Skip to main content

Editor service

The development of the editor service for the WIKI access new page node type plug-in is divided into tree steps

  • Independent application development
  • Add Editor Module
  • Add independent application abilities

Independent application development​

Step 1: Write independent application management scripts​

For example, name of the standalone application executable program is:GrapeCityServer

workspace/start.sh
#!/bin/bash
usage() {
echo -e "Usage: $(basename $0) [options]"
echo -e " start "

exit 1
}
# Processing startup services
start() {
echo "/usr/bin/nohup ./GrapeCityServer --port=$PARAMS_PORT --args=$ARGS >/dev/null 2>&1 &"
/usr/bin/nohup ./GrapeCityServer --port=$PARAMS_PORT --args=$ARGS > nohup.out 2>&1 &
}
# Process Stop Service
stop() {
# The pid.txt here must be consistent with the internal service
echo "kill -9 $(cat pid.txt)"
kill -9 "$(cat pid.txt)"
}
parse_config() {
for arg in ${ARGS}
do
case ${arg} in
--port=*)
PARAMS_PORT=${arg#*=}
;;
--path=*)
PATH=${arg#*=}
;;
--args=*)
ARGS=${arg#*=}
;;
esac
done
}
ARGS="$@"
# This is the entrance
parse_config
case $1 in
help) usage;;
start) start;;
stop) stop;;
*) usage;;
esac

Step 2: Develop the independent program​

//Goland
package main

var (
port int
args string
)

func initFlags() {
flag.IntVar(&port, "port", 18000, "service port")
flag.StringVar(&args, "args", "", "service other parameters")
flag.Parse()
parse_other_args()
}

func parse_other_args() {
//Parse the args string according to the specifications
}

//Save independent application's process PID
func savePid() {
pid := os.Getpid()
log.Infof("process PID: %d \n", pid)

err := os.WriteFile("./pid.txt", []byte(strconv.Itoa(pid)), 0644)
if err != nil {
log.Fatalf("Logging PID failed: %+v", err)
}
}

func main() {
//Parsing parameters
initFlags()
savePid()

//...
//start web service
addr := fmt.Sprintf("%s:%d", "localhost", port)

//The function can be seen in step 3
// router.Run

err := router.Run(addr)
if err != nil {
log.Fatal("start service fail")
}
}

Custom Editor Server services need to support http and websocket methods, mainly including:

//Goland
package router

func Run(addr string) error {
gin.SetMode(gin.ReleaseMode)
app := gin.New()

//http request
app.POST("/tokens", controllers.GetToken)

//websocket request
app.GET("/edit", controllers.Edit)

return app.Run(addr)
}

Step 4: Compile into an executable file and verify the compatibility of the executable file​

Add Editor Module​

To develop a slot, it may be necessary to obtain a standalone application (Editor Server) URL address. The following provides a detailed interface for obtaining independent service address information

Get URL address for independent services​

According to the app_id of the plugin, We can obtain independent service address information.

URL​

https://{your-host-name}/project/api/project/plugin/web_service/info

HTTP Method​

POST

Need Login​

yes

Value passing​

JSON

parameters​

Header

namerequirevalue typeexampleillustrate
Content-TypeTstringapplication/jsonData in JSON format
Ones-Check-PointTstringteamFixed value
Ones-Plugin-IdTstringbuilt_in_apisFixed value
Ones-Check-IdTstringATVswGgyteam_uuid, used for verification
Ones-User-IdTstring4qumKXgMuser_uuid, used for verification
OriginFstringhttps://xxxx.comBase address of ONES

Body

namerequirevalue typeexampleillustrate
app_idTstring"Xy4-EYjw"The app_id information of the plugin.
base_urlFstringhttps://xxxx.comBase address of ONES. This field is used first. If it is empty, the Origin field in the Header will be used.

Return parameter​

namevalue typeexampleillustrate
data[]objectSee data objectReturn data array data

data object

namevalue typeexampleillustrate
app_idstringXy4-EYjwapp_id of the plugin
root_routestring/node_demoindependent services and routing information
http_urlstringhttps://xxx.com/node_demoindependent service http address
ws_urlstringwss://xxx.com/node_demoindependent service websocket address

Request Example​

curl --location --request POST 'https://xxx.com/project/api/project/plugin/web_service/info' \
--header 'Ones-Check-Id: ATVswGgy' \
--header 'Ones-Check-Point: team' \
--header 'Ones-Plugin-Id: built_in_apis' \
--header 'Ones-User-Id: 4qumKXgM' \
--header 'Content-Type: application/json' \
--header 'Origin: https://xxx.com/' \
--data-raw '{
"base_url": "https://xxx.com/",
"app_id": "VGh6Y6N"
}'

Return Example​

{
"data": [
{
"app_id": "VGh6Y6N",
"root_route": "/hello",
"http_url": "https://xxx.com/plugin_service/hello",
"ws_url": "wss://xxx.com/api/plugin_service_ws/hello"
}
]
}

Add independent application abilities​

The configuration is as follows: it can be modified as needed.

config/plugin.yaml
abilities:
- id: xxxxxxxx
name: xxxxxxx_GrapeCityServer
abilityType: web_service
version: 1.0.0
config:
- fieldType: Input
key: root_route
show: false
value: /GrapeCityServer
- fieldType: Input
key: args
show: true
value: ''
- fieldType: Input
key: start_file
show: false
value: start.sh
- fieldType: Switch
key: is_open
show: false
value: true