Skip to main content

Fetch API

danger

ONES API 已废弃。请使用Open API。

We provide a set of open platform api, which can be used directly, allowing you to use various capabilities of the plugin management page in your plugin app, such as installPlugin, exportPluginLog, etc.

Compatibility​

Environment​

ONES
v3.7.6+

Install​

Go to the /web directory and install this package with the following command:

npm install @ones-op/fetch

Use​

import { getPluginsList } from '@ones-op/fetch'

function PluginList() {
const team = 'your_team'
const organization = 'your_organization'

useEffect(() => {
getPluginsList({
team,
organization,
})
.then(console.log)
.catch(console.error)
}, [])

return <div>fetch api demo</div>
}

Overview​

  • @ones-op/fetch API is written in REST style.
  • @ones-op/fetch API distinguish usage scenarios by parameter scene
    • Team scene 'TEAM', the default scene
    • Organizing scene 'ORG'
  • @ones-op/fetch API other common parameters are
    • Team UUID team,permission checkpoint in team scene.
    • Organization UUID organization,permission checkpoint in organizing scene.
    • Plugin UUID app
    • Plugin Instance UUID instance

Implementation​

There is no need to pay attention to this part during the development process. Here is the implementation introduction, and developers can choose to read it.

URI Structure​

@ones-op/fetch API provides access to resources via a URI path. Use :team or {} to mark part of the URI path as part of the URI path that can be replaced with parameters. URI paths follow these rules:

http(s)://{your-host-name}/project/api/project/team/:team/{fetch-api}

for example:

https://my-host-name/project/api/project/team/EW5GozZh/plugin/list
https://my-host-name/project/api/project/team/EW5GozZh/plugin/config/list
  • {fetch-api} is the url of the @ones-op/fetch API
  • /plugin/list is the url of getPluginsList
  • /plugin/config/list is the url of getPluginConfigs

Request Headers​

Parameter NameParameter LocationTypeDescription
Ones-Plugin-IdHTTP HeadersstringInstance UUID of the plugin
Ones-Check-PointHTTP HeadersstringPermission checkpoint team/organization
Ones-Check-IdHTTP HeadersstringPermission checkpoint Team UUID /Organization UUID
  • Ones-Plugin-Id passes a fixed value in @ones-op/fetch API: 'built_in_apis'.
  • Ones-Check-Pointpasses the parameter scene
  • Ones-Check-Id passes in the Team UUID or Organization UUID depends on the scene

for example:

--request POST 'https://my-host-name/project/api/project/team/WDRiVkKD/plugin/list'
--header 'Ones-Check-Point: team'
--header 'Ones-Check-Id: WDRiVkKD'
--header 'Ones-Plugin-Id: built_in_apis'

API​

1. uploadPlugin​

  • Upload plugin
  • Plugin files are .opk files
  • The return value app, id and other attributes are used as input parameters of the post-method installPlugin, upgradePlugin, deletePlugin
  • The return value is_upgrade indicates whether the file is an upgrade package

URL​

  • /plugin/upload_opk

Parameter​

Parameter NameTypeRequiredDefaultDescription
scene'TEAM' | 'ORG'false'TEAM'Usage Scenarios
organizationstringtrueOrganization UUID
teamstringtrueTeam UUID
fileblobtrueUploaded plugin file (.opk)
uploadOptionsobjectfalseUpload options, you can customize methods such as onProgress
  • Get file example
import { get } from 'lodash-es'

const input = (
<div>
<input
type="file"
accept=".opk"
onChange={(e) => {
const file = get(e, ['target', 'files', 0])
uploadPlugin({ organization, team, file })
}}
/>
</div>
)

Response​

{
"data": {
"id": 1,
"create_time": 1656558473,
"update_time": 0,
"deleted": false,
"org_uuid": "JGpj1YSe",
"team_uuid": "EW5GozZh",
"app_uuid": "lt1ZZuQQ",
"name": "plugin.opk",
"size": 0,
"path": "/data/app/ones-platform-api/P8065/plugin/JGlk1YSp/EW5GocZh/lt2ZZtQQ/1.0.0/",
"version": "1.0.0",
"executable_file_path": "",
"config_file_path": "",
"web_file_path": "",
"icon": "",
"new_version": "",
"is_upgrade": false
}
}

2. installPlugin​

  • Install plugin
  • Post method of uploadPlugin, uploadPlugin returns the value app_uuid as the value of the method input parameter app

URL​

  • /plugin/install

Parameter​

Parameter NameTyp eRequiredDefaultDescription
scene'TEAM' | 'ORG'false'TEAM'Usage Scenarios
organizationstringtrueOrganization UUID
teamstringtrueTeam UUID
appstringtruePlugin UUID

Response​

{
"data": [
{
"apis": [],
"package_path": "/data/app/ones-platform-api/P8065/plugin/JGpj1YSe/EW5Goz3C706E1S-9A67-4F19-9B23-FA7S32C7DB53/1.0.4/",
"service": {
"app_id": "3C706E1S-9A67-4F19-9B23-FA7S32C7DB53",
"instance_id": "c7cb75c9",
"name": "plugin name",
"version": "1.0.4",
"language": "golang",
"language_version": "1.14.0",
"host_version": "0.2.0",
"host_sub_version": "1.14.0",
"min_system_version": "3.2.0",
"description": "description description description",
"contact": "",
"status": 0,
"org_uuid": "JGpj2YSq",
"team_uuid": "EW9GozZh",
"config": null,
"auth": null,
"permission": [],
"path": "",
"icon": ""
},
"modules": null,
"abilities": []
}
]
}

3. upgradePlugin​

  • Upgrade plugin
  • Post method of uploadPlugin, should be called when uploadPlugin returns is_upgrade as true
  • uploadPlugin returns the value app_uuid as the value of the method input parameter app

URL​

  • Team scene: /plugin/upgrade2
  • Organization scene: /plugin/upgrade

Parameter​

Parameter NameTypeRequiredDefaultDescription
scene'TEAM' | 'ORG'false'TEAM'Usage Scenarios
organizationstringtrueOrganization UUID
teamstringtrueTeam UUID
appstringtruePlugin UUID

Response​

{
"data": [
{
"apis": [
{
"methods": [
"POST"
],
"url": "/hello",
"type": "addition",
"function": "hello",
"team_uuid": "37WvfbQR",
"scope": ""
}
],
"package_path": "/data/plugin/upload/U8CBemsb/37WvfbQR/B1UTeLsW/1.0.2/",
"service": {
"app_id": "B1UTeLsW",
"instance_id": "c6a7081a",
"name": "Fetch",
"version": "1.0.2",
"language": "nodejs",
"language_version": "16.13.0",
"host_version": "1.0.4",
"host_sub_version": "1.0.0",
"min_system_version": "3.5.0",
"description": "Fetch api test 1.0.1",
"contact": "",
"status": 0,
"org_uuid": "U8CBemsb",
"team_uuid": "37WvfbQR",
"config": null,
"auth": null,
"permission": null,
"path": "",
"icon": ""
},
"modules": [
{
"entry": "modules/ones-workspace-new-uu1d/index.html",
"id": "ones-workspace-new-uu1d",
"moduleType": "ones:workspace:new",
"title": "upload"
}
],
"abilities": []
}
]
}

4. deletePlugin​

  • Delete plugin
  • The pre-method uploadPlugin needs to be called first, and the app_uuid, id in the return value are used as the value of the method input parameters app, id

URL​

  • plugin/delete_opk

Parameter​

Parameter NameTypeRequiredDe faultDescription
scene'TEAM' | 'ORG'false'TEAM'Usage Scenarios
organizationstringtrueOrganization UUID
teamstringtrueTeam UUID
appstringtruePlugin UUID
idstringtrueUpload file id

Response​

{
"data": true
}

5. uninstallPlugin​

  • Uninstall plugin
  • Plugins should be uninstalled with plugins stopped.

URL​

  • plugin/uninstall

Parameter​

Parameter NameTypeRequiredDefaultDescription
scene'TEAM' | 'ORG'false'TEAM'Usage Scenarios
organizationstringtrueOrganization UUID
teamstringtrueTeam UUID
appstringtruePlugin UUID
instancestringtruePlugin Instance UUID

Response​

{
"data": true
}

6. startPlugin​

  • Start plugin

URL​

  • plugin/enable

Parameter​

Parameter NameTypeRequiredDefaultDescription
scene'TEAM' | 'ORG'false'TEAM'Usage Scenarios
organizationstringtrueOrganization UUID
teamstringtrueTeam UUID
appstringtruePlugin UUID
instancestringtruePlugin Instance UUID

Response​

{
"data": true
}

7. stopPlugin​

  • Stop plugin
  • The plugin can be forcibly disabled by set the forced parameter to true

URL​

  • /plugin/disable

Parameter​

Parameter NameTypeRequiredDefaultDescription
scene'TEAM' | 'ORG'false'TEAM'Usage Scenarios
organizationstringtrueOrganization UUID
teamstringtrueTeam UUID
appstringtruePlugin UUID
instancestringtruePlugin Instance UUID
forcedbooleanfalsefalseWhether to force disable

Response​

{
"data": true
}

8. getPluginsList​

  • Get a list of plugins

URL​

  • /plugin/list

Parameter​

Parameter NameTypeRequiredDefaultDescription
scene'TEAM' | 'ORG'false'TEAM'
organizationstringtrueOrganization UUID
teamstringtrueTeam UUID

Response​

{
"data": [
{
"apis": [],
"package_path": "",
"service": {
"app_id": "lt1ZZuQQ",
"instance_id": "075d18c7",
"name": "naaaa",
"version": "1.0.0",
"language": "",
"language_version": "",
"host_version": "",
"host_sub_version": "",
"min_system_version": "",
"description": "1.122233333; 2.4334434334",
"contact": "",
"status": 2,
"org_uuid": "JGpj1YSe",
"team_uuid": "EW5GozZh",
"config": null,
"auth": null,
"permission": null,
"path": "/JGpj1YSe/EW5GozZh/lt1ZZuQQ/1.0.0/",
"icon": "/plugin/JGpj1YSe/EW5GozZh/lt1ZZuQQ/1.0.0/logo.svg"
},
"modules": [],
"abilities": []
}
]
}

9. getPluginDetail​

  • Get plugin information details

URL​

  • /plugin/info

Parameter​

Parameter NameTypeRequiredDefaultDescription
scene'TEAM' | 'ORG'false'TEAM'
organizationstringtrueOrganization UUID
teamstringtrueTeam UUID
appstringtruePlugin UUID
instancestringtruePlugin Instance UUID

Response​

{
"uuid": "DU6krHBN",
"email": "niuqiang@ones.com",
"name": "nisssss",
"name_pinyin": "hui4fei1dexi1niu2zhang3",
"title": "",
"avatar": "",
"phone": "",
"create_time": 1565770697227728,
"access_time": 0,
"status": 1,
"org_uuid": "AbsatFo2"
}

10. getPluginConfigs​

  • Get the configuration item array of the plugin function configuration page
  • config

URL​

  • /plugin/config/list

Parameter​

Parameter NameTypeRequiredDefaultDescription
scene'TEAM' | 'ORG'false'TEAM'
organizationstringtrueOrganization UUID
teamstringtrueTeam UUID
instancestringtruePlugin Instance UUID

Response​

{
"data": []
}

11. getPluginAbilities​

  • Get the ability configuration of the plugin
  • abilities

URL​

  • /plugin/config/ability/list

Parameter​

Parameter NameTypeRequiredDefaultDescription
scene'TEAM' | 'ORG'false'TEAM'
organizationstringtrueOrganization UUID
teamstringtrueTeam UUID
instancestringtruePlugin Instance UUID

Response​

{
"data": null
}

12. updatePluginAbilities​

  • Update plugin abilities configuration
  • abilities

URL​

  • /plugin/config/ability/batch_update

Parameter​

Parameter NameTypeRequiredDefaultDescription
scene'TEAM' | 'ORG'false'TEAM'
organizationstringtrueOrganization UUID
teamstringtrueTeam UUID
instancestringtruePlugin Instance UUID
configsobjecttrueability configs

Response​

{
"uuid": "DU6krHBN",
"email": "niuqiang@ones.com",
"name": "flyyyyy",
"name_pinyin": "hui4fei1dexi1niu2zhang3",
"title": "",
"avatar": "",
"phone": "",
"create_time": 1565770697227728,
"access_time": 0,
"status": 1,
"org_uuid": "AbsatFo2"
}

13. batchUpdatePluginConfig​

URL​

  • /plugin/config/batch_update

Parameter​

Parameter NameTypeRequiredDefaultDescription
scene'TEAM' | 'ORG'false'TEAM'
organizationstringtrueOrganization UUID
teamstringtrueTeam UUID
instancestringtruePlugin Instance UUID
configsobjecttrueConfiguration items

Response​

{
"uuid": "DU6krHBN",
"email": "niuqiang@ones.com",
"name": "会飞的犀牛长",
"name_pinyin": "hui4fei1dexi1niu2zhang3",
"title": "",
"avatar": "",
"phone": "",
"create_time": 1565770697227728,
"access_time": 0,
"status": 1,
"org_uuid": "AbsatFo2"
}

14. getCustomPermissions​

URL​

  • /plugin/permissioninfo/list

Parameter​

Parameter NameTypeRequiredDefaultDescription
scene'TEAM' | 'ORG'false'TEAM'
organizationstringtrueOrganization UUID
teamstringtrueTeam UUID
instancestringtruePlugin Instance UUID

Response​

{
"data": [
{
"organization_uuid": "JGrg2YSe",
"team_uuid": "EW9GftZh",
"instance_uuid": "428a1243",
"permission_name": "ddddd",
"permission_field": "manage_filter_view_push",
"permission_id": 56378,
"permission_desc": "ddddddddddd",
"rule_info": []
}
]
}

15. addCustomPermissionDomain​

  • Add the permission point configuration of the plugin
  • permission

URL​

  • /plugin/permissionrule/add

Parameter​

Parameter NameTypeRequiredDefaultDescription
scene'TEAM' | 'ORG'false'TEAM'
organizationstringtrueOrganization UUID
teamstringtrueTeam UUID
permissionDomainobjecttruePermission Domain
  • permissionDomain example
{
"permissionDomain": {
"context_type": "plugin",
"context_param": {
"plugin_uuid": "4d2eb3c0"
},
"permission": 57459,
"user_domain_type": "single_user",
"user_domain_param": "7BnuPj7S"
}
}

Response​

{
"data": {
"id": 1,
"create_time": 1656562042,
"update_time": 1656562042,
"deleted": false,
"org_uuid": "JGpj1YSe",
"team_uuid": "EW5GozZh",
"permission_id": 56378,
"context_type": 5001,
"context_param_1": "428a0758",
"context_param_2": "",
"user_domain_type": 10,
"user_domain_param": "WhFspqKJ",
"position": 0
}
}

16. removeCustomPermissionDomain​

  • Remove the permission point configuration of the plugin
  • permission

URL​

  • /plugin/permissionrule/delete

Parameter​

Parameter NameTypeRequiredDefaultDescription
scene'TEAM' | 'ORG'false'TEAM'
organizationstringtrueOrganization UUID
teamstringtrueTeam UUID
permissionDomainIdstringtruePermission UUID

Response​

{
"data": true
}

17. getPluginLog​

  • Preview plugin log
  • A single preview log is limited to 50
  • startTime、endTime need to be handled with unix()
import dayjs from 'dayjs'
import type { Dayjs } from 'dayjs'

const start: Dayjs = dayjs().subtract(6, 'day')
const end: Dayjs = dayjs()

getPluginLog({
// ...
startTime: start.unix(),
endTime: end.unix(),
})

URL​

  • /plugin/log/preview

Parameter​

Parameter NameTypeRequiredDefaultDescription
scene'TEAM' | 'ORG'false'TEAM'
organizationstringtrueOrganization UUID
teamstringtrueTeam UUID
appstringtruePlugin UUID
instancestringtruePlugin Instance UUID
startTimenumbertruePreview log start time
endTimenumbertruePreview log end time

Response​

{
"data": "{\"Level\":\"Info\",\"Role\":\"Plugin\",\"Message\":\"[Plugin] Install\",\"ErrorCode\":\"\",\"Timestamp\":1658241611,\"CauseByMessage\":\"\",\"PluginInstanceDescriptor\":{\"PluginDescriptor\":{\"PluginName\":\"nodejs-plugin-example\",\"AppID\":\"A0UTeLsW\",\"AppVersion\":\"\",\"LanguageName\":\"nodejs\",\"Languageversion\":\"16.13.0\",\"Hostsubversion\":\"1.0.0\",\"Hostversion\":\"1.0.4\",\"Minsystemversion\":\"3.5.0\"},\"InstanceId\":\"3cd2d9a3\",\"OrgId\":\"U8CBemsb\",\"TeamId\":\"37WvfbQR\"},\"HostDescriptor\":{\"HostID\":\"Host-nodejs95974\",\"Name\":\"DefaultNodeJsHost\",\"Language\":\"nodejs\",\"HostVersion\":\"1.0.8\",\"HostSubVersion\":\"1.0.0\",\"MinSystemVersion\":\"3.5.0\",\"LanguageVersion\":\"16.13.1\"},\"HostBootDescriptor\":{\"HostBootID\":\"\",\"Name\":\"\",\"Version\":\"\"},\"PlatformDescriptor\":{\"ID\":\"R0000001\",\"Name\":\"plugin-platform\",\"Version\":\"1.0.0\",\"Address\":\"0.0.0.0\"},\"Ext\":null}\n{\"Level\":\"Info\",\"Time\":\"2022-07-19 22:40:11\",\"Message\":\"[Plugin] Install\"}\n{\"Level\":\"Info\",\"Time\":\"2022-07-19 22:40:11\",\"Message\":\"插件 Install 钩子函数运行成功!\"}\n{\"Level\":\"Info\",\"Time\":\"2022-07-19 22:52:58\",\"Message\":\"[Plugin] Enable\"}\n{\"Level\":\"Info\",\"Time\":\"2022-07-19 22:52:58\",\"Message\":\"插件 Enable 钩子函数运行成功!\"}\n{\"Level\":\"Info\",\"Time\":\"2022-07-19 22:56:58\",\"Message\":\"[Plugin] Disable\"}\n{\"Level\":\"Info\",\"Time\":\"2022-07-19 22:56:58\",\"Message\":\"插件 Disable 钩子函数运行成功!\"}\n"
}

18. exportPluginLog​

  • Export plugin logs
  • Response is download link
  • startTime、endTime need to be handled with unix()
import dayjs from 'dayjs'
import type { Dayjs } from 'dayjs'

const start: Dayjs = dayjs().subtract(6, 'day')
const end: Dayjs = dayjs()

getPluginLog({
// ...
startTime: start.unix(),
endTime: end.unix(),
})

URL​

  • /plugin/log/export

Parameter​

Parameter NameTypeRequiredDefaultDescription
scene'TEAM' | 'ORG'false'TEAM'
organizationstringtrueOrganization UUID
teamstringtrueTeam UUID
appstringtruePlugin UUID
instancestringtruePlugin Instance UUID
startTimenumbertrueExport log start time
endTimenumbertrueExport log end time

Response​

{
"url": "https://mars-dev.myones.net:11200/api/project/plugin/log/download?token=PrEbytovwgYLw422MwNAEp"
}