Fetch API
danger
ONES API 已废弃。请使用Open API。
We provide a set of open platform api, which can be used directly, allowing you to use various capabilities of the plugin management page in your plugin app, such as installPlugin, exportPluginLog, etc.
Compatibility
Environment
| ONES |
|---|
| v3.7.6+ |
Install
Go to the /web directory and install this package with the following command:
- npm
- Yarn
- pnpm
npm install @ones-op/fetch
yarn add @ones-op/fetch
pnpm add @ones-op/fetch
Use
import { getPluginsList } from '@ones-op/fetch'
function PluginList() {
const team = 'your_team'
const organization = 'your_organization'
useEffect(() => {
getPluginsList({
team,
organization,
})
.then(console.log)
.catch(console.error)
}, [])
return <div>fetch api demo</div>
}
Overview
@ones-op/fetchAPI is written in REST style.@ones-op/fetchAPI distinguish usage scenarios by parameterscene- Team scene
'TEAM', the default scene - Organizing scene
'ORG'
- Team scene
@ones-op/fetchAPI other common parameters are- Team UUID
team,permission checkpoint in team scene. - Organization UUID
organization,permission checkpoint in organizing scene. - Plugin UUID
app - Plugin Instance UUID
instance
- Team UUID
Implementation
There is no need to pay attention to this part during the development process. Here is the implementation introduction, and developers can choose to read it.
URI Structure
@ones-op/fetch API provides access to resources via a URI path. Use :team or {} to mark part of the URI path as part of the URI path that can be replaced with parameters. URI paths follow these rules:
http(s)://{your-host-name}/project/api/project/team/:team/{fetch-api}
for example:
https://my-host-name/project/api/project/team/EW5GozZh/plugin/list
https://my-host-name/project/api/project/team/EW5GozZh/plugin/config/list
{fetch-api}is theurlof the @ones-op/fetch API/plugin/listis theurlofgetPluginsList/plugin/config/listis theurlofgetPluginConfigs
Request Headers
| Parameter Name | Parameter Location | Type | Description |
|---|---|---|---|
| Ones-Plugin-Id | HTTP Headers | string | Instance UUID of the plugin |
| Ones-Check-Point | HTTP Headers | string | Permission checkpoint team/organization |
| Ones-Check-Id | HTTP Headers | string | Permission checkpoint Team UUID /Organization UUID |
Ones-Plugin-Idpasses a fixed value in @ones-op/fetch API:'built_in_apis'.Ones-Check-Pointpasses the parametersceneOnes-Check-Idpasses in the Team UUID or Organization UUID depends on thescene
for example:
--request POST 'https://my-host-name/project/api/project/team/WDRiVkKD/plugin/list'
--header 'Ones-Check-Point: team'
--header 'Ones-Check-Id: WDRiVkKD'
--header 'Ones-Plugin-Id: built_in_apis'
API
1. uploadPlugin
- Upload plugin
- Plugin files are
.opkfiles - The return value
app,idand other attributes are used as input parameters of the post-methodinstallPlugin,upgradePlugin,deletePlugin - The return value
is_upgradeindicates whether the file is an upgrade package
URL
- /plugin/upload_opk
Parameter
| Parameter Name | Type | Required | Default | Description |
|---|---|---|---|---|
| scene | 'TEAM' | 'ORG' | false | 'TEAM' | Usage Scenarios |
| organization | string | true | Organization UUID | |
| team | string | true | Team UUID | |
| file | blob | true | Uploaded plugin file (.opk) | |
| uploadOptions | object | false | Upload options, you can customize methods such as onProgress |
- Get
fileexample
import { get } from 'lodash-es'
const input = (
<div>
<input
type="file"
accept=".opk"
onChange={(e) => {
const file = get(e, ['target', 'files', 0])
uploadPlugin({ organization, team, file })
}}
/>
</div>
)
Response
{
"data": {
"id": 1,
"create_time": 1656558473,
"update_time": 0,
"deleted": false,
"org_uuid": "JGpj1YSe",
"team_uuid": "EW5GozZh",
"app_uuid": "lt1ZZuQQ",
"name": "plugin.opk",
"size": 0,
"path": "/data/app/ones-platform-api/P8065/plugin/JGlk1YSp/EW5GocZh/lt2ZZtQQ/1.0.0/",
"version": "1.0.0",
"executable_file_path": "",
"config_file_path": "",
"web_file_path": "",
"icon": "",
"new_version": "",
"is_upgrade": false
}
}
2. installPlugin
- Install plugin
- Post method of
uploadPlugin,uploadPluginreturns the valueapp_uuidas the value of the method input parameterapp
URL
- /plugin/install
Parameter
| Parameter Name | Typ e | Required | Default | Description |
|---|---|---|---|---|
| scene | 'TEAM' | 'ORG' | false | 'TEAM' | Usage Scenarios |
| organization | string | true | Organization UUID | |
| team | string | true | Team UUID | |
| app | string | true | Plugin UUID |
Response
{
"data": [
{
"apis": [],
"package_path": "/data/app/ones-platform-api/P8065/plugin/JGpj1YSe/EW5Goz3C706E1S-9A67-4F19-9B23-FA7S32C7DB53/1.0.4/",
"service": {
"app_id": "3C706E1S-9A67-4F19-9B23-FA7S32C7DB53",
"instance_id": "c7cb75c9",
"name": "plugin name",
"version": "1.0.4",
"language": "golang",
"language_version": "1.14.0",
"host_version": "0.2.0",
"host_sub_version": "1.14.0",
"min_system_version": "3.2.0",
"description": "description description description",
"contact": "",
"status": 0,
"org_uuid": "JGpj2YSq",
"team_uuid": "EW9GozZh",
"config": null,
"auth": null,
"permission": [],
"path": "",
"icon": ""
},
"modules": null,
"abilities": []
}
]
}
3. upgradePlugin
- Upgrade plugin
- Post method of
uploadPlugin, should be called whenuploadPluginreturnsis_upgradeastrue uploadPluginreturns the valueapp_uuidas the value of the method input parameterapp
URL
- Team scene: /plugin/upgrade2
- Organization scene: /plugin/upgrade
Parameter
| Parameter Name | Type | Required | Default | Description |
|---|---|---|---|---|
| scene | 'TEAM' | 'ORG' | false | 'TEAM' | Usage Scenarios |
| organization | string | true | Organization UUID | |
| team | string | true | Team UUID | |
| app | string | true | Plugin UUID |
Response
{
"data": [
{
"apis": [
{
"methods": [
"POST"
],
"url": "/hello",
"type": "addition",
"function": "hello",
"team_uuid": "37WvfbQR",
"scope": ""
}
],
"package_path": "/data/plugin/upload/U8CBemsb/37WvfbQR/B1UTeLsW/1.0.2/",
"service": {
"app_id": "B1UTeLsW",
"instance_id": "c6a7081a",
"name": "Fetch",
"version": "1.0.2",
"language": "nodejs",
"language_version": "16.13.0",
"host_version": "1.0.4",
"host_sub_version": "1.0.0",
"min_system_version": "3.5.0",
"description": "Fetch api test 1.0.1",
"contact": "",
"status": 0,
"org_uuid": "U8CBemsb",
"team_uuid": "37WvfbQR",
"config": null,
"auth": null,
"permission": null,
"path": "",
"icon": ""
},
"modules": [
{
"entry": "modules/ones-workspace-new-uu1d/index.html",
"id": "ones-workspace-new-uu1d",
"moduleType": "ones:workspace:new",
"title": "upload"
}
],
"abilities": []
}
]
}
4. deletePlugin
- Delete plugin
- The pre-method
uploadPluginneeds to be called first, and theapp_uuid,idin the return value are used as the value of the method input parametersapp,id
URL
- plugin/delete_opk
Parameter
| Parameter Name | Type | Required | De fault | Description |
|---|---|---|---|---|
| scene | 'TEAM' | 'ORG' | false | 'TEAM' | Usage Scenarios |
| organization | string | true | Organization UUID | |
| team | string | true | Team UUID | |
| app | string | true | Plugin UUID | |
| id | string | true | Upload file id |
Response
{
"data": true
}
5. uninstallPlugin
- Uninstall plugin
- Plugins should be uninstalled with plugins stopped.
URL
- plugin/uninstall
Parameter
| Parameter Name | Type | Required | Default | Description |
|---|---|---|---|---|
| scene | 'TEAM' | 'ORG' | false | 'TEAM' | Usage Scenarios |
| organization | string | true | Organization UUID | |
| team | string | true | Team UUID | |
| app | string | true | Plugin UUID | |
| instance | string | true | Plugin Instance UUID |
Response
{
"data": true
}
6. startPlugin
- Start plugin
URL
- plugin/enable
Parameter
| Parameter Name | Type | Required | Default | Description |
|---|---|---|---|---|
| scene | 'TEAM' | 'ORG' | false | 'TEAM' | Usage Scenarios |
| organization | string | true | Organization UUID | |
| team | string | true | Team UUID | |
| app | string | true | Plugin UUID | |
| instance | string | true | Plugin Instance UUID |
Response
{
"data": true
}
7. stopPlugin
- Stop plugin
- The plugin can be forcibly disabled by set the
forcedparameter totrue
URL
- /plugin/disable
Parameter
| Parameter Name | Type | Required | Default | Description |
|---|---|---|---|---|
| scene | 'TEAM' | 'ORG' | false | 'TEAM' | Usage Scenarios |
| organization | string | true | Organization UUID | |
| team | string | true | Team UUID | |
| app | string | true | Plugin UUID | |
| instance | string | true | Plugin Instance UUID | |
| forced | boolean | false | false | Whether to force disable |
Response
{
"data": true
}
8. getPluginsList
- Get a list of plugins
URL
- /plugin/list
Parameter
| Parameter Name | Type | Required | Default | Description |
|---|---|---|---|---|
| scene | 'TEAM' | 'ORG' | false | 'TEAM' | |
| organization | string | true | Organization UUID | |
| team | string | true | Team UUID |
Response
{
"data": [
{
"apis": [],
"package_path": "",
"service": {
"app_id": "lt1ZZuQQ",
"instance_id": "075d18c7",
"name": "naaaa",
"version": "1.0.0",
"language": "",
"language_version": "",
"host_version": "",
"host_sub_version": "",
"min_system_version": "",
"description": "1.122233333; 2.4334434334",
"contact": "",
"status": 2,
"org_uuid": "JGpj1YSe",
"team_uuid": "EW5GozZh",
"config": null,
"auth": null,
"permission": null,
"path": "/JGpj1YSe/EW5GozZh/lt1ZZuQQ/1.0.0/",
"icon": "/plugin/JGpj1YSe/EW5GozZh/lt1ZZuQQ/1.0.0/logo.svg"
},
"modules": [],
"abilities": []
}
]
}
9. getPluginDetail
- Get plugin information details
URL
- /plugin/info
Parameter
| Parameter Name | Type | Required | Default | Description |
|---|---|---|---|---|
| scene | 'TEAM' | 'ORG' | false | 'TEAM' | |
| organization | string | true | Organization UUID | |
| team | string | true | Team UUID | |
| app | string | true | Plugin UUID | |
| instance | string | true | Plugin Instance UUID |
Response
{
"uuid": "DU6krHBN",
"email": "niuqiang@ones.com",
"name": "nisssss",
"name_pinyin": "hui4fei1dexi1niu2zhang3",
"title": "",
"avatar": "",
"phone": "",
"create_time": 1565770697227728,
"access_time": 0,
"status": 1,
"org_uuid": "AbsatFo2"
}
10. getPluginConfigs
- Get the configuration item array of the plugin function configuration page
- config
URL
- /plugin/config/list
Parameter
| Parameter Name | Type | Required | Default | Description |
|---|---|---|---|---|
| scene | 'TEAM' | 'ORG' | false | 'TEAM' | |
| organization | string | true | Organization UUID | |
| team | string | true | Team UUID | |
| instance | string | true | Plugin Instance UUID |
Response
{
"data": []
}
11. getPluginAbilities
- Get the ability configuration of the plugin
- abilities
URL
- /plugin/config/ability/list
Parameter
| Parameter Name | Type | Required | Default | Description |
|---|---|---|---|---|
| scene | 'TEAM' | 'ORG' | false | 'TEAM' | |
| organization | string | true | Organization UUID | |
| team | string | true | Team UUID | |
| instance | string | true | Plugin Instance UUID |
Response
{
"data": null
}
12. updatePluginAbilities
- Update plugin abilities configuration
- abilities
URL
- /plugin/config/ability/batch_update
Parameter
| Parameter Name | Type | Required | Default | Description |
|---|---|---|---|---|
| scene | 'TEAM' | 'ORG' | false | 'TEAM' | |
| organization | string | true | Organization UUID | |
| team | string | true | Team UUID | |
| instance | string | true | Plugin Instance UUID | |
| configs | object | true | ability configs |
Response
{
"uuid": "DU6krHBN",
"email": "niuqiang@ones.com",
"name": "flyyyyy",
"name_pinyin": "hui4fei1dexi1niu2zhang3",
"title": "",
"avatar": "",
"phone": "",
"create_time": 1565770697227728,
"access_time": 0,
"status": 1,
"org_uuid": "AbsatFo2"
}
13. batchUpdatePluginConfig
- 批量更新插件配置
- 详见文档 config 部分
URL
- /plugin/config/batch_update
Parameter
| Parameter Name | Type | Required | Default | Description |
|---|---|---|---|---|
| scene | 'TEAM' | 'ORG' | false | 'TEAM' | |
| organization | string | true | Organization UUID | |
| team | string | true | Team UUID | |
| instance | string | true | Plugin Instance UUID | |
| configs | object | true | Configuration items |
Response
{
"uuid": "DU6krHBN",
"email": "niuqiang@ones.com",
"name": "会飞的犀牛 长",
"name_pinyin": "hui4fei1dexi1niu2zhang3",
"title": "",
"avatar": "",
"phone": "",
"create_time": 1565770697227728,
"access_time": 0,
"status": 1,
"org_uuid": "AbsatFo2"
}
14. getCustomPermissions
- Get the permission point configuration of the plugin
- Custom permission
URL
- /plugin/permissioninfo/list
Parameter
| Parameter Name | Type | Required | Default | Description |
|---|---|---|---|---|
| scene | 'TEAM' | 'ORG' | false | 'TEAM' | |
| organization | string | true | Organization UUID | |
| team | string | true | Team UUID | |
| instance | string | true | Plugin Instance UUID |
Response
{
"data": [
{
"organization_uuid": "JGrg2YSe",
"team_uuid": "EW9GftZh",
"instance_uuid": "428a1243",
"permission_name": "ddddd",
"permission_field": "manage_filter_view_push",
"permission_id": 56378,
"permission_desc": "ddddddddddd",
"rule_info": []
}
]
}
15. addCustomPermissionDomain
- Add the permission point configuration of the plugin
- permission
URL
- /plugin/permissionrule/add
Parameter
| Parameter Name | Type | Required | Default | Description |
|---|---|---|---|---|
| scene | 'TEAM' | 'ORG' | false | 'TEAM' | |
| organization | string | true | Organization UUID | |
| team | string | true | Team UUID | |
| permissionDomain | object | true | Permission Domain |
- permissionDomain example
{
"permissionDomain": {
"context_type": "plugin",
"context_param": {
"plugin_uuid": "4d2eb3c0"
},
"permission": 57459,
"user_domain_type": "single_user",
"user_domain_param": "7BnuPj7S"
}
}
Response
{
"data": {
"id": 1,
"create_time": 1656562042,
"update_time": 1656562042,
"deleted": false,
"org_uuid": "JGpj1YSe",
"team_uuid": "EW5GozZh",
"permission_id": 56378,
"context_type": 5001,
"context_param_1": "428a0758",
"context_param_2": "",
"user_domain_type": 10,
"user_domain_param": "WhFspqKJ",
"position": 0
}
}
16. removeCustomPermissionDomain
- Remove the permission point configuration of the plugin
- permission
URL
- /plugin/permissionrule/delete
Parameter
| Parameter Name | Type | Required | Default | Description |
|---|---|---|---|---|
| scene | 'TEAM' | 'ORG' | false | 'TEAM' | |
| organization | string | true | Organization UUID | |
| team | string | true | Team UUID | |
| permissionDomainId | string | true | Permission UUID |
Response
{
"data": true
}
17. getPluginLog
- Preview plugin log
- A single preview log is limited to 50
startTime、endTimeneed to be handled withunix()
import dayjs from 'dayjs'
import type { Dayjs } from 'dayjs'
const start: Dayjs = dayjs().subtract(6, 'day')
const end: Dayjs = dayjs()
getPluginLog({
// ...
startTime: start.unix(),
endTime: end.unix(),
})
URL
- /plugin/log/preview
Parameter
| Parameter Name | Type | Required | Default | Description |
|---|---|---|---|---|
| scene | 'TEAM' | 'ORG' | false | 'TEAM' | |
| organization | string | true | Organization UUID | |
| team | string | true | Team UUID | |
| app | string | true | Plugin UUID | |
| instance | string | true | Plugin Instance UUID | |
| startTime | number | true | Preview log start time | |
| endTime | number | true | Preview log end time |
Response
{
"data": "{\"Level\":\"Info\",\"Role\":\"Plugin\",\"Message\":\"[Plugin] Install\",\"ErrorCode\":\"\",\"Timestamp\":1658241611,\"CauseByMessage\":\"\",\"PluginInstanceDescriptor\":{\"PluginDescriptor\":{\"PluginName\":\"nodejs-plugin-example\",\"AppID\":\"A0UTeLsW\",\"AppVersion\":\"\",\"LanguageName\":\"nodejs\",\"Languageversion\":\"16.13.0\",\"Hostsubversion\":\"1.0.0\",\"Hostversion\":\"1.0.4\",\"Minsystemversion\":\"3.5.0\"},\"InstanceId\":\"3cd2d9a3\",\"OrgId\":\"U8CBemsb\",\"TeamId\":\"37WvfbQR\"},\"HostDescriptor\":{\"HostID\":\"Host-nodejs95974\",\"Name\":\"DefaultNodeJsHost\",\"Language\":\"nodejs\",\"HostVersion\":\"1.0.8\",\"HostSubVersion\":\"1.0.0\",\"MinSystemVersion\":\"3.5.0\",\"LanguageVersion\":\"16.13.1\"},\"HostBootDescriptor\":{\"HostBootID\":\"\",\"Name\":\"\",\"Version\":\"\"},\"PlatformDescriptor\":{\"ID\":\"R0000001\",\"Name\":\"plugin-platform\",\"Version\":\"1.0.0\",\"Address\":\"0.0.0.0\"},\"Ext\":null}\n{\"Level\":\"Info\",\"Time\":\"2022-07-19 22:40:11\",\"Message\":\"[Plugin] Install\"}\n{\"Level\":\"Info\",\"Time\":\"2022-07-19 22:40:11\",\"Message\":\"插件 Install 钩子函数运行成功!\"}\n{\"Level\":\"Info\",\"Time\":\"2022-07-19 22:52:58\",\"Message\":\"[Plugin] Enable\"}\n{\"Level\":\"Info\",\"Time\":\"2022-07-19 22:52:58\",\"Message\":\"插件 Enable 钩子函数运行成功!\"}\n{\"Level\":\"Info\",\"Time\":\"2022-07-19 22:56:58\",\"Message\":\"[Plugin] Disable\"}\n{\"Level\":\"Info\",\"Time\":\"2022-07-19 22:56:58\",\"Message\":\"插件 Disable 钩子函数运行成功!\"}\n"
}
18. exportPluginLog
- Export plugin logs
- Response is download link
startTime、endTimeneed to be handled withunix()
import dayjs from 'dayjs'
import type { Dayjs } from 'dayjs'
const start: Dayjs = dayjs().subtract(6, 'day')
const end: Dayjs = dayjs()
getPluginLog({
// ...
startTime: start.unix(),
endTime: end.unix(),
})
URL
- /plugin/log/export
Parameter
| Parameter Name | Type | Required | Default | Description |
|---|---|---|---|---|
| scene | 'TEAM' | 'ORG' | false | 'TEAM' | |
| organization | string | true | Organization UUID | |
| team | string | true | Team UUID | |
| app | string | true | Plugin UUID | |
| instance | string | true | Plugin Instance UUID | |
| startTime | number | true | Export log start time | |
| endTime | number | true | Export log end time |
Response
{
"url": "https://mars-dev.myones.net:11200/api/project/plugin/log/download?token=PrEbytovwgYLw422MwNAEp"
}