Skip to main content

CLI Usage

Requirements​

ONES
v3.12.0+

Overview​

ONES Open Platform command line diagnostic tools, it can connect to the ONES Open Platform according to the configuration you set, view the logs and status of the platform and plug in, so that you can troubleshoot problems, or export the current data, to others joint troubleshooting.

note

Its main features are the same as Desktop.

Installation​

See Download and Installation.

Help Information​

CLI provides a variety of ways to help information output, you can add --help at the end of each command to output the help information of the current command, or use the help command to view the help information.

diagtools help

At the same time, the TAB key to automatically complete the command. You can use the autocomplete command to output the current automatic completion function installation.

diagtools autocomplete

Update Config (config)​

CLI provides config sub-command, you can use the following command to manage the profile currently in use.

  • config get
  • config set
  • config list
  • config delete
note

The initial behavior of the CLI is slightly different from that of the desktop. By default, a profile named default is automatically created for you.

If you only have one profile (There's only one open platform that you can connect to),You can use the config subcommand without using any of the profile subcommands.

diagtools config set address tcp://127.0.0.1:30002

Add and Switch Profile (profile)​

CLI provides profile sub-command, if you have multiple server profile that you need to connect to, you can use the following command to manage each profile.

  • profile new
  • profile use
  • profile delete
  • profile list

The following is an example of the second profile and used:

$ diagtools profile add secondProfileName

$ diagtools profile use secondProfileName

$ diagtools config set address tcp://127.0.0.1:9007

View Logs (log)​

CLI provides log command, you can use the log command to view the logs of each component if your profile is correct or if you temporarily specify a required configuration.

Interactive selection to view the log of a plugin:

diagtools log plugin

Non-interactive Specifies that logs for a plugin are viewed (the id is instanceID; if the id does not exist, no information is output):

diagtools log plugin --id ce1f55d2

Interactive selection to view logs for a host instance (non-interactive command as above):

diagtools log host

Interactive selection to view logs for a platform instance (non-interactive command as above):

diagtools log platform

View Status (list)​

CLI provides list command, you can use the list command to see the status of each component if your profile is correct or if you have temporarily specified a required configuration.

View abilities status:

diagtools list abilities

View plugins status:

diagtools list plugins

View components status:

diagtools list components

Dump Data (dump)​

CLI provides dump command, when it is inconvenient to view on the server, you can use the dump command to export and import it to the desktop to view.

Export to the current directory (default file suffix is the year month day hour minute second of the current UTC time):

diagtools dump .

Export to the current directory and specify the name:

diagtools dump ./data.json