@ones-op/event
We provide a set of event communication library that can help you communicate within the plugin, or trigger some ONES events via events.
Requirements
| @ones-op/event |
|---|
v0.6.2+ |
Installation
Install the package in the plugin /web directory using the following command:
- npm
- Yarn
- pnpm
npm install @ones-op/event
yarn add @ones-op/event
pnpm add @ones-op/event
Usage
import { OPDispatch } from '@ones-op/event'
OPDispatch('invoke:ones:global:progressManager')
Index
| API | Description |
|---|---|
| OPDispatch | The ONES-level dispatcher |
| OPPluginListener | The plugin-level listener |
| OPPluginDispatch | The plugin-level dispatcher |
APIs
OPDispatch
This method triggers a number of events within the ONES system.
Params
| Params | Description | Type | Required | Default |
|---|---|---|---|---|
| type | Event name | string | Y |
OPPluginListener
Add plugin-level event listener, which cannot be used across plugin and are triggered by events dispatched by OPPluginDispatch.
When the component is destroyed, you should call the returned unlistener function to avoid memory leaks and some unexpected bugs caused by repeated listening.
Cross-module communication is supported only under the same plugin and when the modules are active at the same time.
Params
| Params | Description | Type | Required | Default |
|---|---|---|---|---|
| type | Event name | string | Y | |
| listener | Event handler function | OPListenFunc | Y | |
| options | listener options | { once?: boolean } | N | { once: false } |
options.once
The listener should be invoked at most once after being added. If true, the listener would be automatically removed when invoked. If not specified, defaults to false.
Returns
The function to remove the current event listener.
Types
type OPListenFunc<P, R = unknown> = (
params: P
) => Promise<OPListenerProcessResult<R> | void> | OPListenerProcessResult<R> | void
interface OPListenerProcessResult<T> {
state: OPListenerProcessResultState
data: T
}
enum OPListenerProcessResultState {
SUCCESS = 'SUCCESS',
FAILED = 'FAILED',
}
Examples
useEffect(() => {
const cancelFn = OPPluginListener('onChange', (params) => {
console.log(`new value: ${params?.value}`)
})
return () => cancelFn()
}, [])
OPPluginDispatch
Dispatching plugin-level event, which cannot be used across plugins, will trigger an event listener added by OPPluginListener.
Cross-module communication is supported only under the same plugin and when the modules are active at the same time.
Params
| Params | Description | Type | Required | Default |
|---|---|---|---|---|
| type | Event name | string | Y | |
| params | Event params | any | N |
Returns
Returns all event processing results as Promise and you can implement a simple communication quiz based on this feature.
If there is no such need, you can ignore the return value and do not need to see the following introduction.
The actual Promise.all(resultList) object is returned, and the resultList is the Promise of all event processing results, so your event method should always have a return value response whether it errors or not.
If there are multiple listeners for the same event, the returned results will be pushed into the resultList array in the order of event registration.
We strongly recommend that you write the return value of the event handler method in the following OPListenerProcessResult format.
enum OPListenerProcessResultState {
SUCCESS = 'SUCCESS',
FAILED = 'FAILED',
}
interface OPListenerProcessResult<T> {
state: OPListenerProcessResultState
data: T
}
If you don't do any return in the event handler, or if the return value is undefined, we will return the following data by default.
{
state: MFListenerProcessResultState.SUCCESS,
data: undefined,
}
Examples
The OPPluginListener handler returns data.
import { OPPluginListener, OPListenerProcessResultState } from '@ones-op/event'
useEffect(() => {
const cancelFn = OPPluginListener('onChange', (params) => {
return {
state: OPListenerProcessResultState.SUCCESS,
data: params.value + 1,
}
})
return () => cancelFn()
}, [])
OPPluginDispatch prints its return value.
OPPluginDispatch('onChange', { value: 0 }).then((resultList) => {
console.log(`value is increased: ${resultList[0].data === 1}`)
})