Skip to main content

Execute workflow for issue

POST 

/project/issues/:issueID

Execute workflow for issue.

History​

VersionChanges
v3.14.117, v3.15.26Added in: v3.14.117, v3.15.26

Request​

Path Parameters

    issueID stringrequired

    The issue ID

Query Parameters

    teamID stringrequired

    The team ID

    action stringrequired
    • action: Actions on issue,support executeWorkflow.

Body

required

The issue workflow information to update

    id stringrequired

    Possible values: non-empty and <= 8 characters

    The id of the issue workflow.

    fieldValues

    object[]

    The fieldValues of the issue project.

  • Array [

  • fieldID stringrequired

    Possible values: >= 8 characters

    The ID of fieldValue.

    type integerrequired

    Possible values: >= 1

    The type of fieldValue.

    value objectrequired

    The value of fieldValue.

  • ]

  • resources

    object[]

    Attachment ids to be associated, separated by commas.

  • Array [

  • id string
  • ]

  • comment

    object[]

    The comment of the issue.

  • Array [

  • contentType integerrequired

    Possible values: >= 1

    The contentType of comment.

    text stringrequired

    The text of comment.

  • ]

  • timeEstimated

    object

    The timeEstimated of the issue.

    hours integer

    timeSpent

    object[]

    The timeSpent of the issue.

  • Array [

  • owner stringrequired

    The owner of timeSpent.

    startTime integerrequired

    The startTime of timeSpent.

    hours integerrequired

    The hours of timeSpent.

    description string

    The description of timeSpent.

  • ]

Responses​

Request is successful.

Schema

    result string

    The result of this request.

    errorCode string

    The error code of this request.

    errorMsg string

    Error message for this request.

    errorData object

    Error meta data for this request.

Loading...