .
Param:
| Param | Description | Type |
|---|---|---|
| user_uuid | User's uuid | string |
| permission_field | permission unique identifier | string |
| context | Permission context parameters | PermissionContext |
interface PermissionContext {
project_uuid?: string // ONES Projects -> project ID
filter_view_uuid?: string // My work -> Filters -> filter view ID
program_uuid?: string // ONES Program -> program ID
product_uuid?: string // Product Management -> product ID
testcase_library_uuid?: string // ONES TestCase -> Test case libarary -> test case library ID
test_plan_uuid?: string // ONES Testcase -> Test plans -> test planID
wiki_space_uuid?: string // ONES Wiki -> Spaces -> space ID
workspace_dashboard_uuid?: string // My work -> Dashboards -> dashboard ID
performance_dashboard_uuid?: string // ONES Performace -> Dashboard -> dashboard ID
}
If the permission verification logic relies on permission context parameters, you also need to configure needPermissionContext as true in the module that uses the permission point. Only in this way will the permission be re-verified when there are changes in the permission context.
**Return: **Determine whether the permission check is passed by returning the value of the is_permission field in the body
**Example: **Only restrict users whose user_uuid is SFBs7BHh
import { Logger } from '@ones-op/node-logger'
import { PluginRequest, PluginResponse } from '@ones-op/node-types'
export async function customPermissionCheck(request: PluginRequest): Promise<PluginResponse> {
const body = request?.body as any
Logger.info(JSON.stringify(body, undefined, 2))
let permission = true
if (body.uuid == 'SFBs7BHh') {
permission = false
}
return {
statusCode: 200,
body: {
code: 200,
body: {
is_permission: permission,
},
},
}
}