Skip to main content

Download and Installation

Overview​

ONES Open Platform Diagtools download and installation.

Command line Tools​

Online Installation​

In the networking environment, we recommend that you use Node.js to install online. You don’t need to consider the system architecture online installation, and it is easier to upgrade in the future.

Install the latest version:

npm install -g @ones/diagtools-cli

Install a specific version:

npm install -g @ones/diagtools-cli@[version]

Use:

diagtools --help

Offline Installation​

For the internal network environment and users who do not want to install node.js, we recommend you to download the offline compressing package, which contains all the dependencies required for the CLI tool. You can directly decompress it.

After downloading the offline package, you need to use tar to decompress.

tar -zxvf [name].tar.gz

Use:

./diagtools/bin/diagtools --help

Or add the decompressed diagtools/bin/diagtools to your system's bin directory, global use:

diagtools --help

Download​

ArchitectureApplication versionONES versionLast updated timeDescriptionDownload
Window-x640.1.03.12.0+2020-12-19For Windows system, x64 architecture packagedownload
MacOS-x640.1.03.12.0+2020-12-19For MacOS, x64 architecture package (Intel chip)download
Linux-x640.1.03.12.0+2020-12-19For Linux system, x64 architecture packagedownload
Linux-arm640.1.03.12.0+2020-12-19For Linux system, arm64 architecture packagedownload

Desktop Tools​

If your system is MacOS 12 or later, you may encounter this when you install:

You need to go to the "security & privacy" in "System Preferences". Click the "Open Anyway" button in the "General" panel to confirm that you plan to open or install this app.

Then perform the installation action again to complete the installation.

Download​

ArchitectureApplication versionONES versionLast updated timeDescriptionDownload
Window-x640.1.03.12.0+2020-12-19For Windows system, x64 architecture installerdownload
Window-x640.1.03.12.0+2020-12-19For Windows system, x64 architecture portable packagedownload
MacOS0.1.03.12.0+2020-12-19For MacOS, x64 or arm64 architecture installerdownload