@ones-op/utils
We provide some commonly used tool library encapsulation.
Installation
Install the package in the plugin /web directory using the following command:
- npm
- Yarn
- pnpm
npm install @ones-op/utils
yarn add @ones-op/utils
pnpm add @ones-op/utils
Usage
import { stringifySearchQuery } from '@ones-op/utils'
import type { SearchQueryType } from '@ones-op/utils'
const testCasePlanURL = 'https://ones.com/project/#/testcase/team/JTsTqqQo/plan'
const App = () => {
const searchQuery: SearchQueryType = {
allow: 'fullscreen',
conditions: [
{
field: 'test_plan_related_project',
operate: 'include',
value: ['SbmRCmXZ36snAhUY'],
},
],
}
const src = stringifySearchQuery(testCasePlanURL, searchQuery)
return <iframe width="1500" height="800" allow="payment" src={src}></iframe>
}
Index
| API | Description |
|---|---|
| stringifySearchQuery | Splicing URL and search parameters |
APIs
stringifySearchQuery
Splicing URL and search parameters.
Requirements
| ONES | @ones-op/bridge |
|---|---|
| v3.13.35+ | v0.21.1 |
Params
| Params | Description | Type | Required | Default |
|---|---|---|---|---|
| url | Target page url | string | Y | - |
| searchQuery | Search parameters | SearchQueryType | Y | - |
Type
export interface SearchQueryType {
/** filter query criteria */
conditions: {
/** filter project */
field: FieldType
/** filter operate */
operate: OperateType
/** filter value */
value: string[]
}[]
/** full screen of the page */
allow?: 'fullscreen'
}
/** filter project: currently only support 'test_plan_related_project' */
type FieldType = 'test_plan_related_project'
/** filter operate: include: equal, exclude: not equal */
type OperateType = 'include' | 'exclude'