Skip to main content

Actions

Introduction​

We call an operation in the ONES system as an "Action". For example, uploading files and opening the work hours registration pop-up window in the ONES system are both "Actions".

An Action is essentially a function. In the slot ones:global:actions, you can use useGlobalAction in @ones-op/sdk to hijack these functions in the ONES system.

useGlobalAction takes two parameters, the name of the Action and the hijacking function for that Action.

The hijacking function will execute when the corresponding Action is called. The first parameter of the hijacking function is a next function which will call the original action. The remaining parameters are the parameters of the original action.

For example, you can use the following code to hijack the file upload action in the ONES system:

Pre-hijack​

import { useGlobalAction } from '@ones-op/sdk'

function App() {
useGlobalAction('uploadFile', async (next, tokenOptions, requestOptions) => {
// Do some operations before calling next(), that is, before uploading the file
doSomethingByTheParamsOfTheAction(tokenOptions, requestOptions)
return await next(tokenOptions, requestOptions)
})
return null
}

ReactDOM.render(<App />, document.getElementById('root'))

Replace-hijack​

import { useGlobalAction } from '@ones-op/sdk'

function App() {
useGlobalAction('uploadFile', async (next, tokenOptions, requestOptions) => {
// Don't call next(), directly replace the implementation of the file upload operation
return doSomethingByTheParamsToReplaceTheAction(tokenOptions, requestOptions)
})
return null
}

ReactDOM.render(<App />, document.getElementById('root'))

Post-hijack​

import { useGlobalAction } from '@ones-op/sdk'

function App() {
useGlobalAction('uploadFile', async (next, tokenOptions, requestOptions) => {
const result = await next(tokenOptions, requestOptions)
// Do some operations after calling next(), that is, after the file is uploaded
doSomethingByTheResultsAfterTheAction(result)
return result
})
return null
}

ReactDOM.render(<App />, document.getElementById('root'))

Actions List​

uploadFile​

ONES v6.0.32+

Upload a file in the ONES system

Parameters

enum UploadRefType {
TASK = 'task', // work item
SPACE = 'space', // wiki page group
DELIVERABLE = 'deliverable', // milestone
TESTCASE = 'testcase', // test case
PLAC_CASE = 'plan_case', // test plan case
}

interface TokenOptions {
ref_type: UploadRefType // The type of the item to which the uploaded file belongs
ref_id: string // The uuid of the item to which the uploaded file belongs, depending on the ref_type, respectively correspond to work item ID, wiki page group ID, milestone ID, test case ID, test plan case ID
name: string // file name
description?: string // file description
type?: string // The file type, usually 'attachment', means the uploaded file is an attachment; if it is a scenario of importing a word document into the wiki, the value of this field is 'word'
}

interface RequestOptions {
file: File
}
Parameter nameTypeDescription
tokenOptionsTokenOptionsToken configuration for the file upload, including the business type that triggered the file upload, file name, file description, etc.
uploadOptionsRequestOptionsConfiguration for the file upload, including the file object

Return value

type UploadFileResponse = Promise<{
uuid: string // file uuid
}>

recordManhour​

ONES v6.0.32+

Open the record manhour popup in ONES

Parameters

interface RecordManhourOptions {
scene: 'task_create' | 'task_detail' | 'resource' | 'task_transition' | 'workspace_manhour' // Business scenario
isAdd?: boolean // Whether it is the scene to add manhours
// Mode and type
mode: 'detailed' | 'simple' // Summary / Simple mode
type: 'recorded' | 'estimated' // Logged / Estimated
project?: string // Project UUID, providing context for adding estimated manhours
issueType?: string // Work item type UUID, providing context for adding estimated manhours

// Form data, consistent with the backend data structure, can modify the form data and pass it to the backend
formData: {
// If modifying manhour data (non-draft), a key is needed. Use the key to get the complete data.
key?: string // Manhour data key. eg: manhour-xxxxx

// Mode and type, mainly for backend data recognition
mode: 'detailed' | 'simple' // Summary / Simple mode
type: 'recorded' | 'estimated' // Logged / Estimated

// Related work items and members
task?: string // Work item UUID
owner?: string // Member UUID

// Use the time range (from to include_mon_working_day) only for estimated manhours
from?: number // Start time
to?: number // End time
include_mon_working_day?: 0 | 1 // Whether to include non-working days
startTime?: number // Start time, used in scenarios other than from to
hours?: number // Estimated or actual input time, for example: 1 hour is represented as 100000
hours_format?: 'avg' | 'sum' // Estimated input time by daily or total
description?: string // Description, used only for logging manhours
}

// Data returned by the platform (plugin) to the main application:
// Create, Update, Delete.
// May be called multiple times, e.g., draft scenario.
onFinish: (params: {
action: 'add' | 'update' | 'delete' | 'edit'
formData: Pick<ManhourInputProps, 'formData'> // Return the data structure, specific usage defined upstream.
}) => Promise<void> // Call onFinish after completing the manhour action
}
Parameter nameTypeDescription
optionsRecordManhourOptionsForm content, business scenario, and other information when opening the popup