Version: 2.0
System
This resource represents the system. Use it to get system info and operate system resources.
Authentication
- OAuth 2.0: oauth2
Security Scheme Type: | oauth2 |
|---|---|
OAuth Flow (authorizationCode): | Token URL: https://your-domain/oauth2/token Authorization URL: https://your-domain/oauth2/authorize Scopes:
|
📄️ Get system endpoints
Get system endpoints.