Skip to main content

Desktop Usage

Requirements​

ONES
v3.12.0+

Overview​

ONES Open Platform Desktop diagnostic tools, it can connect to the ONES Open Platform according to the configuration you set, view the logs and status of the platform and plug in, so that you can troubleshoot problems, or export the current data, to others joint troubleshooting.

note

Its main features are the same as CLI.

Installation​

See Download and Installation.

Add and Switch Profile​

The profile of the Desktop Tools can communicate with the CLI profile. If you do not initialized through the CLI, click Add Profile to add the configuration when you open the tool for the first time.

If your computer already has at least one piece of profile, the app will automatically skip the empty screen and enter the main screen. You can switch profiles, add, update, delete and other operations through the menu in the upper left corner.

When you add a profile, the application will verify the format of the Open Platform address you fill in. Only if you fill in the protocol address and port can you submit the profile successfully through verification.

note

CLI does not verify your profile input format, and you need to ensure that the profile is correct.

Refresh Data​

Because of the particularity of the diagnostic tools, we do not get or update the data for you by default. After you need to add the profile, click "Refresh" in the upper right corner to obtain the information at the current moment.

caution

"Refresh" will cover a piece of data. If you expect the information before obtaining the data, please click "Export" to export in advance.

View Logs​

After the "Refresh" retrieves the data, you can filter the component logs through the selector on the upper right of the logging module.

View Status​

After the "Refresh" retrieves the data, you can switch through the tab, viewing abilities, plugins, components information.